Phase 4 RC Results Extend Forrest High Grade Gold at Depth
Released
Released
Announcement PDF
ASX Announcement
15 April 2026
ASX: OR3
Follow Us
E. info@oreresources.com.au
P. +618 6383 7817
oreresources.com.au
ORE Resources
Suite 10, 38 Colin St, West Perth WA 6005
INITIAL PHASE 4 RC DRILLING RESULTS EXTEND FORREST
HIGH GRADE GOLD MINERALISATION AT DEPTH
Ore Resources Ltd (ASX: OR3) (Ore or the Company) is pleased to announce initial results from its Phase 4
Reverse Circulation (RC) drilling programme conducted at its Miriam Gold Project (Miriam), part of the
Company’s 100%-owned Coolgardie Gold Project located in the Goldfields region of Western Australia.
HIGHLIGHTS
• First batch of Phase 4 drilling results from Miriam, comprising 12 of the 23 RC drill holes completed at
the Forrest prospect (Forrest) from January to February 2026.
• 3 RC pre-collar holes are reported in this release of the total 5 pre-collar holes for diamond core
drilling, designed to target deeper extensions of the emerging gold system at Forrest.
• Results confirm multiple new extensions at depth in fresh rock and along strike in oxide gold lodes.
• Standout intercept in hole FGRC055 returned 25m @ 2.82 g/t Au from 170m including 5m @ 11.22
g/t Au from 186m, representing a 90m down dip extension to FGRC0270F
1
(12m @ 12 g/t from 48m).
• Other significant extensions to fresh rock gold lodes includes:
o 27m @ 1.54 g/t Au from 135m including 9m @ 3.14 g/t Au from 153m to EOH where it
remains open (FGRC056) representing a 40m down dip extension of FGRC0031F
2
. A diamond core
tail has subsequently extended this hole to 292.4m with assays pending.
o 9m @ 3.55 g/t Au from 78m (FGRC066)
o 8m @ 2.63 g/t Au from 48m (FGRC067)
• Single-metre resampling of Phase 3 RC hole FGRC0382F
3
delivered a higher-grade result of 24m @
4.04g/t from 37m.
• Phase 4 drilling and exploration programmes continue to advance at the Coolgardie Gold Projects:
o A second batch of assays containing all remaining RC drill results, targeting southerly strike
extensions and further down dip extensions, are expected to be released in the coming weeks.
o Sub-Audio Magnetics (SAM) survey results expected in the coming weeks.
o Diamond core sampling underway, with assay results expected to be released in mid-May 2026.
o Aircore (AC) drilling at Coolgardie Gold Project to commence in late April, targeting key regional
prospects at Miriam and first pass drilling at Burbanks East, with results expected from late May
2026.
• Ore is well funded and strongly positioned to advance all planned exploration at its Coolgardie and
Kal East Gold Projects over 2026, with A$10.7 million cash and zero debt (as at 31 December 2025).
1 Refer to OR3 ASX release dated 10 November 2025, “New Thick High-Grade Gold Lodes and Extensions at Forrest”
2 Refer to OR3 ASX release dated 2 September 2025, “Thick High-Grade Gold Intersected at Forrest”
3 Refer to OR3 ASX release dated 20 January 2026, “Miriam Phase 3 Assays Expand the Emerging Gold System at Forrest”
oreresources.com.au 2
Ore Resources’ Managing Director and CEO, Nick Rathjen, commented:
“Consistent with the exploration success achieved to date at Forrest, initial results from our Phase 4 RC drilling
programme have delivered further meaningful growth to the emerging multi-lode gold system. This first batch
of RC drilling results contains new high-grade gold intercepts that confirm continuity of mineralisation along
strike and importantly, demonstrate further extensions at depth of fresh rock gold lodes.
“A second batch containing all remaining RC drilling results, which target southern strike extensions and
additional down-dip extensions at Forrest, is expected to be received in the coming weeks. Encouragingly,
several of the RC drill holes completed as pre-collars to diamond drilling have returned significant high-grade
intercepts, providing strong confidence ahead of our recently completed 1,000m diamond drilling programme
at Forrest. This diamond drilling was specifically designed to test deeper extensions beyond the limits of RC
drilling, and we look forward to receiving these results which are expected in mid-May 2026.
“The Phase 4 drilling programme continues to progress across the broader Coolgardie Gold Projects, with
multiple exploration workstreams advancing in parallel. With a strong pipeline of near-term RC and diamond
drilling results and upcoming first-pass regional AC drill testing to commence in the coming weeks, Ore remains
well-positioned to continue expanding its gold footprint and advancing new discovery opportunities across the
W.A. Goldfields.”
Overview
Ore’s Phase 4 drilling programme comprises a combined 30,000m of RC, diamond core and AC drilling,
designed to materially advance gold prospectivity and new discovery potential across the Coolgardie Gold
Projects. A key focus of the Phase 4 programme is the delineation of new gold resources at Miriam, with
particular emphasis on extending the emerging gold system at Forrest, both along strike and down-dip.
Phase 4 drilling commenced with the completion of an RC drilling programme at Forrest, with the completion
of twenty-three (23) RC drill holes for approximately 3,900m drilled.3F
4
These RC drill holes were designed to
specifically target extensions to high-grade lodes and to test their geometry through off-section, oriented
drilling. Several of the RC holes were also completed as pre-collars for subsequent diamond drilling, which was
conducted over March 2026 following completion of the RC programme.4F
5
The Phase 4 RC drilling results reported in this release pertain to twelve (12) of the 23 RC holes completed, for
approx. 1,900m. This batch includes three (3) holes drilled as pre-collars for diamond drilling. Full details of
drill hole collar locations and assay results are provided in Appendix 1 below.
4 Refer to OR3 ASX release dated 3 February 2026, “30,000m Phase 4 Drilling Programme Commenced at Coolgardie Gold Project”
5 Refer to OR3 ASX release dated 5 March 2026, “Diamond Drilling Commenced at Forrest”
oreresources.com.au 3
Figure 1: Forrest Plan View with significant RC drill results
oreresources.com.au 4
Initial Phase 4 RC drilling results
The initial results from this Phase 4 programme have identified further extensions to the Forrest gold system,
particularly at depth in key fresh rock lodes and along strike in oxide lodes.
The standout intercept of this batch was returned from hole FGRC055, which returned 25m @ 2.82 g/t Au
from 170m including 5m @ 11.22 g/t Au from 186m. This drill hole successfully produced a 90m down-dip
mineralised extension to Phase 2 drill hole FGRC027 (which previously reported 12m @ 12.18g/t Au from
48m)5F
6
, highlighting a significant depth extension and demonstrating strong continuity of this key high-grade
gold lode. The hole collar was positioned on a northern traverse line and angled at an azimuth of 245 degrees
to the south-west. The purpose of the off-section angling was to help provide geometry controls through a
new point of intercept of the lode and further assist Ore with its developing geological model at Forrest.
6 Refer to OR3 ASX release dated 10 November 2025, “New Thick High-Grade Gold Lodes and Extensions at Forrest”
oreresources.com.au 5
Figure 2: Cross Section – Drill holes FGRC055 - FGRC027
Additionally, hole FGRC056 intercepted 27m @ 1.54 g/t Au from 135m, including 9m @ 3.14 g/t Au from 153m
to EOH where the mineralisation remains open. This drill hole produced a 40m down-dip extension to Phase 1
FGRC003 (which previously reported 12m @ 1.56 g/t Au from 75m)6F
7
, ending in mineralisation. Notably, this
hole was re-entered with the diamond drill rig after failing to reach target depth and was recategorised as a
pre-collar. A diamond drill rig extended the hole to 292.4m depth and tested possible extensions to multiple
lodes. The assay results for this diamond drill hole remain pending.
7 Refer to OR3 ASX release dated 2 September 2025, “Thick High-Grade Gold Intersected at Forrest”
oreresources.com.au 6
Figure 3: Cross Section – FGRC056
Drill holes FGRC066 successfully intercepted the fresh rock lode previously identified during Phase 3 drilling7F
8
.
FGRC066 intercepted 9m @ 3.55 g/t Au from 78m, extending mineralisation from the oxide lode identified in
hole FGRC038 (24m @ 4.01g/t from 37m) through to fresh rock. In addition, FGRC067 intercepted 8m @ 2.63
g/t Au from 48m (FGRC067) within the upper oxide zone, producing a 50m southern strike extension of the
western lode identified in holes FGRC036 and FGRC037.
In addition, Ore completed single metre resampling of Phase 3 RC hole FGRC038 (which previously returned
25m @ 3.01g/t Au from 36m). The resampling resulted in an increase in grade, with this drill hole now
returning 24m @ 4.04g/t Au from 37m.
8 Refer to OR3 ASX release dated 20 January 2026, “Miriam Phase 3 Assays Expand the Emerging Gold System at Forrest”
oreresources.com.au 7
Figure 4: Forrest Schematic – Long Section
Next steps
While only approximately half of the assay results have been received to date, the Phase 4 RC drilling
programme has already demonstrated considerable success with significant down-dip extensions intersected
at several key fresh rock and oxide gold lodes.
A second batch of assay results pertaining to the remaining eleven (11) RC drill holes (including the final two
(2) diamond pre-collars) is expected to be received in the coming weeks. These remaining drill holes comprise
drill lines targeting potential southerly strike extensions and additional down-dip extensions to know gold
lodes.
Following the completion of RC drilling at Forrest, Ore conducted a 1,000m diamond drilling programme
during March 2026. This programme was designed to define key structural and lithological controls, in addition
to collecting mineralogy and density information to support expansion of the existing gold footprint at Forrest
and inform future resource estimations. Five RC holes from the phase 4 programme were utilized as pre-
collars, one hole from phase 3 (FGRC039) was re-entered to extend to targeted lodes and one diamond hole
was drilled from surface.
oreresources.com.au 8
Figure 5: Miriam Plan View
All diamond core drill holes have now been processed, and samples are now being cut and submitted for
assay. The results of this programme are expected to be returned in mid-May 2026.
In addition to these results, Ore continues to advance its Phase 4 programme with the following workstreams:
oreresources.com.au 9
• SAM geophysical survey completed at Forrest with data currently undergoing processing. Results are
expected to be released in the coming weeks.
• Heritage survey clearances completed at Burbanks East for the commencement of first-pass AC drill
testing.
• Regional AC drilling commencing in late-April. This programme will further test key Miriam regional
prospects along with first pass drilling at Burbanks East and Mt Monger (part of the Kal East Gold
Projects). The results from this programme are expected to be released from mid-to-late May 2026.
Figure 6: Coolgardie Regional Map8F
9
9 Three Mile Hill refer to Focus Minerals ASX Announcement dated 1st December 2023, MacPhersons and Geko refer to Beacon Minerals’ Resource and
Reserves. Burbanks refer to Horizon Minerals Reserves & Resources and Bullabulling refer to Minerals 260 ASX Announcement dated 14th January 2025
oreresources.com.au 10
This announcement has been authorised for release by the Board of Directors of the Company.
For further information, visit http://www.oreresources.com.au/ or contact:
Nicholas Rathjen Robin Cox
CEO & Managing Director Technical Director
E: nrathjen@oreresources.com.au E: rcox@oreresources.com.au
https://oreresources.com.au/link/r69xwe
Competent Persons Statement
The information in this announcement that relates to exploration results is based on and fairly represents information compiled
by Mr Robin Cox BSc (E.Geol), a Competent Person, who is a Member of the Australian Institute of Mining and Metallurgy.
Mr Cox is the Company’s Chief Geologist and has sufficient experience that is relevant to the style of mineralisation and type
of deposit under consideration and to the activity being undertaken to qualify as a Competent Person as defined in the 2012
Edition of the Australasian Code for Reporting of Exploration Results, Mineral Resources and Ore Reserves. Mr Cox consents
to the inclusion in this announcement of the matters based on his information in the form and context in which it appears.
Forward-Looking Statements
This document may include forward-looking statements. Forward-looking statements include, but are not limited to, statements
concerning Ore Resource Limited’s planned exploration programme and other statements that are not historical facts. When
used in this document, the words such as “could,” “plan,” “estimate,” “expect,” “intend,” “may”, “potential”, “should,” and similar
expressions are forward-looking statements. Although Ore Resources Limited believes that its expectations reflected in these
forward-looking statements are reasonable, such statements involve risks and uncertainties, and no assurance can be given
that actual results will be consistent with these forward-looking statements.
Previously Reported Results
The information in this announcement that relates to Exploration Results is extracted from the ASX announcements (Original
Announcements), as referenced, which are available at www.oreresources.com.au. Ore confirms that it is not aware of any
new information or data that materially affects the information included in the Original Announcements and, that all material
assumptions and technical parameters underpinning the estimates in the Original Announcements continue to apply and have
not materially changed. Ore confirms that the form and context in which the Competent Persons’ findings are presented have
not been materially modified from the original announcement.
oreresources.com.au 11
About Ore Resources Ltd (ASX:OR3)
THE BUSINESS: Gold and lithium exploration and development
Ore Resources (ASX: OR3) is an exploration and development company focused on rapidly advancing its 100%
owned Coolgardie and Kal East Gold and Lithium Projects in the Eastern Goldfields of Western Australia.
THE LOCATION: Infrastructure-rich project setting
The Eastern W.A. Goldfields is an
outstanding location in which to explore
for, build, and operate gold and lithium
mines. It is a long-established mining
province with all the accompanying
benefits, including all-year land access,
skilled labour, mining services and
infrastructure.
The Projects are positioned within 50km
of the mining hub of Kalgoorlie (via
sealed and access roads), approximately
370km to the port of Esperance and
approximately 550km to Perth via road
and rail. We are proximal to multiple
gold and lithium mining and processing
operations and development projects of
substantial scale.
This available range of potential
commercialisation options, including
standalone development, positions us
well to monetise current and future
success.
THE TEAM: Proven value generators
Our carefully assembled team has an extensive track record of exploration success, project stewardship,
development expertise and operating excellence that has repeatedly resulted in the delivery of substantial
shareholder value: Nick Rathjen (MD), Robin Cox (Technical Director), Nev Power (Chairman), Rob Waugh (NED).
THE CAPACITY: Balance sheet strength and runway
We are a business and team that is resolutely focussed on the stewardship of our shareholders’ capital and the
astute application of this capital for maximal return. We are well-funded to undertake our extensive planned
exploration and evaluation work programs throughout 2026 and beyond.
oreresources.com.au 12
Table 1 –Drill Hole Significant Intercepts >0.3g/t
(Intervals represented as down dole length)
Hole ID From To Interval Grade Au
(g/t)
Intercept Gram X
M
FGRC052 64 65 1 2.21 1.00m @ 2.21 g/t 2.21
FGRC052 69 72 3 0.81 3.00m @ 0.81 g/t 2.43
FGRC052 92 93 1 0.34 1.00m @ 0.34 g/t 0.34
FGRC052 114 118 4 0.57 4.00m @ 0.57 g/t 2.28
FGRC052 122 123 1 0.46 1.00m @ 0.46 g/t 0.46
FGRC052 138 139 1 0.45 1.00m @ 0.45 g/t 0.45
FGRC052 155 161 6 0.81 6.00m @ 0.81 g/t 4.86
FGRC053 12 16 4 0.7 4.00m @ 0.70 g/t 2.8
FGRC053 20 24 4 0.77 4.00m @ 0.77 g/t 3.08
FGRC053 42 52 10 0.5 10.00m @ 0.50 g/t 5
FGRC053 91 92 1 0.34 1.00m @ 0.34 g/t 0.34
FGRC054 28 29 1 1.4 1.00m @ 1.40 g/t 1.4
FGRC054 34 38 4 0.52 4.00m @ 0.52 g/t 2.08
FGRC054 75 77 2 2.68 2.00m @ 2.68 g/t 5.36
FGRC054 139 140 1 0.49 1.00m @ 0.49 g/t 0.49
FGRC055 12 20 8 0.39 8.00m @ 0.39 g/t 3.12
FGRC055 32 40 8 1.22 8.00m @ 1.22 g/t 9.76
FGRC055 48 52 4 0.31 4.00m @ 0.31 g/t 1.24
FGRC055 161 162 1 0.59 1.00m @ 0.59 g/t 0.59
FGRC055 170 192 25 2.82 25.00m @ 2.82 g/t 70.5
including 186 191 5 11.22 5.00m @ 11.22 g/t 56.1
FGRC056 118 122 4 1.52 4.00m @ 1.52 g/t 6.08
FGRC056 135 162 27 1.54 27.00m @ 1.54 g/t 41.58
including 153 162 9 3.14 9.00m @ 3.14 g/t 28.26
FGRC057 92 96 4 0.71 4.00m @ 0.71 g/t 2.84
FGRC057 101 106 5 0.46 5.00m @ 0.46 g/t 2.3
FGRC057 131 132 1 0.35 1.00m @ 0.35 g/t 0.35
FGRC057 135 145 10 1.02 10.00m @ 1.02 g/t 10.2
FGRC057 151 158 7 0.38 7.00m @ 0.38 g/t 2.66
FGRC058 60 61 1 0.66 1.00m @ 0.66 g/t 0.66
FGRC058 79 86 7 1.39 7.00m @ 1.39 g/t 9.73
FGRC058 108 109 1 2.81 1.00m @ 2.81 g/t 2.81
FGRC058 131 140 9 0.69 9.00m @ 0.69 g/t 6.21
FGRC058 154 157 3 0.57 3.00m @ 0.57 g/t 1.71
FGRC065 68 72 4 0.37 4.00m @ 0.37 g/t 1.48
FGRC066 16 20 4 0.36 4.00m @ 0.36 g/t 1.44
FGRC066 78 87 9 3.55 9.00m @ 3.55 g/t 31.95
FGRC066 85 86 1 4.3 1.00m @ 4.30 g/t 4.3
FGRC066 104 107 3 0.78 3.00m @ 0.78 g/t 2.34
oreresources.com.au 13
FGRC066 116 121 5 0.44 5.00m @ 0.44 g/t 2.2
FGRC066 149 150 1 0.53 1.00m @ 0.53 g/t 0.53
FGRC067 48 56 8 2.63 8.00m @ 2.63 g/t 21.04
FGRC070 146 147 1 0.55 1.00m @ 0.55 g/t 0.55
FGRC070 172 174 2 0.46 2.00m @ 0.46 g/t 0.92
FGRC038
(new
single
metre
sampling
results)
37 61 24 4.04 24.00m @ 4.04 g/t 96.96
Table 2 – Drill Hole Location Information
(UTM MGA 94 Zone 51)
Hole ID Hole
Type
Depth Easting Northing RL Dip Azimuth Assay
Status
Hole
Design
Diamond
Extension
depth
FGRC052 RC 174 319707.9 6562764 402.5 -50 70 Received
FGRC053 RC 144 319763 6562856 405.4 -60 270 Received
FGRC054 RC 144 319756.7 6562837 405. -60 270 Received
FGRC055 RC 198 319817.6 6562809 407. -60 245 Received
FGRC056 RC/DD 162 319862.4 6562840 409.1 -60 270 Received PC 292.4
FGRC057 RC 180 319855.9 6562870 409.9 -60 270 Received
FGRC058 RC 162 319711.7 6562741 402.2 -60 70 Received
FGRC065 RC 180 319770.2 6562520 410.2 -60 90 Received
FGRC066 RC 150 319807.8 6562888 413.8 -60 270 Received
FGRC067 RC 126 319716.6 6562837 412.9 -60 270 Received
FGRC070 RC/DD 174 319877 6562754 408 -60 270 Received PC 309.4
FGRC071 RC/DD 132 319897 6562703 408 -60 270 Received PC 297.5
FGRC072 RC 198 319650 6562611 406.5 -60 90 Awaiting
FGRC073 RC/DD 150 319690.3 6562520 405.9 -60 90 Awaiting PC 201.6
FGRC074 RC/DD 138 319609.8 6562518 412.9 -60 90 Awaiting PC 277
FGRC059 RC 180 319766 6562654 402. -60 90 Awaiting
FGRC060 RC 150 319806.2 6562663 402.7 -60 90 Awaiting
FGRC061 RC 180 319807.8 6562608 401.9 -60 90 Awaiting
FGRC062 RC 180 319767.1 6562610 400.9 -60 90 Awaiting
FGRC063 RC 180 319725.8 6562610 400.7 -60 90 Awaiting
FGRC064 RC 210 319695.4 6562612 401. -60 90 Awaiting
FGRC068 RC 177 319686.1 6562704 401.1 -65 110 Awaiting
FGRC069 RC 204 319816.5 6562746 404.7 -60 245 Awaiting
FGRC039D RC/DD 204 319679.4 6562806.8 409.8 -65 90 Awaiting PC 301.4
FGDD001 DD 252.3 319679.4 6562806.8 409.8 -55 90 Awaiting DD
oreresources.com.au 14
JORC Code, 2012 Edition, Table 1
Section 1: Sampling Techniques and Data
CRITERIA EXPLANATION COMMENTARY
Sampling
techniques
• Nature and quality of sampling (eg cut
channels, random chips, or specific
specialised industry standard
measurement tools appropriate to the
minerals under investigation, such as
down hole gamma sondes, or handheld
XRF instruments, etc). These examples
should not be taken as limiting the broad
meaning of sampling.
• Include reference to measures taken to
ensure sample representivity and the
appropriate calibration of any
measurement tools or systems used.
• Aspects of the determination of
mineralisation that are Material to the
Public Report. In cases where ‘industry
standard’ work has been done this would
be relatively simple (eg ‘reverse
circulation drilling was used to obtain 1m
samples from which 3kg was pulverised
to produce a 30g charge for fire assay’).
In other cases more explanation may be
required, such as where there is coarse
gold that has inherent sampling
problems. Unusual commodities or
mineralisation types (eg submarine
nodules) may warrant disclosure of
detailed information.
• Reverse Circulation drilling collects a 1m
bulk sample. A 2-3kg sample is cone split
from the drill rig and collected in a pre-
marked calico bag. 4m composites
samples are collected proportionally via
spear from the 1m bulk sample. Both 1
metre and 4 metre composites are
selected for fire assay purpose producing
a 50g homogenised split for assay. When
anomalous 4m composite samples
intercepts >0.1g/t Au are received the
corresponding zone is then sub assayed
to their 1m sample.
• Certified reference material, including
known standards and blank material are
inserted at a rate of 1 in 20 for primary
samples, field duplicates are collected at
1 in 30.
• Analysis of QA/QC results is undertaken
by the company to ensure sampling
accuracy.
• Laboratory (ALS) also perform internal
Qa/Qc sampling at a rate of 1 to 25.
Drilling
techniques
• Drill type (eg core, reverse circulation,
open-hole hammer, rotary air blast,
auger, Bangka, sonic, etc) and details
(eg core diameter, triple or standard
tube, depth of diamond tails, face-
sampling bit or other type, whether core
is oriented and if so, by what method,
etc).
• Reverse Circulation uses 5.5 inch
pneumatic hammer to pulverise oxidised
and fresh rock which is then delivered to
the cyclone and cone splitter via
compressed air.
Drill sample
recovery
• Method of recording and assessing core
and chip sample recoveries and results
assessed.
• Measures taken to maximise sample
recovery and ensure representative
nature of the samples.
• Whether a relationship exists between
sample recovery and grade and
whether sample bias may have
occurred due to preferential loss/gain of
fine/coarse material.
• All 1m samples and 4m composite
samples are weighed and recorded in the
Ore database.
• Bulk sample recovery was
measured/commented in sample logs.
• No sample bias relationship has been
identified.
Logging • Whether core and chip samples have
been geologically and geotechnically
logged to a level of detail to support
appropriate Mineral Resource
estimation, mining studies and
metallurgical studies.
• Drill holes have been geologically logged
by geologists in the field, recording
lithology, oxidation, weathering, texture,
structure and mineralogy
oreresources.com.au 15
• Whether logging is qualitative or
quantitative in nature. Core (or costean,
channel, etc) photography.
• The total length and percentage of the
relevant intersections logged.
• Geological data has been recorded on
Ore database. Logging is a qualitative
nature.
Sub-sampling
techniques and
sample
preparation
• If core, whether cut or sawn and
whether quarter, half or all core taken.
• If non-core, whether riffled, tube
sampled, rotary split, etc and whether
sampled wet or dry.
• For all sample types, the nature, quality
and appropriateness of the sample
preparation technique
• Quality control procedures adopted for
all sub-sampling stages to maximise
representivity of samples.
• Measures taken to ensure that the
sampling is representative of the in-situ
material collected, including for instance
results for field duplicate/second-half
sampling.
• Whether sample sizes are appropriate
to the grain size of the material being
sampled.
• Sampling of drill chips included
compositing by spear sample on 4m
composites.
• Single metre samples were cone split to
obtain an approximate 2-3kg sample.
• Certified reference material, including
known standards and blank material are
inserted at a rate of 1 in 20 for primary
samples, field duplicates are collected at
1 in 30.
• Analysis of QA/QC results is undertaken
by the company and external consultants
to ensure sampling accuracy.
• Laboratory (ALS) also perform internal
Qa/Qc sampling at a rate of 1 to 25.
Quality of assay
data and
laboratory tests
• The nature, quality and appropriateness
of the assaying and laboratory
procedures used and whether the
technique is considered partial or total.
• For geophysical tools, spectrometers,
handheld XRF instruments, etc, the
parameters used in determining the
analysis including instrument make and
model, reading times, calibrations
factors applied and their derivation, etc.
• Nature of quality control procedures
adopted (eg standards, blanks,
duplicates, external laboratory checks)
and whether acceptable levels of
accuracy (i.e. lack of bias) and precision
have been established.
• All samples were prepared and assayed
by ALS in Perth
• Samples preparation included weighing,
pulverising and splitting.
• A 50g split was then assayed via Fire
Assay and Atomic Absorption
Spectrometer under ALS code Au-AA26
• The methodology is considered an
industry standard in determining gold
grades in known gold bearing systems.
• Internal laboratory Qa/Qc processes
were conducted including the insertion of
Certified reference material, blanks and
duplicates.
• Qa/Qc results are acceptable
Verification of
sampling and
assaying
• The verification of significant
intersections by either independent or
alternative company personnel.
• The use of twinned holes.
• Documentation of primary data, data
entry procedures, data verification, data
storage (physical and electronic)
protocols.
• Discuss any adjustment to assay data.
• Significant intercepts are calculated by
database algorithm and verified by Ore
staff and Database contractors.
• All field data is imported to the Ore
geochemistry database utilising industry
data logging software LogChief. This is
uploaded to sequel server database
hosted on Maxwell Geoservices
proprietry software and managed for Ore
by an external database company
Mitchell River Group Pty Ltd.
• No adjustments are made to assay data
• Gold significant intercepts are calculated
using a 0.3g/t lower cut off.
• Grade by metre calculations are a simple
multiplication of the gold grade by the
width of the intercept and this is used to
weight the significance of an intercept.
oreresources.com.au 16
• Ore twinned selective historic drill holes
of identified lodes to determine accuracy
of historic results.
Location of data
points
• Accuracy and quality of surveys used to
locate drill holes (collar and down-hole
surveys), trenches, mine workings and
other locations used in Mineral
Resource estimation.
• Specification of the grid system used.
• Quality and adequacy of topographic
control.
• Drill Holes were surveyed utilising a
Differential GPS with sub 1cm accuracy
including elevation
• All drill hole collar information has been
supplied and projected to UTM MGA 94
Zone 51
Data spacing
and distribution
• Data spacing for reporting of
Exploration Results.
• Whether the data spacing and
distribution is sufficient to establish the
degree of geological and grade
continuity appropriate for the Mineral
Resource and Ore Reserve estimation
procedure(s) and classifications
applied.
• Whether sample compositing has been
applied.
• At Forrest, holes were drilled on 30m
spacing, 60m line spacing.
• Data spacing is appropriate for identifying
continuous and non-continuous
geochemical anomalies and future
Mineral Resource estimates.
Orientation of
data in relation
to geological
structure
• Whether the orientation of sampling
achieves unbiased sampling of possible
structures and the extent to which this is
known, considering the deposit type.
• If the relationship between the drilling
orientation and the orientation of key
mineralised structures is considered to
have introduced a sampling bias, this
should be assessed and reported if
material.
• Drilling has been conducted on E-W grid
lines. Geological units in the region have
a dominantly N-S to NE-SW strike. As
such the E-W drilling provides relative
oblique interceptions.
• Drilling intercepted both oxide/supergene
mineralisation and fresh bedrock
intercepts. More drilling is required to
better determine the dip and direction of
the fresh bedrock gold mineralisation.
a.
Sample security • The measures taken to ensure sample
security.
• All samples are collected in the field on
the day of drilling and transported directly
to an ALS laboratory located 40km’s
away in Kalgoorlie
• Samples are delivered daily to the
Kalgoorlie ALS laboratory
• ALS transport the samples to a Perth
laboratory for analysis.
• All calico sample bags are stored within
prelabelled polly weave bags and zip tied
for transportation.
Audits or
reviews
• The results of any audits or reviews of
sampling techniques and data.
No independent audit or review has been
undertaken.
Section 2: Reporting of Exploration Results
CRITERIA EXPLANATION COMMENTARY
Mineral tenement
and land tenure
status
• Type, reference name/number, location
and ownership including agreements or
material issues with third parties such
The Miriam Project consists of 5
prospecting leases.
oreresources.com.au 17
as joint ventures, partnerships,
overriding royalties, native title
interests, historical sites, wilderness or
national park and environmental
settings.
• The security of the tenure held at the
time of reporting along with any known
impediments to obtaining a licence to
operate in the area.
• Granted leases are P15/6136,
P15/6137, P156138 and P15/6139.
P15/6135 remains in application
• Leases P15/6136-6139 are held by
Coolgardie Nickel Pty Ltd, now an
100% subsidiary of Future Battery
Minerals Ltd. P15/6135 is held by
Limelight Industries Pty Ltd until
time of grant
• The ten
Share your feedback
Discover