Diamond Drilling Advances Kangaroo Hills Lithium Studies
Released
Released
Announcement PDF
ASX Announcement
19 August 2026
ASX: OR3
Follow Us
E. info@oreresources.com.au
P. +618 6383 7817
oreresources.com.au
ORE Resources
Suite 10, 38 Colin St, West Perth WA 6005
DIAMOND DRILLING REINFORCES LITHIUM PROSPECTIVITY
AND STUDY ADVANCEMENT AT KANGAROO HILLS
Ore Resources Ltd (ASX: OR3) (Ore or the Company) is pleased to announce the results from the diamond core
drilling programme conducted at its 100%-owned Kangaroo Hills Lithium Project (Kangaroo Hills), part of the
broader Coolgardie Lithium Projects, located in the Goldfields region of Western Australia.
HIGHLIGHTS
• Results received from seven (7) diamond drill holes for 640m completed at Kangaroo Hills in July 2026.
• Drill program designed to collect bulk mineralised HQ and PQ core samples for ore sorting,
metallurgical and geotechnical studies, supporting ongoing project development works.
• Results further demonstrate the shallow, high-grade nature of the Big Red pegmatite system, with all
five (5) targeted holes (the other two being for geotechnical purposes) returning significant intervals:
o 27m @ 1.33% Li2O from 4m (KHDD018), including 5m @ 2.01% Li2O from 11m
o 25m @ 1.33% Li2O from 59m (KHDD013)
o 22m @ 1.43% Li2O from 54m (KHDD015), including 11m @ 1.70% Li2O from 62m
o 29m @ 1.06% Li2O from 80m (KHRC218D)
o 22m @ 1.31% Li2O from 89m (KHDD014)
• Representative core samples collected for upcoming planned ore sorting assessments and
metallurgical testwork aimed at optimising project economics and product quality.
• Ore is advancing delivery of Direct Shipping of Ore (DSO) study for a near-term, capital-lite operation
at Kangaroo Hills, which is expected to be completed in the coming weeks.
• The Study is to be supported by declaration of an initial Mineral Resource Estimate (MRE) for
Kangaroo Hills, which forms the basis of the assessment.
• Low intrinsic iron content of Big Red mineralisation also recently confirmed, reinforcing expected DSO
product quality and downstream processing amenability.
• Regional exploration across the broader Coolgardie Lithium Projects continues to progress, with
significant potential for further resource growth and new discoveries across Ore's tenure.
• Results from the recent 3,000m Reverse Circulation (RC) drilling programme targeting Kangaroo Hills
and the Miriam Lithium Project are expected to be received in September 2026.
• Ore is well funded and strongly positioned to advance all planned exploration at its Coolgardie and
Kal East Gold and Lithium Projects, with A$6.8 million cash and zero debt (as at 30 June 2026).
oreresources.com.au 2
Ore Resources’ Managing Director and CEO, Nick Rathjen, commented:
“Our diamond drilling programme at Kangaroo Hills has delivered strong outcomes across two fronts. In
addition to providing the representative core samples necessary for planned further metallurgical, ore sorting
and geotechnical studies at Kangaroo Hills, the programme has also returned significant lithium mineralisation
in all targeted drill holes, further demonstrating the continuity of grade and thickness of the Big Red pegmatite
system, highlighted by the intercept of 27m @ 1.33% Li2O from a near surface depth of 4m.”
“Importantly, our recent assessment of potential iron oxide contamination during laboratory sample
preparation has also confirmed the low intrinsic iron content of the mineralisation at Big Red. This delivers
further confidence in the quality of the deposit and a further positive indication of its suitability for downstream
processing.”
“With our geological understanding of Kangaroo Hills continuing to strengthen, Ore is advancing a technical
study aimed at optimising project economics and enhancing product quality. The samples collected during this
diamond drilling will support ore sorting assessments and additional metallurgical testwork, which are
expected to further refine our development strategy for the project.”
“We remain on track to deliver a DSO Study in the coming weeks. This Study is set to deliver the technical and
economic assessment of a potential DSO operation at Kangaroo Hills, in conjunction with declaration of an
initial MRE for Kangaroo Hills. Together, these milestones will provide an important foundation for evaluating
the project's development potential and supporting future value creation as Kangaroo Hills advances to the
next stage of development.”
Overview
Following the successful RC drilling programme undertaken in May 2026 at Kangaroo Hills1
, the Company
expanded its operational focus at the Coolgardie Lithium Projects through a diamond drilling programme and
subsequent 3,000m RC drilling programme at Kangaroo Hills.
The diamond drilling programme was conducted in July 2026 and comprised seven (7) diamond core holes
drilled for approximately 640m. The programme was designed to collect metallurgical and geotechnical
samples to support the advancement of key economic studies. Notably, bulk mineralised HQ (H-size core) and
PQ core (P-size core) were recovered for ore sorting assessments and subsequent metallurgical testwork.
The programme included six diamond holes drilled from surface and one diamond tail extending from a
previously completed RC hole. Additionally, two of these holes were strategically located to facilitate potential
geotechnical investigations. All drill holes were planned along the Big Red pegmatite to provide representative
spatial coverage of the deposit and ensure the collection of suitable material for the proposed testwork
programmes.
1 Refer to OR3 ASX releases dated 5 May 2026, “Coolgardie Lithium Project Update”, and 3 June 2026, “New Lithium Drilling Extends Big Red & Potoroo”
oreresources.com.au 3
Figure 1: Coolgardie Lithium Projects – Plan View
Diamond drilling further confirms shallow, high-grade mineralisation
The diamond drilling programme has further reinforced the significant underlying lithium prospectivity of
Kangaroo Hills, with all five (5) targeted holes intersecting shallow, thick, high-grade lithium mineralisation.
Two (2) additional holes, KHDD016 and KHDD017 were drilled for stratigraphic Geotechnical purposes.
The standout result of this programme was returned from Hole KHDD018, which delivered a significantly
stronger outcome than anticipated, intersecting 27m @ 1.33% Li2O from 4m, including a high-grade internal
interval of 5m @ 2.01% Li2O from 11m.
Importantly, KHDD018 was drilled between two holes completed during the Company’s 2023 exploration
drilling programmes2
. These two drill holes previously returned 16m @ 1.09% Li2O from 11m (KHRC022) and
12m @ 1.02% Li2O from 8m (KHRC021). The result from KHDD018 clearly exceeded expectations, returning a
mineralised intercept approximately double the anticipated thickness, from near surface.
2 Refer to OR3 ASX release dated 3 May 2023, “Multiple Thick High Grade Assay Results Extend Lithium Discovery”
oreresources.com.au 4
Figure 2: Cross Section – Hole KHDD018
The other four (4) targeted holes also returned significant results, which included:
• 25m @ 1.33% Li2O from 59m (KHDD013)
• 22m @ 1.43% Li2O from 54m (KHDD015), including 11m @ 1.70% Li2O from 62m
• 29m @ 1.06% Li2O from 80m (KHRC218D)
• 22m @ 1.31% Li2O from 89m (KHDD014)
Iron oxide contamination assessment confirms low intrinsic iron content of Big Red mineralisation
To support the advancing Scoping Study, Ore completed an assessment of potential iron oxide contamination
introduced during laboratory sample preparation. Representative samples were split prior to pulverisation,
with duplicate analyses undertaken following preparation using both steel and tungsten crucibles.
Results indicate that steel crucibles, which have been used for all sampling to date, introduce an average Fe2O3
contamination factor of approximately 2.5x. Mineralised samples prepared using steel crucibles returned
Fe₂O₃ values ranging between 0.79 - 0.9%, compared with 0.31 -0.43% Fe2O3 for corresponding samples
prepared using tungsten crucibles.
Understanding the true iron content of the in-situ mineralisation is an important component of evaluating
downstream processing suitability and product quality, particularly as iron impurities can adversely affect
lithium concentrate and chemical production. This work was therefore designed to validate historical assay
results and provide greater confidence in the intrinsic chemical characteristics of the Big Red pegmatite.
oreresources.com.au 5
Confirmation of the low intrinsic iron content of Big Red mineralisation via this testing method has directly
provided further confidence in potential DSO product quality and downstream processing amenability.
Next steps
Regional exploration activities across the broader Coolgardie Lithium Projects are progressing, with RC drilling
targeting further growth and new discoveries across the Company’s underexplored lithium tenure.
Ore continues to advance the delivery of a Study for Kangaroo Hills, focused on the technical and economic
assessment of a potential near-term, capital-lite DSO operation. The Study is set to be underpinned by the
declaration of an initial MRE for Kangaroo Hills. Both the Study and MRE are expected to be completed in the
coming weeks.
Figure 3: Coolgardie Regional Map
oreresources.com.au 6
Table 1 –Drill Hole Significant Intercepts >0.3% Li2O
(Intervals represented as down dole length)
Hole ID
Depth
From
Depth
To
Interval
Width
Grade
Li2O%
Ta2O5
ppm
Fe2O3
%
Steel
Fe2O3 %
Tungsten Intercept Description
KHDD013 59 84 25 1.33 107 25m @ 1.33% Li2O from 59m
KHDD014 89 111 22 1.31 159 0.79 0.27 22m @ 1.31% Li2O from 89m
KHDD015 54 76 22 1.43 100 0.92 0.31 22m @ 1.43% Li2O from 54m
including 62 73 11 1.7 92 11m @ 1.70% Li2O from 62m
KHDD016 123 124 1 1 159 0.99 0.31 1m @ 1.00% Li2O from 123m
KHDD017 NSI
KHDD018 4 31 29 1.33 89 0.91 0.43 27m @ 1.33% Li2O from 4m
including 11 16 5 2.01 87 5m @ 2.01% Li2O from 11m
KHRC218D 80 109 29 1.06 126 0.82 0.38 29m @ 1.06% Li2O from 80m
Table 2 – Drill Hole Location Information
(UTM MGA 94 Zone 51)
Hole ID
Hole
Type Depth Easting Northing RL Azimuth Dip
KHDD013 DDH 93 317969 6558344 401 300 -70
KHDD014 DDH 117 317873 6558412 403 105 -55
KHDD015 DDH 83.8 317922 6558324 403 40 -80
KHDD016
DDH-
Geotech 139.7 317937 6558533 397 60 -70
KHDD017
DDH -
Geotech 127.9 317966 6558478 395 270 -70
KHDD018 DDH 37.1 317872 6558231 398 0 -90
KHRC218D RC_DDT 114.2 318023 6558403 397 283 -60
This announcement has been authorised for release by the Board of Directors of the Company.
For further information, visit http://www.oreresources.com.au/ or contact:
Nicholas Rathjen Robin Cox
CEO & Managing Director Technical Director
E: nrathjen@oreresources.com.au E: rcox@oreresources.com.au
https://oreresources.com.au/link/PqaBxP
oreresources.com.au 7
Competent Persons Statement
The information in this announcement that relates to exploration results is based on and fairly represents information compiled
by Mr Robin Cox BSc (E.Geol), a Competent Person, who is a Member of the Australian Institute of Mining and Metallurgy.
Mr Cox is the Company’s Chief Geologist and has sufficient experience that is relevant to the style of mineralisation and type
of deposit under consideration and to the activity being undertaken to qualify as a Competent Person as defined in the 2012
Edition of the Australasian Code for Reporting of Exploration Results, Mineral Resources and Ore Reserves. Mr Cox consents
to the inclusion in this announcement of the matters based on his information in the form and context in which it appears.
Forward-Looking Statements
This document may include forward-looking statements. Forward-looking statements include, but are not limited to, statements
concerning Ore Resource Limited’s planned exploration programme and other statements that are not historical facts. When
used in this document, the words such as “could,” “plan,” “estimate,” “expect,” “intend,” “may”, “potential”, “should,” and similar
expressions are forward-looking statements. Although Ore Resources Limited believes that its expectations reflected in these
forward-looking statements are reasonable, such statements involve risks and uncertainties, and no assurance can be given
that actual results will be consistent with these forward-looking statements.
Previously Reported Results
The information in this announcement that relates to Exploration Results is extracted from the ASX announcements (Original
Announcements), as referenced, which are available at www.oreresources.com.au. Ore confirms that it is not aware of any
new information or data that materially affects the information included in the Original Announcements and, that all material
assumptions and technical parameters underpinning the estimates in the Original Announcements continue to apply and have
not materially changed. Ore confirms that the form and context in which the Competent Persons’ findings are presented have
not been materially modified from the original announcement.
oreresources.com.au 8
About Ore Resources Ltd (ASX: OR3)
THE BUSINESS: Gold and lithium exploration and development
Ore Resources (ASX: OR3) is an exploration and development company focused on rapidly advancing its 100%
owned Coolgardie and Kal East Gold and Lithium Projects in the Eastern Goldfields of Western Australia.
THE LOCATION: Infrastructure-rich project setting
The Eastern W.A. Goldfields is an
outstanding location in which to explore for,
build, and operate gold and lithium mines. It
is a long-established mining province with all
the accompanying benefits, including all-
year land access, skilled labour, mining
services and infrastructure.
The Projects are positioned within 50km of
the mining hub of Kalgoorlie (via sealed and
access roads), approximately 370km to the
port of Esperance and approximately 550km
to Perth via road and rail. We are proximal to
multiple gold and lithium mining and
processing operations and development
projects of substantial scale.
This available range of potential
commercialisation options, including
standalone development, positions us well
to monetise current and future success.
THE TEAM: Proven value generators
Our carefully assembled team has an extensive track record of exploration success, project stewardship,
development expertise and operating excellence that has repeatedly resulted in the delivery of substantial
shareholder value: Nick Rathjen (MD), Robin Cox (Technical Director), Nev Power (Chairman), Rob Waugh (NED).
THE CAPACITY: Balance sheet strength and runway
We are a business and team that is resolutely focussed on the stewardship of our shareholders’ capital and the
astute application of this capital for maximal return. We are well-funded to undertake our extensive planned
exploration and evaluation work programs throughout 2026 and beyond.
oreresources.com.au 9
JORC Code, 2012 Edition, Table 1
Section 1: Sampling Techniques and Data
CRITERIA EXPLANATION COMMENTARY
Sampling
techniques
● Nature and quality of sampling (eg cut
channels, random chips, or specific
specialised industry standard
measurement tools appropriate to the
minerals under investigation, such as down
hole gamma sondes, or handheld XRF
instruments, etc). These examples should
not be taken as limiting the broad meaning
of sampling.
● Include reference to measures taken to
ensure sample representivity and the
appropriate calibration of any
measurement tools or systems used.
● Aspects of the determination of
mineralisation that are Material to the
Public Report. In cases where ‘industry
standard’ work has been done this would
be relatively simple (eg ‘reverse circulation
drilling was used to obtain 1m samples
from which 3kg was pulverised to produce
a 30g charge for fire assay’). In other
cases more explanation may be required,
such as where there is coarse gold that
has inherent sampling problems. Unusual
commodities or mineralisation types (eg
submarine nodules) may warrant
disclosure of detailed information.
Drilling
● Lithium-Caesium-Tantalum (LCT)
mineralisation at the Kangaroo Hills
Lithium Project (KHLP) has been sampled
from the following drilling techniques.
● Diamond core drilling (DD) reported
sampling is conducted on quarter core in
order to preserve bulk sample for
metallurgical test work.
Drilling
techniques
● Drill type (eg core, reverse circulation,
open-hole hammer, rotary air blast, auger,
Bangka, sonic, etc) and details (eg core
diameter, triple or standard tube, depth of
diamond tails, face- sampling bit or other
type, whether core is oriented and if so, by
what method, etc).
• HQ & PQ Diamond Core drilling was
conducted and results are in this
announcement
Drill sample
recovery
● Method of recording and assessing core
and chip sample recoveries and results
assessed.
● Measures taken to maximise sample
recovery and ensure representative nature
of the samples.
● Whether a relationship exists between
sample recovery and grade and whether
sample bias may have occurred due to
preferential loss/gain of fine/coarse
material.
• Diamond core recovery is recorded by
both the drilling contractors and
measured by FBM geologists
• No relationship between sample recovery
and grade has been yet observed and no
sample bias is believed to have occurred.
Logging
● Whether core and chip samples have been
geologically and geotechnically logged to a
level of detail to support appropriate
Mineral Resource estimation, mining
studies and metallurgical studies.
• Core is logged lithologically by Geologists
in the field. Logging is qualitative in
nature.
• Natural changes in mineral abundance
are recorded
oreresources.com.au 10
● Whether logging is qualitative or
quantitative in nature. Core (or costean,
channel, etc) photography.
● The total length and percentage of the
relevant intersections logged.
Sub-sampling
techniques and
sample
preparation
● If core, whether cut or sawn and whether
quarter, half or all core taken.
● If non-core, whether riffled, tube sampled,
rotary split, etc and whether sampled wet
or dry.
● For all sample types, the nature, quality
and appropriateness of the sample
preparation technique.
● Quality control procedures adopted for all
sub-sampling stages to maximise
representivity of samples.
● Measures taken to ensure that the
sampling is representative of the in-situ
material collected, including for instance
results for field duplicate/second-half
sampling.
● Whether sample sizes are appropriate to
the grain size of the material being
sampled.
● Certified reference material and blank
material are inserted every 20 samples as
per company QA/QC procedure for both
DD & RC.
● Sample weights per metre range between
1-3kg.
● Diamond core sampling will consist of cut
core with quarter core utilised for
geochemical assay.
oreresources.com.au 11
Quality of assay
data and
laboratory tests
● The nature, quality and appropriateness of
the assaying and laboratory procedures
used and whether the technique is
considered partial or total.
● For geophysical tools, spectrometers,
handheld XRF instruments, etc, the
parameters used in determining the
analysis including instrument make and
model, reading times, calibrations factors
applied and their derivation, etc.
● Nature of quality control procedures
adopted (eg standards, blanks, duplicates,
external laboratory checks) and whether
acceptable levels of accuracy (i.e. lack of
bias) and precision have been established.
● ALS Minerals, Lithium samples have been
fused with Na2O2 and digested in
hydrochloric acid, the solution is analysed
by ICP; laboratory package code ME-
MS81 ICP-AES, ME-MS91. The method is
considered a whole rock analysis.
● A stoichiometric conversion of Li to Li2O is
applied consisting of a factor 2.153.
● A stoichiometric conversion of Ta to Ta2O5
is applied consisting of a factor of 1.22.
● Certified Reference Material (CRM’s) and
quartz blank (Blanks) samples are inserted
1:20 for DD & RC and 1:30 for AC as part
of Ore’s QA/QC procedure. Accuracy and
performance of CRM’s and Blanks are
considered after results are received.
● Field duplicates collected from the Cyclone
and cone splitter are inserted every 30
samples
● Potential Fe2O3 contamination from
laboratory preparation methods was
investigated by analysing duplicate
samples via Steel crucible and Tungsten
crucible pulverization techniques. This test
work consisted of a fine crush (CRU-31),
Rotary split two portions 100g. Pulverise
one sample in tungsten crucible (PUL-33)
and one sample in steel crucible (PUL-
25e). Both samples are then assayed by
MS91-PKG.
X-Ray Diffraction
● Semi Quantitative X-Ray Diffraction was
caried out on rock chip samples by ALS
Laboratories.
● The analysis provides both a qualitative
assessment of the mineralogy and a
quantitative result.
Verification of
sampling and
assaying
● The verification of significant intersections
by either independent or alternative
company personnel.
● The use of twinned holes.
● Documentation of primary data, data entry
procedures, data verification, data storage
(physical and electronic) protocols.
● Discuss any adjustment to assay data.
• No third-party verification has been
completed to date
• Drill holes have not been twinned
• All primary paper data is held on site,
digitised data is held in a managed
database off site.
• No adjustments to assays have occurred.
Location of data
points
● Accuracy and quality of surveys used to
locate drill holes (collar and down-hole
surveys), trenches, mine workings and
other locations used in Mineral Resource
estimation.
● Specification of the grid system used.
● Quality and adequacy of topographic
control.
• Drill collars were surveyed in
GDA94/MGA Zone 51 datum by handheld
GPS +-5m accuracy
• At completion of programme drill collars
will be surveyed using a Differential GPS
+- 0.1m accuracy.
• Rock Chip samples are recorded with
handheld GPS.
oreresources.com.au 12
Data spacing and
distribution
● Data spacing for reporting of Exploration
Results.
● Whether the data spacing and distribution
is sufficient to establish the degree of
geological and grade continuity appropriate
for the Mineral Resource and Ore Reserve
estimation procedure(s) and classifications
applied.
● Whether sample compositing has been
applied.
• Drill data spacing is sufficient to establish
the degree of geological and grade
continuity appropriate for this stage of
exploration and understanding of
mineralisation
Orientation of
data in relation to
geological
structure
● Whether the orientation of sampling
achieves unbiased sampling of possible
structures and the extent to which this is
known, considering the deposit type.
● If the relationship between the drilling
orientation and the orientation of key
mineralised structures is considered to
have introduced a sampling bias, this
should be assessed and reported if
material.
• Drill holes azimuths are commonly
planned perpendicular to stratigraphic
strike where practicable.
• Drill hole dip is regarded suitable for
subvertical stratigraphy and provides a
near too true width intersection to
minimise orientation bias.
● The geometry of drill holes relative to the
mineralised zones achieves unbiased
sampling of this deposit type.
● No orientation-based sampling bias has
been identified.
Sample security
● The measures taken to ensure sample
security. • Drill samples are collected in labelled
polyweave bags and closed with tight zip
ties.
• Samples are transported within 1-2days
of hole completion by field staff directly to
ALS laboratories.
Audits or reviews
● The results of any audits or reviews of
sampling techniques and data.
● No independent audit or review has been
undertaken.
Section 2: Reporting of Exploration Results
CRITERIA EXPLANATION COMMENTARY
Mineral tenement
and land tenure
status
● Type, reference name/number, location
and ownership including agreements or
material issues with third parties such as
joint ventures, partnerships, overriding
royalties, native title interests, historical
sites, wilderness or national park and
environmental settings.
● The security of the tenure held at the
time of reporting along with any known
impediments to obtaining a licence to
operate in the area.
● The Kangaroo Hill Lithium Project
consists of 10 prospecting leases
and two Mining Lease applications.
● P15/5740, P15/5741, P15/5742,
P15/5743, P15/5749, P15/5750,
P15/5963, P15/5965, M15/1887 (in
application), M15/1905 (in application),
P15/6681 (in application), P15/6813 (in
application)
● All leases are held by Eastern
Coolgardie Goldfields Pty Ltd (ECG), a
subsidiary of Future Battery Minerals
Ltd
● Tenements P15/5741, P15/5963 and
P15/5965 overlap the Kangaroo Hills
Timber Reserve, a C class multi-
purpose reserve
● ORE operated under an approved
Conservation Management Plan within
the reserve.
oreresources.com.au 13
● No known royalties exist on the KHLP
leases.
● There are no material issues with regard
to access.
● The tenements are in good standing
and no known impediments exist.
Exploration done by
other parties
● Acknowledgment and appraisal of
exploration by other parties.
● Focus Minerals owned the project
between 2007-2020.
● Data collected by these entities has
been reviewed in detail by Ore.
Geology
● Deposit type, geological setting and style
of mineralisation.
● The Kangaroo Hills Lithium Project is
regarded as a Lithium Caesium
Tantalum (LCT) enriched pegmatite
which intrudes older Archaean aged
greenstone lithologies.
Drill hole Information
● A summary of all information material to
the understanding of the exploration
results including a tabulation of the
following information for all Material drill
holes:
● easting and northing of the drill hole
collar
● elevation or RL (Reduced Level –
elevation above sea level in metres)
of the drill hole collar
● dip and azimuth of the hole
● down hole length and interception
depth
● hole length.
● If the exclusion of this information is
justified on the basis that the information
is not Material and this exclusion does
not detract from the understanding of the
report, the Competent Person should
clearly explain why this is the case.
● Drill hole location tables has been
included in this announcement.
● Previous results have been supplied in
past cross-referenced announcements.
Data aggregation
methods
● In reporting Exploration Results,
weighting averaging techniques,
maximum and/or minimum grade
truncations (eg cutting of high grades)
and cut-off grades are usually Material
and should be stated.
● Where aggregate intercepts incorporate
short lengths of high-grade results and
longer lengths of low-grade results, the
procedure used for such aggregation
should be stated and some typical
examples of such aggregations should
be shown in detail.
● The assumptions used for any reporting
of metal equivalent values should be
clearly stated.
● Exploration Results were reported by
using the weighted average of each
sample result by its corresponding
interval length, as is industry standard
practice.
● Grades >0.3% Li2O are considered
significant for mineralisation purposes.
● A lower cut-off grade of 0.3% Li2O has
been used to report the Exploration
results. Top-cuts were deemed not
applicable.
● Metal equivalent values have not been
used.
Relationship
between
mineralisation
widths and intercept
lengths
● These relationships are particularly
important in the reporting of Exploration
Results.
● If the geometry of the mineralisation with
respect to the drill hole angle is known,
its nature should be reported.
● Drill holes are both vertical and angled
to the East and West so that
intersections are orthogonal to the
orientation of stratigraphy.
oreresources.com.au 14
● If it is not known and only the down hole
lengths are reported, there should be a
clear statement to this effect (eg ‘down
hole length, true width not known’).
Diagrams
● Appropriate maps and sections (with
scales) and tabulations of intercepts
should be included for any significant
discovery being reported These should
include, but not be limited to a plan view
of drill hole collar locations and
appropriate sectional views.
● Relevant diagrams have been included
within the announcement.
Balanced reporting
● Where comprehensive reporting of all
Exploration Results is not practicable,
representative reporting of both low and
high grades and/or widths should be
practiced to avoid misleading reporting of
Exploration Results.
● All significant intercepts have been
previously reported in cross referenced
announcements.
Other substantive
exploration data
● Other exploration data, if meaningful and
material, should be reported including
(but not limited to): geological
observations; geophysical survey results;
geochemical survey results; bulk
samples – size and method of treatment;
metallurgical test results; bulk density,
groundwater, geotechnical and rock
characteristics; potential deleterious or
contaminating substances.
● No other substantive data exists.
Further work
● The nature and scale of planned further
work (eg tests for lateral extensions or
depth extensions or large-scale step-out
drilling).
● Diagrams clearly highlighting the areas
of possible extensions, including the
main geological interpretations and
future drilling areas, provided this
information is not commercially sensitive.
● Ore is planning to conduct further
drilling at the Big Red, Miriam and
Potoroo prospects.
● Ore is completing a Scoping Study in to
a Direct Shipping Ore
● Refer to figures/diagrams in the main
body of text.
Share your feedback
Discover