QUARTERLY ACTIVITIES REPORT
For the period ending 30 June 2023
Future Battery Minerals Limited (ASX: FBM) (FBM or the Company), is pleased to provide the following report
on its activities during the June 2023 quarter. The Company’s primary focus during the reporting period was
the completion of the Saints Nickel Project Scoping Study (Saints) (100%), progressing exploration activities
at both the Kangaroo Hills Lithium Project (KHLP) (80%) in WA, and the Nevada Lithium Project (NLP) (80%)
in Nevada, USA.
HIGHLIGHTS
Kangaroo Hills Lithium Project (KHLP), WA (80%)
•
Phase 2 drill programme completed, comprising 2,500m of reverse circulation (RC) and 500m of
diamond drilling (DD), with significant RC results including:1 2
o
o
o
o
o
o
27m @ 1.32% Li2O from 64m (KHRC017), including:
4m @ 2.5% Li2O from 80m
23m @ 1.03% Li2O from 53m (KHRC031);
19m @ 1.03% Li2O from 42m (KHRC015);
16m @ 1.09% Li2O from 11m (KHRC022);
13m @ 1.23% Li2O from 41m (KHRC030); and
12m @ 1.02% Li2O from 8m (KHRC021).
•
Phase 2 DD component intersected multiple near surface spodumene bearing pegmatite in thick
widths up to 23.8m (pegmatite width 26.5m KHDD001), with thick, high-grade lithium (Li)
intercepted in three (3) of five (5) holes drilled. The significant assay results were released subsequent
to the end of the June 2023 quarter on 18 July 2023.34
•
Target generative work identified seven (7) new high priority LCT pegmatite targets over a total strike
length of more than 3km.5
•
Phase 3 RC drilling programme commenced subsequent to the end of the June 2023 quarter, with a
primary focus on infilling at the Big Red Prospect and testing of regional targets.6
Nevada Lithium Project (NLP), USA (80%)
•
Assay results received from the maiden Phase 1 RC drilling programme, with thick high-grade
lithium claystone intercepted at the Western Flats and San Antone East prospects, with significant
results including:7
o
o
o
1
2
109.7m @ 766ppm Li from 135.6m depth (WF23-011), including:
29m @ 1,010ppm Li from a depth of 210.3m
44.2m @ 570ppm Li from 169.2m (WF23-006)
35.1m @ 463ppm Li from 106.7m (WF23-001)
ASX Announcement – 3 May 2023 -Multiple Thick High Grade Assay Results Extend Lithium Discovery
ASX Announcement – 22 June 2023 – More High-Grade Lithium Assays, New Pegmatite Uncovered
3
ASX Announcement – 18 July 2023 – Further High-Grade Lithium Results at Kangaroo Hills
ASX Announcement – 17 May 2023 – Further Thick Spodumene Intersections at Kangaroo Hills
5
ASX Announcement – 8 June 2023 – 7 New Large Scale LCT Pegmatite Lithium Targets Identified
6
ASX Announcement – 4 July 2023 – Drilling underway at Kangaroo Hills Lithium Project
7
ASX Announcement – 13 April 2023 – High Grade Lithium Claystone Discovered in Nevada
4
Future Battery Minerals Ltd
info@futurebatteryminerals.com.au
Suite 10, 38 Colin St, West Perth WA 6005
+61 8 6383 7817
ABN 91 148 966 545
futurebatteryminerals.com.au
ASX: FBM
Follow Us
1
•
Phase 2 RC drill programme of 3,000m completed at the Western Flats and Lone Mountain prospects,
targeting extensions to lithium claystone intercepted from the Phase 1 RC drilling at the Western Flats
Prospect.8
•
As announced after the end of the June 2023 quarter, the Phase 2 RC drill programme successfully
intercepted the host formation to the lithium claystone, indicating extensions to Li mineralisation
at the two prospects. The Company eagerly awaits the return of assays from this drilling programme.9
Saints Nickel Project (Saints), WA (100%)
•
Scoping Study confirmed the potential viability of the Saints Nickel Project, with simple
infrastructure and mine development requirements supporting a small toll treatment operation
within close proximity of several third-party operating concentrators.10
•
Twin box cut and decline developments centred on the St Patricks and St Andrews deposits, respectively.
Nepean Nickel Project (Nepean), WA (80%)
•
FBM successfully completed the sale of the 80% owned Nepean Nickel Project to Rocktivity
Nepean Pty Ltd, for a total cash consideration of $10 million (FBM: $8 million).11
•
The terms of the sale included an initial cash deposit of $100,000, followed by a payment of $2.7 million
in cash upon completion. The Company’s 80% share of these two payments ($2.24 million) were received
by the Company before the end of the quarter. The remaining sale consideration of $7.2 million (FBM:
$5.76 million) is to be paid in stages over the next 24 months (June 2024 through June 2025).
Corporate
•
On 26 June 2023, the Company announced the appointment of experienced mining engineer, Mr Paul
Brown, as a Non-Executive Director of the Company.12
•
FBM had a cash balance of approximately $3.04 million as at 30 June 2023.
September 2023 Quarter Planned Activities
The upcoming work programmes and expected results for FBM include:
Kangaroo Hills Lithium Project (KHLP) (80%):
•
Early-stage metallurgical and mineralogical testwork ongoing;
•
On-going target generative geophysics;
•
Completion of the Phase 3 RC and DD drill programme, which is further testing Big Red and the exciting
regional prospects at Rocky, Eastern Grey, Wallaroo and Pademelon;
•
Assay results from the Phase 3 drill programme;
•
Results and assessment of early-stage metallurgical mineralogical testwork; and
•
Approval of a new Programme of Works (POW) for drilling of high priority drill targets to the north of Big
Red, Western Grey and Quokka prospects.
Nevada Lithium Project (NLP) (80%):
•
Assay results from the Phase 2 drill programme; and
•
Planning and permitting for Phase 3 drill programme.
8
ASX Announcement – 6 June 2023 – Phase 2 Drilling Underway at Nevada Lithium Project
9
ASX Announcement – 13 July 2023 – Potential Extensions to Li Claystone Identified in Nevada
ASX Announcement – 11 April 2023 – Saints Nickel Project Delivers Positive Scoping Study
11
ASX Announcement – 9 May 2023 – Sale of Nepean Nickel Projects for $10m in Cash
12
ASX Announcement – 26 June 2023 – Appointment of Non-Executive Director
10
Future Battery Minerals Ltd
info@futurebatteryminerals.com.au
Suite 10, 38 Colin St, West Perth WA 6005
+61 8 6383 7817
ABN 91 148 966 545
futurebatteryminerals.com.au
ASX: FBM
Follow Us
2
Company Lithium Projects – Western Australia
Kangaroo Hills Lithium Project (KHLP) (80%)
During the quarter, FBM continued to rapidly advance its exploration activities across the KHLP. The final
assay results were received from the Phase 1 drill programme and the Phase 2 drill programme was completed
during the June 2023 quarter, with initial assay results received. Following the reporting period, FBM initiated
a Phase 3 RC and DD programmes.
Phase 1 Drilling
During the reporting period, FBM received the remaining assay results for the Phase 1 drill programme,
confirming that the area is highly prospective for LCT Pegmatites.13
Phase 2 Drilling
During the quarter, the Company completed the Phase 2 drill programme, which included 2,500m of RC drilling
and 500m of diamond drilling (DD). The primary objective of the programme was to test potential extensions
along the strike of significant intercept at KHRC11, which returned 29m @ 1.36% Li2O from 38m.14
The RC drilling component involved a stepped out on 40-80m hole spacing from KHRC011. The drill holes, on
average, reached a depth of 120m at an angled direction, which is shallower than the Phase 1 drill programme.
The drilling confirmed that the high-grade pegmatite is relatively flat lying and can be adequately tested using
shallow drilling.
Figure 1: KHLP - North - South Cross Section, Easting 317900
The initial assay results from the Phase 2 RC drill programme further supports the significance of the initial
March 2023 discovery. A series of vertical holes testing the fresh mineralised pegmatite confirmed the shallow
thick high-grade mineralisation which remains open to north and north-west (Figure 1).
13
14
ASX Announcement – 20 April 2023 – Exploration Update Kangaroo Hills Lithium Project
ASX Announcement – 20 March 2023 – LCT-Pegmatite Discovery confirmed at Kangaroo Hills
Future Battery Minerals Ltd
info@futurebatteryminerals.com.au
Suite 10, 38 Colin St, West Perth WA 6005
+61 8 6383 7817
ABN 91 148 966 545
futurebatteryminerals.com.au
ASX: FBM
Follow Us
3
Significant results included:
•
27m @ 1.32% Li2O from 64m (KHRC017), including:
4m @ 2.5% Li2O from 80m
•
23m @ 1.03% Li2O from 53m (KHRC031);
•
19m @ 1.03% Li2O from 42m (KHRC015);
•
16m @ 1.09% Li2O from 11m (KHRC022);
•
13m @ 1.23% Li2O from 41m (KHRC030); and
•
12m @ 1.02% Li2O from 8m (KHRC021).
After the completion of the Phase 2 RC drill programme, the DD programme was undertaken to infill the RC
drill holes and to provide core sample of the Li pegmatite15. Drilling consisted of five (5) shallow holes for 313
metres, infilling the high-grade intercepts from the RC drilling component. These five shallow holes all
intercepted the target pegmatite. The diamond core samples have been utilised for early-stage metallurgical
and mineralogical test work and assessment to provide much needed structural information.
The fresh rock intercepts of the pegmatite host visible, fine to coarse grained, spodumene are shown in Image
1 as logged by the FBM geological team. The crystal size, nature and amenability to recovery is being studied
and assessed in the ongoing mineralogical and metallurgical test work. The structural measurements of the
core have also confirmed the relative flat lying nature of the mineralised pegmatite and gentle northerly dip.
Image 1: KHLP - KHDD001 showing visible spodumene in drill core (57- 60.5m down hole depth)
15 ASX Announcement – 17 May 2023 – Further Thick Spodumene Intersections at Kangaroo Hills
Future Battery Minerals Ltd
info@futurebatteryminerals.com.au
Suite 10, 38 Colin St, West Perth WA 6005
+61 8 6383 7817
ABN 91 148 966 545
futurebatteryminerals.com.au
ASX: FBM
Follow Us
4
The assays results from the DD component of the Phase 2 drill programme were received subsequent to the
end of the quarter. The thick, high-grade assay results received for three of the five holes were announced on
18 July 2023. The core sample from these holes are also to be used in the early-stage metallurgical test work,
with results expected in the September 2023 quarter. Additionally, all samples returned from the Phase 2 drill
programme which intercepted >1% Li2O have been submitted for quantitative X-Ray Diffraction mineralogy.
Geophysical and Field Work
Following the completion of the Phase 2 drill programme, the Company further identified seven large scale
targets, with a combined total strike length of over 3km. These new targets have been identified from the
Company’s on-going target generative field and geophysical work. These targets consist of the Big Red
Prospect (Big Red), which hosts the identified thick high-grade spodumene bearing pegmatites, Western Grey,
Eastern Grey, Rocky, Quokka, Wallaroo and Pademelon prospects (Figure 2) which have all been identified
as high priority drill targets with the potential to host further lithium-caesium-tantalum (LCT) pegmatites as
either flat lying sheets similar to the Big Red Prospect pegmatite or swarms.
Following a geophysical review, a resistivity anomaly was identified within the Big Red Prospect, which further
indicates a potential strike up to 1km in a north-northwest direction, extending from the current drilling area
(Figure 3). The resistivity has been derived from the IP Survey completed in early 2022. The Survey was
originally planned and designed to detect chargeable anomalies, potentially representing the presence of
nickel sulphides. The resistivity is also measured with the IP. The resistivity is thought to detect a change in
the country rock lithologies and potentially differentiate the pegmatite unit from the surrounding Mafic-Ultra
Mafic greenstone units.
As the Survey originally focussed on chargeability anomalism, regional resistivity anomalies had not been
ranked as pegmatite targets until further correlation was identified. This has now been achieved with the Phase
2 reverse circulation (RC) and diamond drilling (DD) producing a remarkable correlation. Further drilling will
now be undertaken in the Phase 3 drill programme to test the resistivity anomaly and to better understand the
relationship/signature of the pegmatite.
Additionally, a single drill hole (KHRC037) at the Rocky Prospect intercepted a spodumene bearing pegmatite
returning 5m @ 1.12% Li2O from 104m. Drill hole KHRC028, drilled directly east of KHRC037 intercepted a
weathered pegmatite from surface with anomalous Li, Ta and Tin (Sn) recorded. These occurrences validate
this exciting prospect located only 500m from the Big Red discovery and remains open to the south and east
and is maybe connected. High priority infill and extension drilling will now be undertaken to further understand
the nature of the pegmatites in this area and their association with the Big Red Prospect.
Future Battery Minerals Ltd
info@futurebatteryminerals.com.au
Suite 10, 38 Colin St, West Perth WA 6005
+61 8 6383 7817
ABN 91 148 966 545
futurebatteryminerals.com.au
ASX: FBM
Follow Us
5
Figure 2: KHLP – Location of Regional LCT Pegmatite Targets
Future Battery Minerals Ltd
info@futurebatteryminerals.com.au
Suite 10, 38 Colin St, West Perth WA 6005
+61 8 6383 7817
ABN 91 148 966 545
futurebatteryminerals.com.au
ASX: FBM
Follow Us
6
Figure 3 - KHLP – Big Red Prospect Phase 2 Drill Holes Plan View
Future Battery Minerals Ltd
info@futurebatteryminerals.com.au
Suite 10, 38 Colin St, West Perth WA 6005
+61 8 6383 7817
ABN 91 148 966 545
futurebatteryminerals.com.au
ASX: FBM
Follow Us
7
Metallurgical Test Work
Following the initial discovery in March 2023 of a spodumene bearing pegmatite, FBM commenced early-stage
metallurgical test work during the quarter, to better understand the characteristics and processing requirements
of the mineralised pegmatite, as well its recovery potential.16
Minsol Engineering Pty Ltd (Minsol) was appointed as the lead metallurgical and engineering consultant at the
Kangaroo Hills Lithium Project (KHLP) in Western Australia.
The early-stage test work is being conducted on KHLP diamond core sample, which intercepted, in March
2023, the spodumene dominant pegmatite identified in drill hole KHDD001. The full test work schedule will be
finalised after mineralogical scanning is complete. The test work will consist initially of the following methods:
•
Non-destructive core scanning;
•
Sample characterisation and mineralogical assessments;
•
Stage crush and screening for coarse and fine mineral processing;
•
Heavy liquid separation (HLS) of the coarse (+850um) fractions to determine amenability to froth
Dense Media Separation (DMS);
•
Preliminary grain size and liberation assessments; and
•
Sighter flotation tests to determine amenability to froth flotation.
Metallurgy and mineralogy will form an important part of the Company’s ongoing technical studies into the
lithium mineralisation at the KHLP.
Phase 3 Drilling
Subsequent to the end of the quarter, the Company commenced the Phase 3 drill RC and DD programme,
which consists of 5,000m of RC infilling at the Big Red Prospect (Big Red) and testing the regional targets
Rocky, Eastern Grey, Wallaroo and Pademelon. As the Programme of Work (POW) and permits are received,
the drill programme will expand on the remaining target areas, which include the areas of Big Red North,
Western Grey and Quokka. Diamond drilling (DD) is to be undertaken within the Big Red discovery zone to
investigate structural constraints of the pegmatite and to provide high quality samples for detailed geological
analysis.
Company Projects – Nevada, USA
Nevada Lithium Project (KHLP) (80%)
Phase 1 Drilling
During the quarter, the Company received assay results from its maiden 2,900m Phase 1 RC drilling
programme, which returned thick high-grade lithium claystone intercepts at Western Flats and San Antone
East, with stand-out results including:
•
109.7m @ 766ppm Li from 135.6m depth (WF23-011), including:
29m @ 1,010ppm Li from a depth of 210.3m
•
44.2m @ 570ppm Li from 169.2m (WF23-006)
•
35.1m @ 463ppm Li from 106.7m (WF23-001)
WF23-011 was the last hole drilled in the programme located at the southern end of Western Flats and near
to the Lone Mountain claim group lease boundary. The hole produced a thick intercept mineralisation of over
100m and also exhibited a significant high-grade component (29m @ 1,010ppm Li from 210.3m). The intercept
remains open to the south and west, where there is sufficient potential for further Li mineralisation to be found.
16
ASX Announcement – 19 May 2023 – Metallurgical Test Work to Commence at Kangaroo Hills
Future Battery Minerals Ltd
info@futurebatteryminerals.com.au
Suite 10, 38 Colin St, West Perth WA 6005
+61 8 6383 7817
ABN 91 148 966 545
futurebatteryminerals.com.au
ASX: FBM
Follow Us
8
Figure 4: Western Flats, NLP – Drill Holes Location
Phase 2 Drilling
Following the success of the Phase 1 drill programme, the Company commenced preparation and planning
for a follow up Phase 2 drill programme, consisting of 3,000m of RC drilling. The drilling started on the 6 June
2023, with the aim to test strike continuation of mineralisation in drill hole WF23-011 at the Western Flats
Prospect. The significant intercept of 109.7m @ 766ppm Li from a 135m downhole depth, importantly hosted
a high-grade portion of 29m @ 1,010ppm Li.
Future Battery Minerals Ltd
info@futurebatteryminerals.com.au
Suite 10, 38 Colin St, West Perth WA 6005
+61 8 6383 7817
ABN 91 148 966 545
futurebatteryminerals.com.au
ASX: FBM
Follow Us
9
The significant intercept has the potential to extend and shallow to the south and west towards the Lone
Mountain Prospect and the newly staked claims contiguous to Western Flats. The programme will also drill the
regional Heller Prospect with 3-4 RC holes to test the stratigraphy for potential Li bearing units. On 13 July
2023, the Company announced that the Phase 2 drilling has successfully intercepted the host formation to the
lithium claystone, indicating extensions to Li mineralisation at the Western Flats and Lone Mountain prospects.
The Company eagerly awaits the return of assays from this drilling programme.
New Claims
The Company expanded its project area via the addition of 36 new claims located contiguous to Western Flats
and Lone Mountain. Located on the western margin of the two prospect areas, the additional ground increases
FBM’s footprint in this highly prospective area of the NLP, increasing the opportunity to find additional
mineralisation. The Phase 2 drill programme will also test this newly staked ground.
Figure 5: NLP Prospects and New Claims
Future Battery Minerals Ltd
info@futurebatteryminerals.com.au
Suite 10, 38 Colin St, West Perth WA 6005
+61 8 6383 7817
ABN 91 148 966 545
futurebatteryminerals.com.au
ASX: FBM
Follow Us
10
Company Nickel Projects – Western Australia
Saints Nickel Project (Saints), (100%)
Scoping Study
During the quarter, the Company successfully completed a positive Scoping Study for the Saints Nickel Project.
The Scoping Study demonstrated potentially strong financial metrics for the Saints Nickel Project based on a
relatively low pre-production capital cost of $8.6 million. Based on the key Base Case scenario assumptions,
the project payback is modelled to occur within only 12 months of development from a 5-year Life of Mine
(LOM)
The Scoping Study describes a decline accessing the Resource that is subsequently mined underground via
conventional short lift open stoping. The mined rock is then trucked to surface, and then trucked on public
roads to a third-party concentrator. The Company considers the Saints Nickel Project to be technically low risk
given the simple mine plan drawing from the majority Indicated Resource and the high processing metal
recoveries.
The Scoping Study also outlines the initial baseline environmental works that have been carried out to date to
progress the Saints Nickel Project along its approval pathway. The Scoping Study was completed to an overall
+/-30% accuracy using the key parameters and forecast assumptions set out in Table 1.
Table 1: Key Base Case Saints Scoping Study Financial Metrics
Metric Description
Nickel Price (LOM avg)
Copper Price (LOM avg)
Cobalt Price (LOM avg)
FX US:AUD (LOM avg)
Met Recovery Ni
Met Recovery Cu
Met Recovery Co
Payability Ni
Payability Cu
Payability Co
Royalty (Vendor & State)
Pre-tax NPV (@ 8%)
Internal Rate of Return (IRR)
CAPEX (including sustaining)
OPEX
Unit
US$
US$
US$
US$
%
%
%
%
%
%
%
A$
%
A$
A$/lb Ni eqv
Future Battery Minerals Ltd
info@futurebatteryminerals.com.au
Suite 10, 38 Colin St, West Perth WA 6005
+61 8 6383 7817
ABN 91 148 966 545
futurebatteryminerals.com.au
24,160
8,300
37,460
0.682
85
95
85
75
50
25
6
$55.7M
362
10.68M
8.30
ASX: FBM
Follow Us
11
Nepean Nickel Project (Nepean), (80%)
During the reporting period, the Company successfully completed the sale of the 80% owned Nepean Nickel
Project to Rocktivity Nepean Pty Ltd for a total cash consideration of $10 million (FBM: $8 million). The Nepean
Nickel Project consist of tenements M15/709, M15/1809 and P15/5750 (Sale Tenements), and, importantly,
the Sale Tenements do not include the Kangaroo Hills Lithium Project (KHLP).
The transaction strengthens the Company’s cash reserves and will support funding of exploration at its two
key lithium projects at the Kangaroo Hills Lithium Project (80%) in WA and the Nevada Lithium Project (80%)
in Nevada, USA.
A cash consideration of $2.7 million (FBM: $2.16 million) was received upon completion in June, in addition to
the $100,000 deposit received on signing, with the remaining deferred consideration of $7.2 million (FBM:
$5.76 million) payable as follows:
•
$2.7 million payable 12 months from Completion of the Transaction (June 2024);
•
$2.5 million payable 18 months from Completion of the Transaction (December 2024); and
•
$2 million payable 24 months from Completion of the Transaction (June 2025).
Corporate
Cashflows for the Quarter
Attached to this report is the Appendix 5B containing Company’s cashflow statement for the June 2023 quarter.
The cash outflows for the quarter included $2.85 million incurred on exploration and evaluation expenditure,
which was primarily associated with the costs relating to the geological and mining studies, and drilling
programmes at the KHLP, NLP, and Saints. There were $450,000 of administration and corporate costs paid
during the quarter, and as disclosed on section 6 of Appendix 5B, $191,000 payments were made to related
parties, including the Directors and their associates pursuant to existing director fee agreements for Executive
and Non-Executive Directors.
As at 30 June 2023, the Company had available cash of approximately $3.04 million.
Board Changes
During the reporting period, the Company appointed mining engineer, Mr Paul Brown, as a Non-Executive
Director of the Company, effective from 1 July 2023. Mr Brown brings extensive experience and expertise in
the mining industry, with a strong track record in various senior executive roles across the lithium and iron ore
sectors.
Future Battery Minerals Ltd
info@futurebatteryminerals.com.au
Suite 10, 38 Colin St, West Perth WA 6005
+61 8 6383 7817
ABN 91 148 966 545
futurebatteryminerals.com.au
ASX: FBM
Follow Us
12
June 2023 Quarter - ASX Announcements
This Quarterly Activities Report contains information extracted from ASX market announcements reported in
accordance with the 2012 edition of the “Australasian Code for Reporting of Exploration Results, Mineral
Resources and Ore Reserves” (2012 JORC Code). Further details (including 2012 JORC Code reporting
tables where applicable) of exploration results referred to in this Quarterly Activities Report can be found in the
following announcements lodged on the Company’s ASX platform:
18 July 2023
Further High-Grade Lithium Results at Kangaroo Hills
13 July 2023
Potential Extensions to Li Claystone Identified in Nevada
4 July 2023
Drilling Underway at Kangaroo Hills Lithium Project
26 June 2023
Appointment of Non-Executive Director
22 June 2023
More High-Grade Lithium Assays, New Pegmatite Uncovered
15 June 2023
Completion of Nepean Nickel Project Sale
8 June 2023
7 New Large Scale LCT Pegmatite Lithium Targets Identif
6 June 2023
Phase 2 Drilling Underway At Nevada Lithium Project
23 May 2023
Phase 2 Drilling to Commence at Nevada Lithium Project
19 May 2023
Metallurgical Test Work To Commence At Kangaroo Hills
17 May 2023
Further Thick Spodumene Intersections At Kangaroo Hills
9 May 2023
Sale of Nepean Nickel Project for $10 million in Cash
3 May 2023
Multiple High Grade Assay Results Extend Lithium Discovery
20 April 2023
Exploration Update - Kangaroo Hills Lithium Project
13 April 2023
High Grade Lithium Claystone Discovered in Nevada
11 April 2023
5 April 2023
Saints Nickel Project Delivers Positive Scoping Study
Phase 2 Exploration Drilling Underway at Kangaroo Hills
These announcements are available for viewing on the Company’s website futurebatteryminerals.com.au/
under the Investors tab. Future Battery Minerals confirms that it is not aware of any new information or data
that materially affects the information included in any original ASX announcement.
This announcement has been authorised for release by the Board of Directors of Future Battery Minerals.
For further information please visit futurebatteryminerals.com.au/ or contact:
Robin Cox
Technical Director
E: rcox@futurebatteryminerals.com.au
T: +61 (08) 6383 7817
Mike Edwards
Executive Chairman
E: mike.edwards@futurebatteryminerals.com.au
T: +61 (08) 6383 7817
Future Battery Minerals Ltd
info@futurebatteryminerals.com.au
Suite 10, 38 Colin St, West Perth WA 6005
+61 8 6383 7817
ABN 91 148 966 545
futurebatteryminerals.com.au
ASX: FBM
Follow Us
13
Competent Persons Statement
The information in this report that relates to Exploration Results is based on and fairly represents information compiled by
Mr Robin Cox BSc (E.Geol), a Competent Person, who is a Member of the Australian Institute of Mining and Metallurgy.
Mr Cox is the Company’s Chief Geologist and has sufficient experience that is relevant to the style of mineralisation and
type of deposit under consideration and to the activity being undertaken to qualify as a Competent Person as defined in
the 2012 Edition of the Australasian Code for Reporting of Exploration Results, Mineral Resources and Ore Reserves. Mr
Cox consents to the inclusion in the announcement of the matters based on his information in the form and context in
which it appears.
The information in this release that relates to Mineral Resources is based on information compiled by Mr Shaun Searle
who is a Member of the Australasian Institute of Geoscientists. Mr Searle is an employee of Ashmore Advisory Pty Ltd and
independent consultant to Future Battery Minerals Limited. Mr Searle has sufficient experience, which is relevant to the
style of mineralisation and type of deposit under consideration and to the activity which he has undertaken to qualify as a
Competent Person as defined in the 2012 Edition of the ‘Australasian Code for the Reporting of Exploration Results,
Mineral Resources and Ore Reserves’. Mr Searle consents to the inclusion in this report of the matters based on this
information in the form and context in which it appears.
Forward-Looking Statements
This document may include forward-looking statements. Forward-looking statements include, but are not limited to,
statements concerning Future Battery Minerals Limited’s planned exploration program and other statements that are not
historical facts. When used in this document, the words such as "could," "plan," "estimate," "expect," "intend," "may”,
"potential", "should," and similar expressions are forward-looking statements. Although Future Battery Minerals Limited
believes that its expectations reflected in these forward-looking statements are reasonable, such statements involve risks
and uncertainties and no assurance can be given that actual results will be consistent with these forward-looking
statements.
Previously Reported Results
There is information in this announcement relating to exploration results which were previously announced on 20 March
2023, 11 April 2023, 13 April 2023, 20 April 2023, 3 May 2023, 9 May 2023, 17 May 2023, 19 May 2023, 6 June 2023, 8
June 2023, 22 June 2023, 26 June 2023, and 4 July 2023. Other than as disclosed in those announcements, the Company
confirms that it is not aware of any new information or data that materially affects the information included in the original
market announcements.
Future Battery Minerals Ltd
info@futurebatteryminerals.com.au
Suite 10, 38 Colin St, West Perth WA 6005
+61 8 6383 7817
ABN 91 148 966 545
futurebatteryminerals.com.au
ASX: FBM
Follow Us
14
APPENDIX 1 - INTEREST IN MINING TENEMENTS AND CAPITAL STRUCTURE
Interest in Mining Tenements in Australia
Tenement
Tenement
ID
Status
Interest at
beginning of
Quarter
Interest
acquired or
disposed
Interest at
end of
Quarter
Arden
EL 5821
Granted
90%
-
90%
Arden North
EL 6217
Granted
100%
-
100%
Bonaventura
EL 5973
Granted
100%
-
100%
Bonaventura Extension
EL 6252
Granted
100%
-
100%
Torrens East Copper Project
ELA 00159
Pending
-
-
-
Torrens East Copper Project
EL 6331
Granted
100%
-
100%
Saints
M29/245
Granted
100%
-
100%
Saints
M29/246
Granted
100%
-
100%
Leinster (the Horn)
E36/899
Granted
100%
-
100%
Leinster (the Horn)
E36/1030
Granted
100%
-
100%
Leinster (Sinclair North)
E36/895
Granted
100%
-
100%
Nepean
M15/709
Granted
80%
80%
-
Nepean
M15/1809
Granted
80%
80%
-
Nepean
P15/5750
Gran
Share your feedback
Discover