ASX ANNOUNCEMENT
SINGLE-METRE ASSAYS ENHANCE HIGH-GRADE GOLD
POTENTIAL AT MIRIAM
Future Battery Minerals Ltd (ASX: FBM) (FBM or the Company) is pleased to announce the results of single-
metre samples taken during the gold-focussed Phase 1 Reverse Circulation (RC) drilling programme at its
100%-owned Miriam Project, located in the W.A. Goldfields region of Western Australia.
Highlights
Return of single metre assays from Phase 1 RC drilling further evidences the success of
FBM’s initial gold exploration strategy at Miriam.
Delivered substantial uplift (78% and 67% grade increases, respectively) in:
o Thick, high-grade mineralisation identified at Forrest in FGRC004: now 33m @ 2.80 g/t
Au from 35m, incl. 12m @ 4.39 g/t Au from 35m (previously 33m @ 1.57 g/t Au from 35m)1
.
o Key discovery intercept returned at Canyon in CYRC001: now 18m @ 0.92 g/t Au from
28m, incl. 3m @ 3.28 g/t Au from 43m (previously 20m @ 0.55 g/t Au from 28m)2.
Results assist FBM in better refining definition of key mineralised zones at both Forrest and
Canyon, which further improves targeting for upcoming programs.
Phase 2 RC drilling now complete, comprising 35 drill holes (over 3,700m) at Forrest, Forrest
South and Canyon; assay results are expected from early-mid November 2025.
Heritage surveys planned for late October to cover Burbanks Monarch, Blue Bell and
Burbanks Grand Junction ahead of planned 2026 regional exploration programs at Miriam.
Soil sampling of newly cleared heritage areas to commence in November to further advance
targets ahead of planned drilling.
FBM remains well-funded to execute all planned exploration activities through the remainder
of 2025 and beyond, with cash of A$6.4 million and zero debt (as at 30 June 2025).
FBM Managing Director and CEO, Nick Rathjen, commented:
“The exceptional results from our more detailed single metre sampling offers further validation of our gold
exploration strategy at Miriam. We now have greater confidence in the previous Phase 1 results and additional
insight to the scale of opportunity awaiting us at Forrest and Canyon. These new sampling results have
significantly upgraded several key Phase 1 intercepts, including the previous standout Forrest intercept in
FGRC004, which now sits at 33m @ 2.80 g/t Au from 35m that is a 78% increase in grade, including 12m @
4.39 g/t from 35m, as well as materially lifting the result in Canyon hole CYRC001 validating our regional target
generation model and enhances Canyon’s continued prospectivity.
“With Phase 2 drilling complete, we now await the receipt of these assay results, which are expected to be
received in batches from early-mid November. The single metre assays from Phase 1, along with the
upcoming results from our Phase 2 drilling, are set to inform the delivery of an initial MRE for Miriam . These
results will also assist in updating our geological model and refining the design of upcoming drill programs at
Miriam.”
2
info@futurebatteryminerals.com.au
+61 8 6383 7817
futurebatteryminerals.com.au
Future Battery Minerals Ltd
Suite 10, 38 Colin St, West Perth WA 6005
ABN 91 148 966 545 Follow Us
ASX: FBM
Phase 1 single-metre assay results produce outstanding intercept upgrades
In July 2025, FBM conducted its Phase 1 RC drilling programme at Miriam, designed to target gold
mineralisation at the highly prospective Forrest and Canyon prospects. During Phase 1 drilling, both 4m
composite and 1m sampling was completed, with a combination of these results subsequently announced in
September 20250F
1,1F
2.
4m composite samples were taken from areas where oxidation was too intense to visually identify potential
gold mineralisation. Following the full release of Phase 1 results from Forrest and Canyon, FBM returned to
the field to collect the corresponding 1m cyclone split samples from any 4m composites which returned a value
greater than 0.1 g/t Au.
Single-metre sampling is a superior sampling technique, as the sample is collected directly from an onboard
cyclone and cone splitter which produces a more representative sample of the 1m down hole length. The
information generated from these samples allows for more refined modelling of deposits and is key to
subsequent, detailed Mineral Resource estimation efforts.
The single-metre sample assay results have significantly upgraded several of the key intercepts reported from
both Forrest and Canyon. These key updated intercepts are highlighted below and in Table 1.
Forrest prospect
At Forrest, the increased grade and/or width of several of the key intercepts highlights the importance of the
Forrest prospect as a potential shallow, high-grade deposit to be further defined through upcoming exploration.
Key single-metre sample assay results include:
33m @ 2.80 g/t Au from 35m, including 12m @ 4.39 g/t Au from 33m (FGRC004)
Previously: 33m @ 1.57 g/t Au from 35m, including 16m @ 3.10 g/t Au from 44m
14m @ 2.08 g/t Au from 55m, including 4m @ 4.30 g/t Au from 64m (FGRC005)
Previously: 13m @ 2.21 g/t Au from 56m, including 4m @ 4.30 g/t Au from 64m
19m @ 1.79 g/t Au from 25m, including 4m @ 5.72 g/t Au from 37m (FGRC006)
Previously: 14m @ 2.29 g/t Au from 30m, including 8m @ 3.52 g/t Au from 36m
4m @ 1.28 g/t Au from 34m (FGRC010)
Previously: Not reported
Canyon prospect
The updated intercept from CYRC001 represents a clearly more significant discovery result from Phase 1
testing of this zone, which was previously a conceptual geophysical target supported by elevated gold in soils.
Key single-metre sample assay results include:
18m @ 0.92 g/t from 28m including 3m @ 3.28 g/t from 43m (CYRC001)
Previously 20m @ 0.55 g/t Au from 28m, including 4m @ 1.60 g/t Au from 40m
The improvement of results at both Forrest and Canyon further evidences the growing success of FBM’s
ongoing gold exploration strategy at Miriam.
1
Refer to FBM ASX release dated 2 September 2025, “Thick High-Grade Gold Intersected at Forrest”
2
Refer to FBM ASX release dated 15 September 2025, “Strong Regolith Gold Anomalism Identified at Canyon”
3
info@futurebatteryminerals.com.au
+61 8 6383 7817
futurebatteryminerals.com.au
Future Battery Minerals Ltd
Suite 10, 38 Colin St, West Perth WA 6005
ABN 91 148 966 545 Follow Us
ASX: FBM
Figure 1: Plan view of Forrest with new drill holes results
4
info@futurebatteryminerals.com.au
+61 8 6383 7817
futurebatteryminerals.com.au
Future Battery Minerals Ltd
Suite 10, 38 Colin St, West Perth WA 6005
ABN 91 148 966 545 Follow Us
ASX: FBM
Figure 2: Cross section of FGRC004
5
info@futurebatteryminerals.com.au
+61 8 6383 7817
futurebatteryminerals.com.au
Future Battery Minerals Ltd
Suite 10, 38 Colin St, West Perth WA 6005
ABN 91 148 966 545 Follow Us
ASX: FBM
Figure 3: Long section of Forrest gold lodes
Phase 2 drill program completed
Phase 2 RC drilling programme successfully completed at the Miriam Project. The Phase 2 programme was
expanded to 35 holes for 3,700m drilled, targeting the Forrest and Canyon prospects along with initial drilling
at Forrest South. Drilling at Forrest was targeting:
o Extension the shallow gold mineralisation identified in Phase 1 drill hole FGRC004 (33m @ 2.8 g/t
Au from 35m)2F
3 by targeting identified oxide trends to the west and north, as well as testing of fresh
rock potential in that zone; and
o Testing the continuation of the primary fresh rock lodes identified in Phase 1 drill hole FGRC003
(12m @ 1.56 g/t Au from 75m, including 1m @ 5.21 g/t Au from 85m)1, with successful delineation
of the primary lodes potentially leading to a significant increase in scale at Forrest.
At Canyon, follow-up drilling focussed on:
o Testing extension to the strong gold anomalism within regolith, including 18m @ 0.92 g/t Au from
28m3F
4 (CYRC001), identified within the Miriam Shear Zone in Phase 1.
o Targeting the important mineralised shear to the east of CYRC001 and testing deeper fresh rock
intercepts for a potential source of the strong regolith intercept.
Initial testing of Forrest South was aimed to validate the lone historical intercept of 16m @ 0.93 g/t Au from
44m (LDC007)4F
5 located over 250m south of Forrest. Successful validation of gold in regolith at Forrest South
could significantly increase the strike length potential of the shallow high-grade mineralisation at Forrest.
All samples have been submitted for assay, with preliminary results expected from early November 2025.
3
Refer to ASX release dated 2 September 2025
4
Refer to ASX release dated 15 September 2025
5
Refer to ASX release dated 27 May 2025
6
info@futurebatteryminerals.com.au
+61 8 6383 7817
futurebatteryminerals.com.au
Future Battery Minerals Ltd
Suite 10, 38 Colin St, West Perth WA 6005
ABN 91 148 966 545 Follow Us
ASX: FBM
Figure 4: Plan view of Miriam Project including Forrest, Canyon and Forrest South prospects, which were the
subject of recently completed Phase 2 drilling activities
This announcement has been authorised for release by the Board of Directors of the Company.
-END-
For further information visit www.futurebatteryminerals.com or contact:
Nicholas Rathjen Robin Cox
CEO & Managing Director Technical Director
E: nrathjen@futurebatteryminerals.com.au E: rcox@futurebatteryminerals.com.au
7
info@futurebatteryminerals.com.au
+61 8 6383 7817
futurebatteryminerals.com.au
Future Battery Minerals Ltd
Suite 10, 38 Colin St, West Perth WA 6005
ABN 91 148 966 545 Follow Us
ASX: FBM
Competent Persons Statement
The information in this announcement that relates to exploration results is based on and fairly represents information
compiled by Mr Robin Cox BSc (E.Geol), a Competent Person, who is a Member of the Australian Institute of Mining and
Metallurgy. Mr Cox is the Company’s Chief Geologist and has sufficient experience that is relevant to the style of
mineralisation and type of deposit under consideration and to the activity being undertaken to qualify as a Competent
Person as defined in the 2012 Edition of the Australasian Code for Reporting of Exploration Results, Mineral Resources
and Ore Reserves. Mr Cox consents to the inclusion in this announcement of the matters based on his information in the
form and context in which it appears.
Forward-Looking Statements
This document may include forward-looking statements. Forward-looking statements include, but are not limited to,
statements concerning Future Battery Minerals Limited’s planned exploration programme and other statements that are
not historical facts. When used in this document, the words such as “could,” “plan,” “estimate,” “expect,” “intend,” “may”,
“potential”, “should,” and similar expressions are forward-looking statements. Although Future Battery Minerals Limited
believes that its expectations reflected in these forward-looking statements are reasonable, such statements involve risks
and uncertainties, and no assurance can be given that actual results will be consistent with these forward-looking
statements.
Previously Reported Results
The information in this announcement that relates to Exploration Results is extracted from the ASX announcements
(Original Announcements), as referenced, which are available at www.futurebatteryminerals.com.au. FBM confirms that it
is not aware of any new information or data that materially affects the information included in the Original Announcements
and, that all material assumptions and technical parameters underpinning the estimates in the Original Announcements
continue to apply and have not materially changed. FBM confirms that the form and context in which the Competent
Persons’ findings are presented have not been materially modified from the original announcement.
8
info@futurebatteryminerals.com.au
+61 8 6383 7817
futurebatteryminerals.com.au
Future Battery Minerals Ltd
Suite 10, 38 Colin St, West Perth WA 6005
ABN 91 148 966 545 Follow Us
ASX: FBM
About Future Battery Minerals (ASX: FBM)
THE BUSINESS: Gold and lithium exploration and development
Future Battery Minerals (ASX: FBM) is an exploration and development company focused on rapidly advancing its
100% owned Coolgardie Gold and Lithium project in the Eastern Goldfields of Western Australia.
THE LOCATION: Infrastructure-rich project setting
The Eastern W.A. Goldfields is an outstanding location in which to
explore for, build, and operate gold and lithium mines. It is a long-
established mining province with all the accompanying benefits,
including all-year land access, skilled labour, mining services and
infrastructure.
We are positioned just 15km south of the mining hub of Coolgardie
(via sealed road), approximately 370km to the port of Esperance
and approximately 550km to Perth via road and rail. We are
proximal to multiple gold and lithium mining and processing
operations and development projects of substantial scale.
This available range of potential commercialisation options,
including standalone development, positions us well to monetise
current and future success.
THE TEAM: Proven value generators
Our carefully assembled team has an extensive track record of exploration success, project stewardship,
development expertise and operating excellence that has repeatedly resulted in the delivery of substantial
shareholder value: Nick Rathjen (MD), Robin Cox (Technical Director), Nev Power (Chairman), Rob Waugh (NED).
THE CAPACITY: Balance sheet strength and runway
We are a business and team that is resolutely focussed on the stewardship of our shareholders’ capital and the
astute application of this capital for maximal return. With a cash balance of A$6.4 million and zero debt (as at 30
June 2025), we are well-funded to undertake our planned exploration and evaluation work programs.
9
info@futurebatteryminerals.com.au
+61 8 6383 7817
futurebatteryminerals.com.au
Future Battery Minerals Ltd
Suite 10, 38 Colin St, West Perth WA 6005
ABN 91 148 966 545 Follow Us
ASX: FBM
Appendix 1 – Drill Hole Results
Table 1 – Single Metre Drill Hole Significant Intercepts >0.3g/t (Intervals are down hole length)
Hole ID From (m) To (m)
Interval
(m)
Grade
g/t
Intercept
Grade x
Metre
FGRC001
No change to
Significant Intercept
FGRC002
No change to
Significant Intercept
FGRC003
No change to
Significant Intercept
FGRC004 35 68 33 2.80 33m @ 2.80 g/t 92.4
including 35 47 12 4.37 12m @ 4.39 g/t 52.44
FGRC005 43 44 1 1.77 1m @ 1.77 g/t 1.77
46 47 1 1.08 1m @ 1.08 g/t 1.08
FGRC005 55 69 14 2.08 14m @ 2.08 g/t 29.12
including 64 68 4 4.3 4m @ 4.30 g/t 17.2
FGRC006 25 44 19 1.79 19m @ 1.79 g/t 34.01
including 37 41 4 5.72 4m @ 5.72 g/t 22.88
FGRC006 54 58 4 2.46 4m @ 2.46 g/t 9.84
FGRC006 71 79 8 0.79 8m @ 0.79 g/t 6.32
FGRC006 86 88 2 3.01 2m @ 3.01 g/t 6.02
FGRC007
No change to
Significant Intercept
FGRC008
No change to
Significant Intercept
FGRC009 41 42 1 0.37 1m @ 0.31 g/t 0.31
FGRC010 25 29 4 0.61 4m @ 0.61 g/t 2.44
FGRC010 34 38 4 1.28 4m @ 1.28 g/t 5.12
FGRC010 57 59 2 0.41 2m @ 0.41 g/t 0.82
FGRC010 71 72 1 0.34 1m @ 0.34 g/t 0.34
FGRC010 75 76 1 0.62 1m @ 0.62 g/t 0.62
FGRC010 83 84 1 0.74 1m @ 0.74 g/t 0.74
FGRC010 92 93 1 1.01 1m @ 1.01 g/t 1.01
CYRC001 28 48 18 0.92 18m @ 0.92 g/t 16.56
incl 43 46 2 3.28 3m @ 3.28 g/t 6.56
CYRC002 6 9 3 1.03 3m @ 1.03 g/t 3.09
CYRC003 34 38 4 0.31 4m @ 0.31 g/t 1.24
CYRC004 59 63 4 1.46 4m @ 1.46 g/t 5.84
CYRC005
No change to
Significant Intercept
CYRC006 64 65 1 0.53 1m @ 0.53 g/t 0.53
CYRC007 33 41 8 0.72 8m @ 0.72g/t 5.76
incl 33 36 3 1.75 3m @ 1.75 g/t 5.25
CYRC008
No change to
Significant Intercept
CYRC009
No change to
Significant Intercept
CYRC010 NSI
CYRC011 38 39 1 0.94 1m @ 0.94 g/t 0.94
10
info@futurebatteryminerals.com.au
+61 8 6383 7817
futurebatteryminerals.com.au
Future Battery Minerals Ltd
Suite 10, 38 Colin St, West Perth WA 6005
ABN 91 148 966 545 Follow Us
ASX: FBM
Table 2 – Previously reported Drill Hole Significant Intercepts >0.3g/t (Intervals are down hole length)
Hole ID From (m) To (m)
Interval
(m)
Grade
g/t
Intercept
Grade x
Metre
FGRC001 8 12 4 0.44 4m @ 0.44 g/t 1.76
FGRC001 32 61 29 1.45 29m @ 1.45 g/t 42.05
including 32 46 14 2.33 14m @ 2.33 g/t 32.62
FGRC002 38 41 3 0.89 3m @ 0.89 g/t 2.67
FGRC002 57 60 3 0.73 3m @ 0.73 g/t 2.19
FGRC002 92 96 4 0.64 4m @ 0.64 g/t 2.56
FGRC003 45 48 3 0.34 3m @ 0.34 g/t 1.02
FGRC003 75 87 12 1.56 12m @ 1.56 g/t 18.72
including 85 86 1 5.21 1m @ 5.21 g/t 5.21
FGRC003 103 105 2 0.78 2m @ 0.78 g/t 1.56
FGRC003 108 112 4 1.37 4m @ 1.37 g/t 5.48
FGRC004 35 68 33 1.57 33m @ 1.57 g/t 51.81
including 44 60 16 3.1 16m @ 3.10 g/t 49.6
FGRC004 73 76 3 1 3m @ 1.00 g/t 3
FGRC004 89 90 1 0.5 1m @ 0.50 g/t 0.5
FGRC005 43 47 4 0.74 4m @ 0.74 g/t 2.96
FGRC005 56 69 13 2.22 13m @ 2.22 g/t 28.86
including 64 68 4 4.3 4m @ 4.30 g/t 17.2
FGRC006 25 26 1 2.62 1m @ 2.62 g/t 2.62
FGRC006 30 44 14 2.29 14m @ 2.29 g/t 32.06
including 36 44 8 3.52 8m @ 3.52 g/t 28.16
FGRC006 54 58 4 2.46 4m @ 2.46 g/t 9.84
FGRC006 71 79 8 0.79 8m @ 0.79 g/t 6.32
FGRC006 84 88 4 0.96 4m @ 0.96 g/t 3.84
FGRC007 29 35 6 0.54 6m @ 0.54 g/t 3.24
FGRC007 46 55 9 2.83 9m @ 2.83 g/t 25.47
FGRC007 73 82 9 0.43 9m @ 0.43 g/t 3.87
FGRC008 81 84 3 0.86 3m @ 0.86 g/t 2.58
FGRC009 NSI
FGRC010 57 59 2 0.41 2m @ 0.41 g/t 0.82
FGRC010 71 72 1 0.34 1m @ 0.34 g/t 0.34
FGRC010 75 76 1 0.62 1m @ 0.62 g/t 0.62
FGRC010 83 84 1 0.74 1m @ 0.74 g/t 0.74
CYRC001 28 48 20 0.55 20m @ 0.55 g/t 11
incl 40 44 4 1.6 4m @ 1.60 g/t
CYRC002 4 12 8 0.67 8m @ 0.67 g/t 5.36
Incl 8 12 4 1.05 4m @ 1.05 g/t
CYRC003 36 40 4 0.24 4m @ 0.24 g/t 0.96
CYRC004 56 68 8 0.43 12m @ 0.43 g/t 3.44
CYRC005 NSI
CYRC006 64 68 4 0.51 4m @ 0.51 g/t 2.04
CYRC007 32 40 8 0.78 8m @ 0.78g/t 6.24
11
info@futurebatteryminerals.com.au
+61 8 6383 7817
futurebatteryminerals.com.au
Future Battery Minerals Ltd
Suite 10, 38 Colin St, West Perth WA 6005
ABN 91 148 966 545 Follow Us
ASX: FBM
incl 32 36 4 1.4 4m @ 1.40 g/t
CYRC008 NSI
CYRC009 NSI
CYRC010 64 68 4 0.8 4m @ 0.80 g/t 3.2
CYRC011 36 40 4 0.1 4m @ 0.10 g/t 0.4
Table 3 – Drill Hole Location Information
(UTM MGA 94 Zone 51)
Hole ID
Hole
Type
Max
Depth
Easting Northing RL Azimuth Dip
FGRC001 RC 108 319809 6562862 407 270 -60
FGRC002 RC 108 319771 6562860 405 90 -70
FGRC003 RC 114 319757 6562838 405 90 -70
FGRC004 RC 120 319772 6562927 408 270 -60
FGRC005 RC 126 319776 6562958 408 270 -60
FGRC006 RC 126 319720 6562963 406 90 -60
FGRC007 RC 102 319811 6563012 409 90 -60
FGRC008 RC 102 319855 6563011 411 90 -60
FGRC009 RC 102 319865 6563053 412 90 -60
FGRC010 RC 102 319821 6563061 411 90 -60
CYRC001 RC 84 319537 6561510 403 90 -60
CYRC002 RC 72 319483 6561519 404 90 -60
CYRC003 RC 90 319447 6561522 405 90 -60
CYRC004 RC 84 319541 6561599 404 90 -60
CYRC005 RC 72 319493 6561620 406 90 -60
CYRC006 RC 84 319494 6561644 406 285 -60
CYRC007 RC 114 319564 6561634 405 125 -60
CYRC008 RC 72 319546 6561729 404 90 -60
CYRC009 RC 78 319509 6561735 404 90 -60
CYRC010 RC 72 319435 6560939 394 90 -60
CYRC011 RC 66 319394 6560943 395 90 -60
12
info@futurebatteryminerals.com.au
+61 8 6383 7817
futurebatteryminerals.com.au
Future Battery Minerals Ltd
Suite 10, 38 Colin St, West Perth WA 6005
ABN 91 148 966 545 Follow Us
ASX: FBM
JORC Code, 2012 Edition, Table 1
Section 1: Sampling Techniques and Data
CRITERIA EXPLANATION COMMENTARY
Sampling
techniques
• Nature and quality of sampling (eg cut
channels, random chips, or specific
specialised industry standard
measurement tools appropriate to the
minerals under investigation, such as
down hole gamma sondes, or handheld
XRF instruments, etc). These examples
should not be taken as limiting the
broad meaning of sampling.
• Include reference to measures taken to
ensure sample representivity and the
appropriate calibration of any
measurement tools or systems used.
• Aspects of the determination of
mineralisation that are Material to the
Public Report. In cases where ‘industry
standard’ work has been done this
would be relatively simple (eg ‘reverse
circulation drilling was used to obtain
1m samples from which 3kg was
pulverised to produce a 30g charge for
fire assay’). In other cases more
explanation may be required, such as
where there is coarse gold that has
inherent sampling problems. Unusual
commodities or mineralisation types (eg
submarine nodules) may warrant
disclosure of detailed information.
• Reverse Circulation drilling collects a
1m bulk sample. A 2-3kg sample is
cone split from the drill rig and collected
in a pre-marked calico bag. 4m
composites samples are collected
proportionally via spear from the 1m
bulk sample. Both 1 metre and 4 metre
composites are selected for fire assay
purpose producing a 50g homogenised
split for assay. When anomalous 4m
composite samples intercepts >0.1g/t
Au are received the corresponding zone
is then sub assayed to their 1m sample.
• Certified reference material, including
known standards and blank material are
inserted at a rate of 1 in 20 for primary
samples, field duplicates are collected
at 1 in 30.
• Analysis of QA/QC results is
undertaken by the company to ensure
sampling accuracy.
• Laboratory (ALS) also perform internal
Qa/Qc sampling at a rate of 1 to 25.
Drilling
techniques
• Drill type (eg core, reverse circulation,
open-hole hammer, rotary air blast,
auger, Bangka, sonic, etc) and details
(eg core diameter, triple or standard
tube, depth of diamond tails, face-
sampling bit or other type, whether core
is oriented and if so, by what method,
etc).
• Reverse Circulation uses 5.5 inch
pneumatic hammer to pulverise
oxidised and fresh rock which is then
delivered to the cyclone and cone
splitter via compressed air.
Drill sample
recovery
• Method of recording and assessing core
and chip sample recoveries and results
assessed.
• Measures taken to maximise sample
recovery and ensure representative
nature of the samples.
• Whether a relationship exists between
sample recovery and grade and
whether sample bias may have
occurred due to preferential loss/gain of
fine/coarse material.
• All 1m samples and 4m composite
samples are weighed and recorded in
the FBM database.
• Bulk sample recovery was
measured/commented in sample logs.
• No sample bias relationship has been
identified.
Logging
• Whether core and chip samples have
been geologically and geotechnically
logged to a level of detail to support
appropriate Mineral Resource
estimation, mining studies and
metallurgical studies.
• Whether logging is qualitative or
quantitative in nature. Core (or costean,
channel, etc) photography.
• Drill holes have been geologically
logged by geologists in the field,
recording lithology, oxidation,
weathering, texture, structure and
mineralogy
• Geological data has been recorded on
FBM database. Logging is a qualitative
nature.
13
info@futurebatteryminerals.com.au
+61 8 6383 7817
futurebatteryminerals.com.au
Future Battery Minerals Ltd
Suite 10, 38 Colin St, West Perth WA 6005
ABN 91 148 966 545 Follow Us
ASX: FBM
• The total length and percentage of the
relevant intersections logged.
Sub-sampling
techniques and
sample
preparation
• If core, whether cut or sawn and
whether quarter, half or all core taken.
• If non-core, whether riffled, tube
sampled, rotary split, etc and whether
sampled wet or dry.
• For all sample types, the nature, quality
and appropriateness of the sample
preparation technique
• Quality control procedures adopted for
all sub-sampling stages to maximise
representivity of samples.
• Measures taken to ensure that the
sampling is representative of the in-situ
material collected, including for instance
results for field duplicate/second-half
sampling.
• Whether sample sizes are appropriate
to the grain size of the material being
sampled.
• Sampling of drill chips included
compositing by spear sample on 4m
composites.
• Single metre samples were cone split to
obtain an approximate 2-3kg sample.
• Certified reference material, including
known standards and blank material are
inserted at a rate of 1 in 20 for primary
samples, field duplicates are collected at
1 in 30.
• Analysis of QA/QC results is undertaken
by the company and external consultants
to ensure sampling accuracy.
• Laboratory (ALS) also perform internal
Qa/Qc sampling at a rate of 1 to 25.
Quality of assay
data and
laboratory tests
• The nature, quality and appropriateness
of the assaying and laboratory
procedures used and whether the
technique is considered partial or total.
• For geophysical tools, spectrometers,
handheld XRF instruments, etc, the
parameters used in determining the
analysis including instrument make and
model, reading times, calibrations
factors applied and their derivation, etc.
• Nature of quality control procedures
adopted (eg standards, blanks,
duplicates, external laboratory checks)
and whether acceptable levels of
accuracy (i.e. lack of bias) and precision
have been established.
• All samples were prepared and assayed
by ALS in Perth
• Samples preparation included weighing,
pulverising and splitting.
• A 50g split was then assayed via Fire
Assay and Atomic Absorption
Spectrometer under ALS code Au-AA26
• The methodology is considered an
industry standard in determining gold
grades in known gold bearing systems.
• Internal laboratory Qa/Qc processes
were conducted including the insertion of
Certified reference material, blanks and
duplicates.
• Qa/Qc results are acceptable
Verification of
sampling and
assaying
• The verification of significant
intersections by either independent or
alternative company personnel.
• The use of twinned holes.
• Documentation of primary data, data
entry procedures, data verification, data
storage (physical and electronic)
protocols.
• Discuss any adjustment to assay data.
• Significant intercepts are calculated by
database algorithm and verified by FBM
staff and Database contractors.
• All field data is imported to the FBM
geochemistry database utilising industry
data logging software LogChief. This is
uploaded sequel server database hosted
on Maxwell Geoservices proprietry
software and managed for FBM by an
external database company Mitchell
River Group Pty Ltd.
• No adjustments are made to assay data
• Gold significant intercepts are calculated
using a 0.3g/t lower cut off.
• Grade by metre calculations are a simple
multiplication of the gold grade by the
width of the intercept and this is used to
weight the significance of an intercept.
• FBM twinned selective historic drill holes
of identified lodes to determine accuracy
of historic results.
14
info@futurebatteryminerals.com.au
+61 8 6383 7817
futurebatteryminerals.com.au
Future Battery Minerals Ltd
Suite 10, 38 Colin St, West Perth WA 6005
ABN 91 148 966 545 Follow Us
ASX: FBM
Location of data
points
• Accuracy and quality of surveys used to
locate drill holes (collar and down-hole
surveys), trenches, mine workings and
other locations used in Mineral
Resource estimation.
• Specification of the grid system used.
• Quality and adequacy of topographic
control.
• Drill Holes were surveyed utilising a
Differential GPS with sub 1cm accuracy
including elevation
• All drill hole collar information has been
supplied and projected to UTM MGA 94
Zone 51
Data spacing
and distribution
• Data spacing for reporting of
Exploration Results.
• Whether the data spacing and
distribution is sufficient to establish the
degree of geological and grade
continuity appropriate for the Mineral
Resource and Ore Reserve estimation
procedure(s) and classifications
applied.
• Whether sample compositing has been
applied.
• At Forrest, holes were drilled on 30m
spacing, 60m line spacing.
• Data spacing is appropriate for identifying
continuous and non-continuous
geochemical anomalies and future
Mineral Resource estimates.
Orientation of
data in relation
to geological
structure
• Whether the orientation of sampling
achieves unbiased sampling of possible
structures and the extent to which this is
known, considering the deposit type.
• If the relationship between the drilling
orientation and the orientation of key
mineralised structures is considered to
have introduced a sampling bias, this
should be assessed and reported if
material.
• Drilling has been conducted on E-W grid
lines. Geological units in the region have
a dominantly N-S to NE-SW strike. As
such the E-W drilling provides relative
oblique interceptions.
• Drilling intercepted both oxide/supergene
mineralisation and fresh bedrock
intercepts. More drilling is required to
better determine the dip and direction of
the fresh bedrock gold mineralisation.
Sample security
• The measures taken to ensure sample
security.
• All samples are collected in the field on
the day of drilling and transported directly
to an ALS laboratory located 40km’s
away in Kalgoorlie
• Samples are delivered daily to the
Kalgoorlie ALS laboratory
• ALS transport the samples to a Perth
laboratory for analysis.
• All calico sample bags are stored within
prelabelled polly weave bags and zip tied
for transportation.
Audits or
reviews
• The results of any audits or reviews of
sampling techniques and data.
• No independent audit or review has
been undertaken.
Section 2: Reporting of Exploration Results
CRITERIA EXPLANATION COMMENTARY
Mineral tenement
and land tenure
status
• Type, reference name/number, location
and ownership including agreements or
material issues with third parties such
as joint ventures, partnerships,
overriding royalties, native title
interests, historical sites, wilderness or
national park and environmental
settings.
• The security of the tenure held at the
time of reporting along with any known
impediments to obtaining a licence to
operate in the area.
The Miriam Project consists of 5
prospecting leases.
• Granted leases are P15/6136,
P15/6137, P156138 and P15/6139.
P15/6135 remains in application
• Leases P15/6136-6139 are held by
Coolgardie Nickel Pty Ltd, now an
100% subsidiary of Future Battery
Minerals Ltd. P15/6135 is held by
Limelight Industries Pty Ltd until
time of grant
• The tenements are located in the
Kangaroo Hills Timber Rese
Share your feedback
Discover