QUARTERLY ACTIVITIES REPORT – SEPTEMBER 2024
HIGHLIGHTS
Kangaroo Hills Lithium Project (KHLP), WA (100%)
•
Phase 4B extensional drilling (19 holes for 3,109m) successfully extended Big Red a further 200m to the
north-east, where it remains shallow, thick and open; bringing Big Red’s total strike extent to over 600m.
•
Significant intercepts included 1:
•
0F
─
27m @ 1.04% Li2O from 118m, including 15m @ 1.53% Li2O from 122m (KHRC189)
─
21m @ 1.01% Li2O from 104m, including 12m @ 1.44% Li2O from 107m (KHRC190)
─
18m @ 1.03% Li2O from 100m (KHRC181)
─
17m @ 1.00% Li2O from 124m (KHRC184)
─
16m @ 1.02% Li2O from 102m (KHRC188)
─
20m @ 0.81% Li2O from 123m, incl. 14m @ 1.01% Li2O from 124m (KHRC194)
Confirmation of known Potoroo mineralised pegmatites footprint increased to over 250m (within broader
approx. 900m long mineralised strike of KHLP).
Miriam Lithium Project, WA (85%)
•
Geophysical review identified 13 new pegmatite targets across the 6-kilometre tenement strike 2. Targets
include five discrete structures that are coincident with 1.6-kilometre soil anomaly and outcropping
spodumene-bearing pegmatite.
•
Miriam lithium structures are interpreted to be analogous to the Big Red pegmatite at KHLP, located
approximately 3.5 kilometres south and which returned 31m at 1.13% Li2O3 from 86m (KHRC116).
•
Option agreement executed to acquire existing 2% Net Smelter Return (NSR) royalty over Miriam –
covering gold, lithium and all other minerals.
•
Initial soil sampling programme at Miriam completed subsequent to end of quarter with results expected
late October and POW for initial Miriam drill programme submitted 3.
1F
2F
Additional Exploration and Prospecting Lease Applications, WA (100%)
•
Substantial expansion of landholdings in the W.A. Goldfields by approximately 160% with new
applications over prospective areas in close proximity to KHLP and Miriam Lithium Projects 4, offering
excellent discovery potential for both lithium and gold mineralisation.
3F
Corporate
•
1
2
3
4
Cash balance as at 30 September 2024 of A$4.68 million and zero debt (excluding typical trade
creditors).
Refer to ASX Announcement dated 9 July 2024 – “Drilling Extends Big Red Pegmatite”
Refer to ASX Announcement dated 15 August 2024 – “New Pegmatite Targets Identified at the Miriam Lithium Project”
Refer to ASX Announcement dated 2 October 2024 – “Exploration Advances at Miriam Lithium Project”
Refer to ASX Announcement dated 5 August 2024 – “FBM Significantly Expands Footprint in the Goldfields”
Future Battery Minerals Ltd
info@futurebatteryminerals.com.au
Suite 10, 38 Colin St, West Perth WA 6005
+61 8 6383 7817
ABN 91 148 966 545
futurebatteryminerals.com.au
ASX:FBM
Follow Us
1
UPCOMING DECEMBER 2024 QUARTER PLANNED ACTIVITY
KHLP and Miriam
•
Assay results from initial soil sampling programme at Miriam expected late October 2024.
•
Ground gravity geophysical survey program at Miriam.
•
Other field activities focused on refining targets for initial Miriam drilling targeted for H1 CY2025.
Additional Exploration and Prospecting Lease Applications
•
Desktop studies and low-impact ground investigations on newly staked W.A. Goldfields tenure for further
gold and lithium potential.
NLP
•
Ongoing evaluation of potential commercialisation options.
FBM Managing Director, Nicholas Rathjen, commented:
“We concluded a highly productive September 2024 quarter which saw strong results from both KHLP and
Miriam, along with a substantial expansion of our tenure portfolio in the W.A. Goldfields and strengthened
our balance sheet through the sale of a non-core asset.
The Kangaroo Hills and Miriam areas have attractive near-surface, shallow dipping, thick, spodumene
bearing lithium pegmatites. The projects continue to hold significant upside potential for new discoveries and
resource growth, located in one of the premier mining regions in the world and proximal to existing
infrastructure including the operating hard rock lithium mine, Mount Marion.”
“The Phase 4B drilling program at KHLP during the quarter confirmed this, producing excellent results that
extended Big Red a further 200m to the north-east, growing the total known footprint to over 600m from
outcrop to the northern-most drill hole. Big Red remains open, shallow dipping, with robust thickness and
grade, whilst still at relatively shallow depths. Big Red, the newly discovered Potoroo pegmatites, continue to
offer substantial growth potential and remain our key focus for future exploration drilling at the KHLP.
“At the same time, preliminary target-generation activities at Miriam have delivered promising results, with 13
new pegmatite targets identified. This work identified five discrete structures coinciding with a significant soil
anomaly and an outcropping spodumene-bearing pegmatite increase target confidence.
“The consistency of these results to what we have previously encountered with the Big Red pegmatite at the
KHLP further validates the geological modelling and exemplifies the outstanding lithium potential at Miriam.
A wide-spaced extensional soil sampling programme was completed subsequent to quarter end, which
tested for subsurface pegmatites, particularly in the northern area of the tenure. The results of this program
are expected in late October and will be used to further refine initial priority targets for our initial drilling
programme at Miriam, which is scheduled to commence in the first half of CY2025.
“We are both pleased and excited to have expanded our footprint in the W.A. Goldfields by over 160% with
new tenement lease applications over several highly prospective areas proximate to the KHLP and Miriam.
These new areas are highly prospective for additional lithium and gold mineralisation, and their addition to
our existing regional portfolio complements and enhances our future exploration opportunities.
“While we retain a robust cash position, FBM’s forward strategy remains focused on operational optimisation
and efficiency through cost-effective field exploration activities for lithium, and gold, in Western Australia.”
Future Battery Minerals Ltd
info@futurebatteryminerals.com.au
Suite 10, 38 Colin St, West Perth WA 6005
+61 8 6383 7817
ABN 91 148 966 545
futurebatteryminerals.com.au
ASX: FBM
Follow Us
2
For the period ending 30 September 2024
Future Battery Minerals Limited (ASX: FBM) (FBM or the Company) is pleased to provide the following
report on its activities during the September 2024 quarter. The Company’s primary focus during the reporting
period was progressing exploration and evaluation activities at its Kangaroo Hills Lithium Project (KHLP)
(100%) and Miriam Lithium Project (Miriam) (85%) in Western Australia, and Nevada Lithium Project (NLP)
(80%) in Nevada, USA.
LITHIUM PROJECTS: WESTERN AUSTRALIA
Kangaroo Hills Lithium Project (KHLP)
During the quarter, FBM continued to advance exploration activities at KHLP, with particular focus on testing
the northern extension of Big Red.
Figure 1. Updated Project Plan View
Future Battery Minerals Ltd
info@futurebatteryminerals.com.au
Suite 10, 38 Colin St, West Perth WA 6005
+61 8 6383 7817
ABN 91 148 966 545
futurebatteryminerals.com.au
ASX: FBM
Follow Us
3
Phase 4B drilling program
Building on the successful step-out drilling of Big Red during Phase 4A, FBM announced on 29 May 2024
that it had commenced the Phase 4B drill program at KHLP. The key objective of the Phase 4B program at
the KHLP was to test for further northern extensions of the Big Red pegmatite, particularly the updated
interpretation of a north-north-easterly dip/plunge direction. Drilling was completed by mid-June, comprising
19 holes for 3,109m. On the 9 July 2024 all the Phase 4B results were announced (see key results in Figure
2 and 3).
Further extension to the Big Red and Potoroo pegmatites
The drilling successfully extended the shallow, thick, high-grade Big Red pegmatite by a further 200m to the
north-east taking Big Red’s footprint to over 600m (from pegmatite outcrop to northern most drill hole
intercept KHRC194), with this system remaining open, thick and at relatively shallow depth.
Importantly, the overall dip of the Big Red pegmatite appears to be shallowing to the north, averaging closer
to -20° around KHRC194. This results in the intercept in KHRC194 being at a vertical depth of around only
100m, i.e. still relatively shallow, and with the pegmatite remaining thick, well-mineralised and still open to
the north (with a dip/plunge observed at approx. 015°).
Figure 2. Plan View KHLP – Phase 4B Drilling Results
While not specifically targeted as part of the Phase 4B program, the Potoroo pegmatite was intercepted
within KHRC193, returning 10m @ 0.93% Li2O from 91m, including 5m @ 1.19% Li2O 5, piercing the
pegmatite approximately 80m south of KHRC178.
4F
5
Refer to ASX Announcement dated 9 July 2024 – “Drilling Extends Big Red Pegmatite”
Future Battery Minerals Ltd
info@futurebatteryminerals.com.au
Suite 10, 38 Colin St, West Perth WA 6005
+61 8 6383 7817
ABN 91 148 966 545
futurebatteryminerals.com.au
ASX: FBM
Follow Us
4
This result suggests potential thickening, and increasing of grade, to the north where the Potoroo pegmatite
remains open. The combination of the Phase 4A and 4B drill programs delineates the known footprint of
Potoroo to over 250m.
Figure 3. Phase 4B KHLP schematic long section
Additional pegmatite discovery
Scissor drilling directed to the east in Phase 4B (drill holes KHRC180 and KHRC196) intercepted a thick
pegmatite unit up to 36m (KHRC196) down hole thickness named Big Red East.
This pegmatite is discontinuous to Big Red, however the presence of this thick pegmatite near known
mineralised pegmatites means it remains highly prospective, delivering the potential for additional discovery.
KHRC196 hosts a low-level Li anomalism with a peak assay of 0.27% Li2O from 102m (down hole). While
low grade and below the 0.3% 6 cut off for reportable significant intercepts, this result suggests that economic
levels of lithium mineralisation may potentially further develop at untested locations within this pegmatite.
5F
Next steps at KHLP
Prior to testing for further extensions of Big Red to the north, and in refinement of prospective regional
targets at the KHLP, the geological team is conducting detailed modelling of the various mineralised and
unmineralized pegmatite systems discovered to date at the KHLP. This work takes into consideration all
drilling and mapping completed to date, building out detailed geochemical and geophysical signatures of the
various pegmatites, including regional targets. It is designed to further refine and derisk the planned future
drilling of regional prospects at the KHLP.
6
Refer to ASX Announcement dated 9 July 2024 – “Drilling Extends Big Red Pegmatite”
Future Battery Minerals Ltd
info@futurebatteryminerals.com.au
Suite 10, 38 Colin St, West Perth WA 6005
+61 8 6383 7817
ABN 91 148 966 545
futurebatteryminerals.com.au
ASX: FBM
Follow Us
5
Miriam Lithium Project
Miriam covers an area of approximately 6.0 km by 1.5 km and comprises four granted Prospecting Licences
(PL) (P15/6136 to P15/6139 inclusive) and one PL application (P15/6135). It is located approximately 10
kilometres south-southwest of Coolgardie and immediately north and contiguous to KHLP.
FBM’s strategic acquisition of an 85% interest in the Miriam Project was completed in May 2024, expanding
its regional position to the north of the KHLP. Historic rock chip sampling on the tenement had returned up to
1.85% Li2O, with further rock-chip sampling of the original reported spodumene-bearing outcrop returning
2.0% Li2O 7.
6F
A subsequent detailed geochemical soil sampling programme revealed a primary lithium target of
approximately 1.6 kilometres in strike length, along with a second trend spanning approximately 600 metres,
linking the main pegmatite trend. This large lithium soil anomaly, extending from the weathered (depleted)
outcrop of spodumene-rich pegmatite, indicates the potential for additional spodumene-bearing pegmatites
under the surface cover.
New pegmatite targets identified
In May 2024, Southern Geoscience was engaged to undertake a detailed review and reinterpretation of the
existing airborne magnetic and radiometric data over the Miriam Project. The review has facilitated the
development of a new litho-magnetic interpretation of bedrock geology at a detailed 1:10,000 scale.
The review has identified 13 discrete targets characterised by significant east-west structures that intersect
the underlying greenstone lithologies. These structures are analogous to the Big Red pegmatite at KHLP,
located approximately 2 kilometres south, and are associated with coincident resistivity and gravity low
anomalies. Notably, five of these structures have aligned with a 1.6 kilometre north-south strike soil anomaly
and outcropping spodumene-bearing pegmatite, indicating the potential for an extensive shallow pegmatite
system at the southern end of Miriam.
7
Refer to ASX Announcement dated 23 April 2024 – “Key target generation advancing at Miriam Lithium Project”
Future Battery Minerals Ltd
info@futurebatteryminerals.com.au
Suite 10, 38 Colin St, West Perth WA 6005
+61 8 6383 7817
ABN 91 148 966 545
futurebatteryminerals.com.au
ASX: FBM
Follow Us
6
Figure 4. Miriam reinterpreted geology and target areas
The presence of these host structures in the northern part of the project area has indicated further
exploration potential, particularly in regions with limited geochemical data. The geophysical review involved
reprocessing existing public-domain airborne magnetic and radiometric data (with a 50 metre spacing),
identifying demagnetisation or breaks in the serpentinised basalt and ultra-mafic lithologies where
pegmatites characterised by a lower magnetic response may have intruded. This approach has proven
successful in the KHLP project and has the potential to yield similar results at Miriam.
Future Battery Minerals Ltd
info@futurebatteryminerals.com.au
Suite 10, 38 Colin St, West Perth WA 6005
+61 8 6383 7817
ABN 91 148 966 545
futurebatteryminerals.com.au
ASX: FBM
Follow Us
7
Figure 5. Miriam Project magnetics with soil targets and high-grade rock chip sample results
Future Battery Minerals Ltd
info@futurebatteryminerals.com.au
Suite 10, 38 Colin St, West Perth WA 6005
+61 8 6383 7817
ABN 91 148 966 545
futurebatteryminerals.com.au
ASX: FBM
Follow Us
8
Next steps at Miriam
Extensional soil sampling completed
Previous soil sampling activities undertaken at Miriam were limited to only 2.6 km (north-south) of the
approximate 6 km tenure extent.
Subsequent to the end of quarter, a wide-spaced extensional soil sampling programme was completed to
test for potential subsurface pegmatites, extending into the northern area of the tenure, which had been
cleared by previous heritage surveys. Over 400 samples were collected during September, with assays
results from this programme expected by late October.
Soil sampling is considered as a low cost and fast method for defining broad geochemical anomalies,
facilitating immediate drill testing or further target refinement. This technique is particularly effective in
terrains such as the neighbouring KHLP and Miriam, where substantial in-situ regolith exists and there is
minimal to-no transported alluvium, resulting in more reliable surface geochemical datasets.
The results of the soil sampling programme will be used to guide the planned geophysical surveys and
drilling programs, allowing for effective allocation of survey costs and target refinement.
Following the receipt of assay results from the soil sampling, FBM has scheduled targeted ground gravity
geophysical surveys to commence at Miriam. The ground gravity survey will improve drill hole planning,
further mitigating exploration risks. The survey is scheduled to commence after the soil sampling programme
results are received and is expected to be completed in the December 2024 quarter.
POW submitted; initial drilling on track for H1 2025
The Program of Work (POW) for the initial drill programme at Miriam has been submitted in preparation for
Miriam’s initial drill program commencing H1 2025. The initial drill program is targeting the 1.5km soil
anomaly target that correlates with both spodumene outcrops and recent geophysical targets. The proposed
initial RC drilling program will test this high priority target providing key information on the thickness and
orientation of the mineralised system, paving the way for future targeted programmes which will accurately
delineate the expanding system.
Option agreement executed to acquire existing NSR
Post the quarter end, FBM executed an option agreement to acquire the existing 2% Net Smelter Return
(NSR) royalty over Miriam, which covers all mineral rights and products. In exchange for an option fee of
A$60,000, the agreement grants FBM a 12-month period to exercise the option to acquire the NSR royalty
through an additional payment of A$65,000.
Expansion of landholdings in W.A. Goldfields
During the quarter, FBM staked and submitted applications to the Department of Energy, Mines, Industry
Regulation and Safety (DEMIRS) for two (2) Exploration Leases and five (5) Prospecting Leases totalling
approximately 65km2. The ground covered by these applications is considered highly prospective for both
lithium and gold mineralisation and is located near the KHLP and Miriam (refer Figure 6). These applications
significantly expand FBM’s landholding in the W.A. Goldfields region by approximately 160%, enhancing the
existing footprint of the KHLP and Miriam (approx. 19km2).
Future Battery Minerals Ltd
info@futurebatteryminerals.com.au
Suite 10, 38 Colin St, West Perth WA 6005
+61 8 6383 7817
ABN 91 148 966 545
futurebatteryminerals.com.au
ASX: FBM
Follow Us
9
Figure 6. New FBM tenure applications in the W.A. Goldfields region
All tenure overlies Archean Greenstone lithologies of the Eastern Goldfields Super Terrane and is
considered highly prospective for LCT pegmatites and gold mineralisation (refer Figure 6). The ground has
been applied for following ongoing technical investigations into LCT pegmatite potential across the broader
W.A. Goldfields region.
FBM has progressed third party objections to the new tenure applications and is currently negotiating
Heritage Protection Agreements (HPA) with relevant native title parties. The granting of the tenure is
expected upon the completion of the relevant HPAs.
Expansion of Kangaroo Hills Footprint
Three separate project-scale land parcels have been staked and include the newly named Kangaroo Hills
West and Kangaroo Hills North Projects, along with the Kalgoorlie North Project. Additionally, two
applications, P15/6813 and P15/6681, are contiguous to the KHLP, enhancing the prospectivity for LCT
pegmatites and expanding the landholding for optimal future development of the Kangaroo Hills lithium
Future Battery Minerals Ltd
info@futurebatteryminerals.com.au
Suite 10, 38 Colin St, West Perth WA 6005
+61 8 6383 7817
ABN 91 148 966 545
futurebatteryminerals.com.au
ASX: FBM
Follow Us
10
system. This brings FBM’s total landholding in the Kangaroo Hills region to 56.7km2, providing further
exploration potential.
The KHLP North Project overlies an extension of the same greenstone unit which hosts the KHLP and
Miriam spodumene bearing pegmatites. The tenement is situated approximately 4km northwest of Miriam
and is easily accessible via the Great Eastern Highway. Previous tenement holders identified a 4km +80ppm
Li anomaly in soil samples, which remains untested. This Li anomaly coincides with the underlying
greenstone lithologies, and only one pegmatite outcrop has been located in the area. FBM recognises similar
characteristics to the KHLP and Miriam LCT pegmatites, highlighting this region as a high priority target
when granted.
The KHLP West Project is located approximately 6km directly east of the Big Red pegmatite at KHLP. The
area has been subject to limited historic exploration work, however, a wide-spaced drilling programme
conducted by Jervois Mining Ltd in 2008 intercepted lithologies logged as pegmatite in one drill hole located
within the current application area. Although LCT elements were not assayed, FBM plans to initiate work to
identify the LCT potential of pegmatites in this region. This work will include mapping and surface sampling
to assist in future drill hole targeting. While there are no known gold occurrences exist within the application
area, it is in close proximity to the historic Gibraltar and Gibraltar East historic gold mines and lies on the
same underlying greenstone unit as the Bullabulling Gold Mine (3.2Moz), operated by Norton Goldfields Pty
Ltd. FBM plans to further evaluate the ground for potential gold mineralisation alongside the LCT pegmatite
exploration.
Figure 7. Kangaroo Hills Tenure Location
Future Battery Minerals Ltd
info@futurebatteryminerals.com.au
Suite 10, 38 Colin St, West Perth WA 6005
+61 8 6383 7817
ABN 91 148 966 545
futurebatteryminerals.com.au
ASX: FBM
Follow Us
11
Broader Goldfields Region
The Kalgoorlie North Project consists of one exploration lease application totalling an area of 27.9km2,
located 45km northeast of Kalgoorlie. The north Kalgoorlie region is home to numerous operating and
historic gold mines, including Kanowna Belle, which is currently operated by Northern Star Resources Ltd
and has produced 5.4Moz gold since 1993. Smaller operations, such as the Gordon Sirdar mine, operated
by FMR Investment Pty Ltd, are located only 11km to the south. The tenement is well accessed by roads
leading to these operations, as well as by numerous station and exploration tracks.
Figure 8.KHLP North Li Soil Anomaly
The tenure has been inadequately tested for both gold and LCT pegmatites. The underlying geology consists
of Archean greenstone lithologies, flanked to the north by granite, suggesting potential for LCT pegmatite
occurrences given the presence of suitable host geology and granitic source rock. In addition, FBM has
identified numerous +10ppb gold soil anomalies in historic vacuum sampling data that appear to have never
been properly followed up. Upon the grant of the tenure, FBM aims to further investigate these soil
anomalies and conduct mapping and surface sampling to define lithium and gold drill targets.
Future Battery Minerals Ltd
info@futurebatteryminerals.com.au
Suite 10, 38 Colin St, West Perth WA 6005
+61 8 6383 7817
ABN 91 148 966 545
futurebatteryminerals.com.au
ASX: FBM
Follow Us
12
Gold prospectivity on existing tenure
FBM notes that much of its existing land holding is also prospective for gold mineralisation, given its location
over favourable geology and structural settings. Since 2019, the Company has been focused on the
exploration and advancement of its lithium and nickel projects in Western Australia and Nevada. FBM now
has a significant landholding in both W.A. and Nevada, overlying geology that is prospective for precious
metal mineralisation. As such, the Company also plans to initiate a gold and multi-commodity review of its
broader project portfolio, including its South Australian assets.
Next steps and field exploration activities across broader W.A. Goldfields tenure
Subsequent to the end of quarter, FBM advised that it has continued to assess KHLP West, KHLP North and
Kalgoorlie North Projects through both targeted desktop studies and low-impact ground investigations.
These activities include ground truthing exploration consisting of mapping and rock chip sampling, which
remains underway. The tenure is being progressed to approval through negotiations with stakeholders and
relevant Native Title Parties (NTP).
LITHIUM PROJECTS: NEVADA, USA
Nevada Lithium Project (NLP) (80%)
The NLP comprises over 65km2 of tenure that is highly prospective for larger sedimentary-hosted lithium
deposits. Albemarle Corporation’s (NYSE: ALB) Silver Peak Lithium Mine, currently the only producing
lithium mine in North America, lies approximately 45 km to the west of the NLP (refer Figure 10).
The NLP is located approximately 12 km from the historic mining hub of Tonopah, Nevada, and is easily
accessible year-round via State Route 95. It is situated within a premier global mining district, that is home to
other advanced lithium claystone projects such as Rhyolite Ridge (Ioneer) and Thacker Pass (Lithium
Americas). In addition, it is close proximity to other major lithium claystone deposits, including TLC
(American Lithium), Tonopah Flats (American Battery Technology Company) and Horizon (Pan American
Energy) (refer Figure 9).
Further exploration potential and broader commercialisation pathway
While the NLP already host a large-scale defined Mineral Resource (1.5 Bt @ 783 ppm Li for 6.2 Mt LCE 8), it
still hosts significant exploration upside for resource extension at Lone Mountain, while regional prospect –
Traction remains untested. The Traction prospect is located within the same lacustrine and caldera settings
which host the Lone Mountain lithium claystone and neighbouring deposits, Tonopah Flats and TLC.
7F
During the quarter, FBM made the payment for the renewal and maintenance fees of the NLP claims. At this
time, FBM elected to relinquish the San Antone prospect claims, as prior exploration results did not warrant
further work.
FBM believes the NLP holds significant value, given the size and quality of lithium claystone deposition. Its
location in a proven mining and development region, and within the U.S., a nation increasingly determined to
deliver itself home-grown security of critical raw material supply, makes the NLP a significant discovery.
Given its already impressive scale and tenor, FBM is currently evaluating a range of commercialisation
options available to the NLP, to ensure the optimal outcome for FBM shareholders.
8
Refer to ASX Announcement dated 15 April 2024 – “Outstanding Maiden Mineral Resource Estimate for 80% owned Nevada Lithium Project”
Future Battery Minerals Ltd
info@futurebatteryminerals.com.au
Suite 10, 38 Colin St, West Perth WA 6005
+61 8 6383 7817
ABN 91 148 966 545
futurebatteryminerals.com.au
ASX: FBM
Follow Us
13
Figure 9.NLP location map including neighbouring deposits
NICKEL PROJECTS: WESTERN AUSTRALIA
Saints Nickel Project (Saints) (100%), Leinster Nickel Project (Leinster) (100%)
There was no significant work completed at the Saints or Leinster Nickel Project during the quarter.
Future Battery Minerals Ltd
info@futurebatteryminerals.com.au
Suite 10, 38 Colin St, West Perth WA 6005
+61 8 6383 7817
ABN 91 148 966 545
futurebatteryminerals.com.au
ASX: FBM
Follow Us
14
CORPORATE
Nepean Nickel Project sale
On 18 September 2024, the Company agreed to revise the deferred consideration amounts payable by
Rocktivity to Eastern Coolgardie Goldfields Pty Ltd (ECG), a wholly owned subsidiary of FBM, from A$7.2
million to approximately A$1.04 million as follows:
• A$265,000 received on 18 June 2024; and
• A$773,656 to be paid on or before 25 September 2024.
Rocktivity also agreed to:
• grant ECG a 1% net smelter royalty on all minerals and metals produced and sold or otherwise
disposed of for value on the Nepean Nickel Project tenements (FBM NSR); and
• pay an additional A$500,000 to ECG, subject to the satisfaction of any of the following milestones
(Contingent Payment):
Rocktivity and/or Rocktivity Mining completing the sale of all, or part of, the Nepean Nickel
Project tenements for consideration of more than A$5,000,000 (whether in cash, shares or any
other forms of consideration); or
Rocktivity delineating a mineral resource of more than 300,000 ounces of gold in respect to all or
part of the Nepean Nickel Project tenements.
FBM received Rocktivity’s final deferred payment of A$773,656 on 24 September 2024 and advised that
there will be no further cash payments under the Tenement Sale Agreement.
Cashflows for the quarter
Attached to this report is the Appendix 5B containing the Company’s cashflow statement for the September
2024 quarter. The cash outflows for the Quarter included A$1.06 million incurred on exploration and
evaluation expenditure, which was primarily associated with the costs relating to the geological and mining
studies, and drilling programs, at KHLP, Miriam and NLP. There were A$194,000 of administration and
corporate costs paid during the quarter, and as disclosed on section 6 of Appendix 5B, A$147,000 of
payments were made to related parties, including the Directors and their associates pursuant to existing
director fee agreements for Executive and Non-Executive Directors.
As at 30 September 2024, the Company had available cash of approximately A$4.68 million and zero debt
(excluding typical trade creditors).
Capital structure
Securities on Issue as at 30 September 2024:
• 665,355,928 fully paid ordinary shares (quoted)
• 3,000,000 options exercisable at A$0.15 on or before 28/11/2026
• 2,000,000 options exercisable at A$0.11 on or before 03/02/2028
• 3,000,000 options exercisable at A$0.072 on or before 22/02/2025
• 1,250,000 options exercisable at A$0.50 on or before 10/08/2026
• 5,000,000 options exercisable at A$0.14 on or before 24/05/2029
• 5,000,000 options exercisable at A$0.10 on or before 24/05/2029
• 5,000,000 options exercisable at A$0.18 on or before 24/05/2029
• 191,973,173 Performance Rights (various classes)
Future Battery Minerals Ltd
info@futurebatteryminerals.com.au
Suite 10, 38 Colin St, West Perth WA 6005
+61 8 6383 7817
ABN 91 148 966 545
futurebatteryminerals.com.au
ASX: FBM
Follow Us
15
SEPTEMBER 2024 QUARTER: ASX ANNOUNCEMENTS
This Quarterly Activities Report contains information extracted from ASX market announcements reported in
accordance with the 2012 edition of the “Australasian Code for Reporting of Exploratio
Share your feedback
Discover