Half Yearly Report and Accounts
Released
Released
Announcement PDF
ACN 148 966 545
AND ITS CONTROLLED ENTITIES
INTERIM FINANCIAL REPORT
For the half year ended 31 December 2023
CONTENTS
Directors’ Report
3
Auditor’s Independence Declaration
15
Consolidated Statement of Profit or Loss and Other Comprehensive Income
16
Consolidated Statement of Financial Position
17
Consolidated Statement of Changes In Equity
18
Consolidated Statement of Cash Flows
19
Notes to the Consolidated Financial Statements
20
Director’s Declaration
28
Independent Auditor’s Review Report
29
FUTURE BATTERY MINERALS LIMITED: INTERIM FINANCIAL REPORT − 31 DECEMBER 2023
2
DIRECTORS’ REPORT
Your Directors present their half-yearly report on the consolidated entity consisting of Future Battery Minerals
Limited (“FBM” or “the Company”) and the entities it controlled at the end of, or during, the period 1 July 2023 to
31 December 2023 (“the Group”).
Directors
The persons who were Directors of Future Battery Minerals Limited during the interim reporting period and up to the
date of this report are:
NAME
POSITION
APPOINTMENT/RESIGNATION
Mr Michael Edwards
Mr Nicholas Rathjen
Appointed on 1 February 2022
Appointed on 18 October 2023
Mr Robin Cox
Mr Neville Power
Mr Trevor Eton
Non-Executive Chairman
Chief Executive Officer
Managing Director
Technical Director
Non-Executive Director
Non-Executive Director
Mr Paul Brown
Non-Executive Director
Appointed on 1 January 2023
Appointed on 20 November 2023
Appointed on 1 February 2021, resigned
22 November 2023
Appointed on 1 July 2023, resigned 11
October 2023
Chief Financial Officer and Joint Company Secretary
Mrs Silfia Morton appointed as Chief Financial Officer in May 2022, and appointed as Joint Company Secretary on 1
December 2022. Mr Matthew Worner resigned as Joint Company Secretary on 31 December 2023.
Review of Operations
During the half year, FBM accelerated exploration at both the Kangaroo Hills Lithium Project and the Nevada Lithium
Project.
The Group’s operating loss for the period ended 31 December 2023 was $3,494,423 (2022: $1,762,076).
FUTURE BATTERY MINERALS LIMITED: INTERIM FINANCIAL REPORT − 31 DECEMBER 2023
3
DIRECTORS’ REPORT
FBM’s focus during the period was on the exploration and advancement of its Kangaroo Hills Lithium Project in
Western Australia and Nevada Lithium Project in Nevada, USA.
Figure 1: FBM lithium assets portfolio
Kangaroo Hills Lithium Project (KHLP), Western Australia – 100% FBM
The Kangaroo Hills Lithium Project (KHLP) is a recent and exciting hard rock lithium discovery located in the
Goldfields region of Western Australia, approximately 17 kms south of the township of Coolgardie. Spodumene
mineralisation within lithium-caesium-tantalum (LCT) pegmatites was discovered during regional exploration
drilling in late 2022.
FUTURE BATTERY MINERALS LIMITED: INTERIM FINANCIAL REPORT − 31 DECEMBER 2023
4
DIRECTORS’ REPORT
Figure 2: KHLP location map including surrounding projects and infrastructure
Phase 2 results
Following the successful completion of Phase 2 drilling during the June 2023 quarter, FBM received the assay results
from the five-hole diamond drilling (DD) programme at Big Red, showing a continuation of high-grade lithium from
spodumene-bearing pegmatites.
Significant results included:
• 23m @ 1.19% Li2O from 44m (KHDD001);
•
10m @ 1.30% Li2O from 25m (KHDD002); and
•
5.9m @ 1.15% Li2O from 0m (KHDD004).
The DD core component of the Phase 2 drilling programme was undertaken to gather further geological information
on Big Red and for utilisation in early stage metallurgical and mineralogy investigation work.
Phase 3 drilling
Phase 3 drilling commenced during the period, initially consisting of a planned 5,000m of Reverse Circulation (RC)
infilling at Big Red and testing of key regional targets Rocky, Eastern Grey, Wallaroo, and Pademelon. As a result of
the early success of the Phase 3 RC programme at Rocky, it was expanded by a further 6,000m in late August.
The initial target generative work successfully identified the targets, Rocky and Eastern Grey, which both host
confirmed pegmatites. The presence of a lithium-bearing pegmatite at Rocky was confirmed through the proximal
result of 5m @ 1.12% Li2O from 104m in KHRC0037.
FUTURE BATTERY MINERALS LIMITED: INTERIM FINANCIAL REPORT − 31 DECEMBER 2023
5
DIRECTORS’ REPORT
As Phase 3 drilling progressed through the period, FBM received two batches of assay results. In October 2023, the
Company announced the receipt of results from an initial 41 RC and DD holes. These holes were focussed on testing
the continuity of Big Red, grid drilling of the Rocky Prospect, and wide-spaced scout drilling of select regional targets
including Pademelon, Eastern Grey, and Wallaroo.
Subsequently, in November 2023, the Company announced a second batch of assay results from a further 53 RC and
DD holes. These holes were predominantly focussed on grid drilling of the Rocky Prospect and wide-spaced scout
drilling of select regional targets.
Big Red Prospect
Key drill intercepts returned from the limited Big Red holes in the first batch of assays included:
• 22m @ 1.24% Li2O from 23m (KHDD006).
The result in hole KHDD006 is particularly significant in confirming the relative consistency of the Big Red system in
that area with respect to thickness and grade.
Figure 3: KHLP plan view – Big Red and Rocky pegmatite system – all drill holes graded by maximum down hole assay
Three holes targeting east-west extensions of Big Red were amongst the second batch of assays. These results
successfully further expanded Big Red and delivered additional confidence in the modelling of the pegmatite.
Rocky Prospect
The initial interpretation of Rocky was of a stacked system, with further results suggesting the geometry of the Rocky
pegmatite was north-east striking/plunging and north-west dipping. With assay results from KHRC043 and
KHRC044D, the plunge was confirmed to be below the Big Red pegmatite.
FUTURE BATTERY MINERALS LIMITED: INTERIM FINANCIAL REPORT − 31 DECEMBER 2023
6
DIRECTORS’ REPORT
Assay results received for Rocky during the period confirmed visual spodumene observations with numerous shallow
high-grade intercepts including:
• 8m @ 1.08% Li2O from 40m (KHRC057);
•
6m @ 1.03% Li2O from 60m (KHRC089);
•
4m @ 1.34% Li2O from 9m (Big Red) and 4m @ 1.01% Li2O from 146m (Rocky) (KHDD009);
•
2m @ 1.27% Li2O from 23m and 4m @ 1.02% Li2O from 211m (KHRC095);
•
2m @ 1.09% Li2O from 35m (KHRC099); and
•
5m @ 1.28% Li2O from 24m (KHRC114).
Subsequent to the end of the period, FBM received the remaining 15 RC and DD drill hole results from the Phase 3
KHLP programme. The returned holes were predominantly focussed on grid drilling of the Rocky Prospect and widespaced scout drilling to the east of Big Red and regional targets Eastern Grey and Wallaroo.
These results further increased the scale of the Rocky mineralised system, demonstrating a highly continuous
mineralised system commencing at shallow depths, albeit thinner and of lower average grade than the standout
neighbouring Big Red pegmatite. The proximity of Rocky to both surface and Big Red means that it is expected to
form a significant part of any future development at Kangaroo Hills.
Figure 4: KHLP long section – Big Red and Rocky pegmatite system
Optimised resistivity survey results deliver new and refined northern targets
In December 2023, the Company received results from detailed resistivity surveying undertaken between August and
October 2023 across the northern part of the KHLP. The new resistivity survey was designed to build on previously
reprocessed resistivity results from an IP survey completed by FBM in this area during 2021 (when the Company was
exploring for nickel sulphides in the region).
The new resistivity results extended the prospective target area to the north of the currently defined Big Red
mineralised zone by up to 2.2km north-south, with the addition of two connected prospective resistive anomalies
along strike identified as Big Red North. They also enlarged and refined the Western Grey and Quokka targets, as well
as identifying a further two targets to the west of Big Red, Big Red West and Whip Tail.
FUTURE BATTERY MINERALS LIMITED: INTERIM FINANCIAL REPORT − 31 DECEMBER 2023
7
DIRECTORS’ REPORT
Figure 5: KHLP plan view – Resistivity survey area and prospective anomalies
The new resistivity survey results also highlighted lower order anomalies coincident with Rocky (a mineralised
pegmatite, but with thinner average pegmatites than Big Red) and Wallaroo (where drilling has intercepted
pegmatites, but with no significant mineralised intercepts to date). This provides further confidence in the
geophysical targeting method, as it supports previously drilled targets that intercepted pegmatite.
Selective petrophysical testing was also undertaken on diamond core samples from the KHLP, to determine the
geophysical properties of the pegmatite versus the ultramafic and mafic (greenstone) rocks intruded. The results of
this testing showed a clear difference in resistivity, density and velocity between the pegmatite and the greenstones.
In general, the pegmatite samples have higher resistivity, and lower density and seismic velocity than the greenstone
samples. This demonstrates that where significant volumes of pegmatite exist within the greenstone host with similar
properties, that gravity, seismic and resistivity methods may all be successful as exploration targeting tools.
FUTURE BATTERY MINERALS LIMITED: INTERIM FINANCIAL REPORT − 31 DECEMBER 2023
8
DIRECTORS’ REPORT
Phase 4 drilling
Subsequent to the end of the period, permitting approval was received for drilling in the northern part of the KHLP
(refer FBM ASX release dated 28 February 2024). As at the time of writing, RC drilling of key northern targets at the
KHLP (Phase 4 KHLP programme) is expected to commence in early March.
The Phase 4 programme is set to initially focus on drill testing the interpreted northern continuity of the shallow,
thick, gently dipping, and high-grade lithium mineralisation intersected at Big Red (Big Red Extension target), which
includes:
• 29m @ 1.36% Li2O from 38m (KHRC011);
•
27m @ 1.32% Li2O from 64m (KHRC017);
•
23m @ 1.03% Li2O from 53m (KHRC031);
•
23m @ 1.19% Li2O from 44m (KHDD001); and
•
22m @ 1.24% Li2O from 23m (KHDD006).
Other key northern targets to be tested as part of this Phase 4 program include the high-potential optimised resistivity
anomalies at Western Grey, Quokka, Big Red West, and Whip Tail.
Initial metallurgical results
Subsequent to the end of the period, initial metallurgical testwork results were received for the KHLP (refer FBM ASX
release dated 5 February 2024). X-Ray Diffraction (XRD) testing confirmed that spodumene is the predominant lithium
mineral (comprising ~90% of the Li2O) in the Big Red pegmatite.
Critically, the results demonstrated that Big Red is amenable to conventional Dense Media Separation (DMS) and
Froth Flotation separation techniques to deliver low process complexity and strong recovery into high-quality,
marketable spodumene concentrate:
• DMS: Heavy Liquid Separation (HLS) undertaken on -3.35mm +850um fraction produced spodumene
concentrate grading 5.56% Li2O with a stage recovery of 52.9%.
•
Froth Flotation: Whole-of-Ore (WOO) Fines Flotation produced a spodumene concentrate with a grade of
5.50% Li2O at an overall recovery of 76.9%.
These results indicate that processing of Big Red material via a hybrid flowsheet utilising both DMS and Froth
Flotation can produce a high-grade, marketable spodumene concentrate with low impurity levels at robust
recoveries. Being only preliminary testing, the results also demonstrate ample opportunity for further optimisation
with more refined process evaluation across subsequent metallurgical testwork phases.
Nevada Lithium Project (NLP), Nevada – 80% FBM
FBM acquired an 80% interest in the Nevada Lithium Project (NLP) located in Nevada, USA, in June 2022. The NLP
consists of five key prospects, Traction, San Antone, Heller, Lone Mountain and Western Flats, comprising over 90km2
of ground that is considered highly prospective for larger sedimentary-hosted lithium deposits.
The region is home to several large sedimentary-hosted lithium deposits, including Ioneer Resources’ (ASX: INR)
Rhyolite Ridge Project and American Lithium Corporation’s (TSX.V: LI) (US OTC: LIACF) (Frankfurt: 5LA1) TLC Lithium
Project. Albemarle Corporation’s (NYSE: ALB) Silver Peak Lithium Mine, currently the only producing lithium mine in
North America, lies approximately 45kms to the west of the NLP.
FUTURE BATTERY MINERALS LIMITED: INTERIM FINANCIAL REPORT − 31 DECEMBER 2023
9
DIRECTORS’ REPORT
Figure 6: Lone Mountain Prospect location map including neighbouring reported lithium resources
FUTURE BATTERY MINERALS LIMITED: INTERIM FINANCIAL REPORT − 31 DECEMBER 2023
10
DIRECTORS’ REPORT
Phase 2 drilling
Following the success of the maiden drilling campaign at the NLP, the Company completed a Phase 2 programme
consisting of 3,000m of RC drilling. The Phase 2 programme was aimed at extending the known lithium claystone
horizon intercepted during the Phase 1 programme in drill hole WF23-011 at the Western Flats Prospect, consisting
of 109.7m @ 766ppm Li from a down-hole depth of 135m, and which remained open in multiple directions.
The Phase 2 programme incorporated drilling to the south of Western Flats at the Lone Mountain Prospect. Initial
assay results received from this drilling highlighted a further discovery, and the emerging scale of the broader system
at the NLP, successfully intercepting thick, shallow lithium mineralisation including:
•
179.8m @ 766ppm Li from 39.6m (WF23-015), including 19.8m @ 1,010ppm Li from 80.8m;
•
170.7m @ 764ppm Li from 67.1m to end of hole (WF23-014), including 27.4m @ 1,030ppm Li from 112.8m;
and
•
44.2m @ 542ppm Li from 114.3m (WF23-013) and 22.9m @ 652ppm Li from 163.1m (WF23-013).
Phase 3 drilling
The Phase 3 programme commenced at NLP in October 2023 with the aim of delivering a maiden Mineral Resource
Estimate during Q1 2024.
DD Programme
Phase 3 DD at Lone Mountain comprised three (3) holes for 1,121 metres drilled. These holes were aimed to extend,
at depth, lithium mineralisation intercepted in the Phase 1 and 2 RC programs – including the objective of drilling
through the Li-bearing claystone into the bedrock sequence below the basin.
All three DD holes successfully twinned their existing RC hole and returned thick, high-grade intercepts – greatly
extending lithium claystone mineralisation in the sequence of host Siebert Formation (including to end-of-hole in
two of the three). Moreover, bedrock was not finally intercepted in any holes by target depth. This demonstrated that
the host Siebert Formation is much thicker than previously anticipated and highlights the potential for continuity of
mineralised thicknesses up-dip to the south.
Assay results from the Phase 3 DD also returned a positive grade differential compared to the previously announced
RC hole samples in two of the three twinned holes, owing to improved sample quality. Holes WF23- 011C and WF23015C showed a 14% and 7% observed uplift, respectively.
Significant intercepts from the Phase 3 DD assays include:
•
226m @ 855 ppm Li from 140m (WF23-011C), including 66m @ 1,001 ppm Li from 216m
•
148m @ 795 ppm Li from 152m (WF23-009C), including 60m @ 918 ppm Li from 191m
•
180m @ 818 ppm Li from 40m (WF23-015C), including 51m @ 915 ppm Li from 53m and 23m @ 1,081 ppm Li from
182m.
FUTURE BATTERY MINERALS LIMITED: INTERIM FINANCIAL REPORT − 31 DECEMBER 2023
11
Figure 6: NLP – Phase 3 DD hole locations
RC Programme
RC drilling commenced at the NLP in December 2023 and was designed to test the southern strike extent of the
shallow Lone Mountain deposit. The host formation of the lithium claystone mineralisation at Lone Mountain, the
Siebert Formation, is interpreted to become progressing shallower moving south from the known mineralisation at
Lone Mountain, over a further 2km, where it is then observed to outcrop in various places.
Subsequent to the end of the period, Phase 3 RC drilling was completed with a total of six (6) holes for 1,177m. All six
holes intercepted the host Siebert Formation, including LM23-002 intercepting it from surface.
At the time of writing, assay results from the Phase 3 RC drilling remain pending.
Completion of a maiden Mineral Resource Estimate for the NLP remains on track for Q1 2024.
FUTURE BATTERY MINERALS LIMITED: INTERIM FINANCIAL REPORT − 31 DECEMBER 2023
12
DIRECTORS’ REPORT
Corporate
Capital raising
During the period, FBM received firm commitments from institutional and sophisticated investors to raise A$7.6
million (before costs) under a placement of fully paid ordinary shares over two tranches at an issue price of A$0.10
per share (Placement). Hancock Prospecting Pty Ltd agreed to participate in the Placement as a cornerstone
investor, investing A$2.65 million across the two tranches.
Tranche 1 of the Placement was completed in September 2023 with funds received totalling A$5.2 million. Tranche
2, comprising the remaining A$2.4 million including Directors’ participation of A$225,000, was completed in
November 2023, following the receipt of shareholder approval at the Company’s 2023 Annual General Meeting (AGM).
Significant Change in State of Affairs
On 11 August 2023, FBM completed the acquisition of the remaining 20% interest in Kangaroo Hills Lithium Project
(KHLP). The acquisition is made by acquiring the remaining 20% interest in Eastern Coolgardie Goldfields Pty Ltd
(ECG) from Goldfellas Pty Ltd, a wholly owned subsidiary of Lodestar Minerals Limited (ASX: LSR). Prior to the
acquisition, FBM held 80% interest in ECG, the Joint Venture entity exploring the KHLP, and following the completion
of the acquisition, FBM now holds 100% interest in ECG.
The total consideration for the 20% acquisition is as follows:
•
$500,000 in cash comprising of $250,000 to be paid at Completion, $125,000 payable 3 months from
Completion, and $125,000 payable 6 months from Completion; and
•
27,505,429 fully paid ordinary shares in the Company (Consideration Shares); and
•
27,505,429 Performance Rights which will vest and convert into fully paid ordinary shares upon the Company
delineating and announcing a Mineral Resource (JORC Code compliant) of at least 10mt at 1.0% Li2O at the
Kangaroo Hills Lithium Project (Consideration Performance Rights).
On 11 October 2023, Mr. Paul Brown has resigned as a Non-Executive Director of FBM.
On 18 October 2023, Mr. Nick Rathjen commenced as Managing Director and CEO, and Mr. Mike Edwards has stepped
down from his executive duties and assumes the role of Non-Executive Chairman.
On 20 November 2023, Mr Neville Power has been appointed as a Non-Executive Director of FBM, and on 22 November
2023, Mr. Trevor Eton has resigned as a Non-Executive Director of FBM.
On 31 December 2023. Mr Matthew Worner has stepped down as Joint Company Secretary of FBM.
There were no other significant changes in the state of affairs of the Group during the period.
Matters Subsequent to Reporting Date
No matters or circumstances have arisen since the end of the financial period which significantly affected or may
significantly affect the operations of the Group, the results of those operations, or the state of affairs of the Group in
future periods.
FUTURE BATTERY MINERALS LIMITED: INTERIM FINANCIAL REPORT − 31 DECEMBER 2023
13
DIRECTORS’ REPORT
Auditor’s Independence Declaration
The Auditor’s Independence Declaration under section 307C of the Corporation Act 2001 is included within this
financial report.
This report is signed in accordance with a resolution of the Board of Directors.
Nicholas Rathjen
CEO & Managing Director
Perth, Western Australia, 13 March 2024
FUTURE BATTERY MINERALS LIMITED: INTERIM FINANCIAL REPORT − 31 DECEMBER 2023
14
Tel: +61 8 6382 4600
Fax: +61 8 6382 4601
www.bdo.com.au
Level 9, Mia Yellagonga Tower 2
5 Spring Street
Perth, WA 6000
PO Box 700 West Perth WA 6872
Australia
DECLARATION OF INDEPENDENCE BY JARRAD PRUE TO THE DIRECTORS OF FUTURE BATTERY
MINERALS LIMITED
As lead auditor for the review of Future Battery Minerals Limited for the half-year ended 31 December
2023, I declare that, to the best of my knowledge and belief, there have been:
1.
No contraventions of the auditor independence requirements of the Corporations Act 2001 in
relation to the review; and
2.
No contraventions of any applicable code of professional conduct in relation to the review.
This declaration is in respect of Future Battery Minerals Limited and the entities it controlled during
the period.
Jarrad Prue
Director
BDO Audit (WA) Pty Ltd
Perth
13 March 2024
BDO Audit (WA) Pty Ltd ABN 79 112 284 787 is a member of a national association of independent entities which are all members of BDO Australia
Ltd ABN 77 050 110 275, an Australian company limited by guarantee. BDO Audit (WA) Pty Ltd and BDO Australia Ltd are members of BDO
International Ltd, a UK company limited by guarantee, and form part of the international BDO network of independent member firms. Liability
limited by a scheme approved under Professional Standards Legislation.
CONSOLIDATED STATEMENT OF PROFIT OR LOSS AND OTHER
COMPREHENSIVE INCOME
FOR THE HALF YEAR ENDED 31 DECEMBER 2023
31 December
2023
$
31 December
2022
$
446,716
8,030
975
50,000
Accounting fees
(12,196)
(31,571)
Audit fees
(6,464)
(4,015)
Advertising and marketing
(55,550)
(44,020)
Consulting fees
(106,231)
(60,090)
Director fees
(151,198)
(98,000)
Employee benefit expense
(98,957)
(60,242)
Corporate and regulatory fees
(96,452)
(109,081)
(2,596,878)
(953,946)
Legal costs
(148,021)
(209,223)
Rent
(13,223)
(11,900)
(442,458)
(44,932)
Travel and accommodation
(14,810)
(4,479)
Finance costs
(5,820)
(4,937)
Other expenses
(193,856)
(183,670)
(3,494,423)
(1,762,076)
-
-
(3,494,423)
(1,762,076)
(111,421)
(7,329)
Other comprehensive loss for the period, net of tax
(3,605,844)
(1,769,405)
Total comprehensive profit/(loss) for the period
(3,605,844)
(1,769,405)
(3,565,213)
(1,757,919)
(40,631)
(11,486)
(3,605,844)
(1,769,405)
(0.72)
(0.47)
Note
Revenue from continuing operations
Other income
3
Other revenue
Less Expenses:
Impairment expense
Share based payment expenses
3
7
(Loss) before income tax expense
Income tax expense
(Loss) after income tax for the period
Other Comprehensive Income
Items that may be reclassified to profit or loss
Other comprehensive loss for the period
Total comprehensive profit/(loss) is attributable to:
Owners of Future Battery Minerals Limited
Non-Controlling interest
Profit/(Loss) per share from continuing operations
attributable to the ordinary equity holders of Future Battery
Minerals Limited:
Basic and diluted profit/(loss) per share (cents)
12
The above consolidated statement of profit or loss and other comprehensive income should be read in conjunction with
the accompanying notes.
FUTURE BATTERY MINERALS LIMITED: INTERIM FINANCIAL REPORT − 31 DECEMBER 2023
16
CONSOLIDATED STATEMENT OF FINANCIAL POSITION
AS AT 31 DECEMBER 2023
Note
ASSETS
Current assets
Cash and cash equivalents
Trade and other receivables
Other receivables
Total current assets
Non-current assets
Property, plant, and equipment
Right of use assets
Mineral exploration and evaluation expenditure
Bond receivables
Other receivables
Total non-current assets
TOTAL ASSETS
3
3
3
LIABILITIES
Current liabilities
Trade payables and other payables
Lease liability
Total current liabilities
4
Non-current liabilities
Lease liability
Other payable
Total non-current liabilities
TOTAL LIABILITIES
4
NET ASSETS
EQUITY
Contributed equity
Reserves
Non-controlling interest
Accumulated losses
TOTAL EQUITY
5
6
31 December
2023
$
30 June
2023
$
2,949,540
282,662
5,200,000
8,432,202
3,039,181
154,438
3,193,619
152,432
12,857
19,777,445
119,347
1,923,077
21,985,158
30,417,360
176,691
37,539
16,581,317
119,347
6,685,537
23,600,431
26,794,050
1,383,557
52,197
1,435,754
1,197,334
59,150
1,256,484
27,769
27,769
1,463,523
56,580
1,337,107
1,393,687
2,650,171
28,953,837
24,143,879
49,826,481
764,096
200,298
(21,837,038)
28,953,837
39,644,297
2,359,065
483,132
(18,342,615)
24,143,879
The above consolidated statement of financial position should be read in conjunction with the accompanying notes.
FUTURE BATTERY MINERALS LIMITED: INTERIM FINANCIAL REPORT − 31 DECEMBER 2023
17
CONSOLIDATED STATEMENT OF CHANGES IN EQUITY
FOR THE HALF YEAR ENDED 31 DECEMBER 2023
Issued
Capital
$
Balance at 1 July 2023
39,644,297
Total comprehensive income for
the period
Loss for the period
Other comprehensive loss
Balance at 31 December 2023
Balance at 1 July 2022
Total comprehensive income
for the period
Loss for the period
Other comprehensive loss
Total comprehensive
income/(loss) for the period
Transactions with owners,
recorded directly in equity
Issue of shares (note 5)
Share capital raising costs
(note 5)
Issue of options (note 6)
Conversion of performance
rights (note 6)
Share based payments (note 7)
Balance at 31 December 2022
(18,342,615)
FX Reserve
$
2,318,365
40,700
NonControlling
Interest
$
483,132
Total
$
24,143,879
-
(3,494,423)
-
-
(111,421)
-
(3,494,423)
(111,421)
-
(3,494,423)
-
(111,421)
-
(3,605,844)
7,088,239
-
-
-
-
7,088,239
-
-
48,000
-
-
48,000
205,875
-
(205,875)
-
-
-
2,888,070
-
(1,768,131)
-
(282,834)
837,105
Total comprehensive
income/(loss) for the period
Transactions with owners,
recorded directly in equity
Issue of shares, net of costs (note
5)
Issue of Options (note 6)
Conversion of performance rights
(note 6)
Acquisition of 20% interest in
Eastern Coolgardie Goldfields Pty
Ltd (ECG)
Share based payments (note 7)
Accumulated
Losses
$
Option,
Performance
Rights, & Other
Reserve
$
-
-
442,458
-
-
442,458
49,826,481
(21,837,038)
834,823
(70,727)
200,298
28,953,837
Contributed
Equity
$
Accumulated
Losses
$
Option and
Performance Rights
Reserve
$
FX
Reserve
$
NonControlling
Interest
$
Total
$
36,920,122
(15,936,261)
2,358,251
-
2,299,296
25,641,408
-
(1,762,076)
-
-
(7,329)
-
(1,762,076)
(7,329)
-
(1,762,076)
-
(7,329)
-
(1,769,405)
2,650,000
-
-
-
-
2,650,000
(183,000)
-
-
-
-
(183,000)
-
-
24,000
-
-
24,000
257,175
-
(257,175)
-
-
-
-
-
44,932
-
-
44,932
39,644,297
(17,698,337)
2,170,008
(7,329)
2,299,296
26,407,935
The above consolidated statement of changes in equity should be read in conjunction with the accompanying notes.
FUTURE BATTERY MINERALS LIMITED: INTERIM FINANCIAL REPORT − 31 DECEMBER 2023
18
CONSOLIDATED STATEMENT OF CASH FLOWS
FOR THE HALF YEAR ENDED 31 DECEMBER 2023
31 December
2023
$
31 December
2022
$
Cash flows from operating activities
Payments to suppliers and employees
Interest received
Other revenue
Net cash outflow from operating activities
(989,424)
9,176
975
(979,273)
(743,399)
8,030
50,000
(685,369)
Cash flows from investing activities
Payment for property, plant, and equipment
Exploration and evaluation expenditure
Payment for acquisition of 20% interest in ECG
Net cash outflow from investing activities
(5,490)
(5,651,438)
(500,000)
(6,156,928)
(1,585)
(2,004,550)
(2,006,135)
Cash flows from financing activities
Proceeds from share issue
Share issue costs
Lease payment
Net cash inflow from financing activities
7,587,348
(491,803)
(48,985)
7,046,560
2,650,000
(159,000)
(60,837)
2,430,163
Net decrease in cash and cash equivalents
Cash and cash equivalents at beginning of the financial period
(89,641)
3,039,181
(261,341)
4,458,921
Cash and cash equivalents at end of the period
2,949,540
4,197,580
3
The above consolidated statement of cash flows should be read in conjunction with the accompanying notes.
FUTURE BATTERY MINERALS LIMITED: INTERIM FINANCIAL REPORT − 31 DECEMBER 2023
19
NOTES TO THE CONSOLIDATED FINANCIAL STATEMENTS
FOR THE HALF YEAR ENDED 31 DECEMBER 2023
1. Summary of significant accounting policies
Basis of preparation
These general purpose interim financial statements for the half year reporting period ended 31 December 2023 has
been prepared in accordance with Australian Accounting Standard AASB 134 Interim Financial Reporting and the
Corporations Act 2001. Compliance with AASB 134 ensures compliance with International Financial Reporting
Standard IAS 34 Interim Financial Reporting. The consolidated entity is a for-profit entity for financial reporting
purposes under Australian Accounting Standards.
This interim financial report does not include full disclosures of the type normally included in an annual report. It is
recommended that this financial report to be read in conjunction with the annual financial report for the year ended
30 June 2023 and any public announcements made by Future Battery Minerals Limited during the half year reporting
period in accordance with the continuous disclosure requirements of the Corporations Act 2001.
Historical cost convention
The financial statements have been prepared under the historical cost convention, except for, where applicable, the
revaluation of available-for-sales financial assets, financial assets and liabilities at fair value through profit or loss,
investment properties, certain classes of property, plant and equipment and derivative financial instruments.
Critical accounting estimates
In preparing this interim report, the significant judgements made by management in applying the Group’s accounting
policies and key sources of estimation uncertainty were the same as those that applied to the consolidated financial
report for the year ended 30 June 2023.
Going Concern
These financial statements have been prepared on the going concern basis, which contemplates the continuity of
normal business
Share your feedback
Discover