Half Year Financial Report 31 December 2025
Released
Released
Announcement PDF
ACN 148 966 545
AND ITS CONTROLLED ENTITIES
(Previously Future Battery Minerals Limited)
INTERIM FINANCIAL REPORT
For the half year ended 31 December 2025
ORE RESOURCES LIMITED: INTERIM FINANCIAL REPORT − 31 DECEMBER 2025 2
CONTENTS
Directors’ Report 3
Auditor’s Independence Declaration 23
Consolidated Statement of Profit or Loss and Other Comprehensive Income 24
Consolidated Statement of Financial Position 25
Consolidated Statement of Changes In Equity 26
Consolidated Statement of Cash Flows 28
Notes to the Consolidated Financial Statements 29
Director’s Declaration 38
Independent Auditor’s Review Report 39
ORE RESOURCES LIMITED: INTERIM FINANCIAL REPORT − 31 DECEMBER 2025 3
DIRECTORS’ REPORT
Your Directors present their half-yearly report on the consolidated entity consisting of Ore Resources
Limited (“OR3” or “the Company”) (previously Future Battery Minerals Ltd) and the entities it controlled at
the end of, or during, the period 1 July 2025 to 31 December 2025 (“the Group”).
Directors
The persons who were Directors of Ore Resources Limited during the interim reporting period and up to
the date of this report are:
NAME POSITION APPOINTMENT/RESIGNATION
Mr Neville Power Non-Executive Chairman Appointed on 20 November 2023
Mr Nicholas Rathjen Chief Executive Officer
Managing Director
Appointed on 18 October 2023
Mr Robin Cox Technical Director Appointed on 1 January 2023
Mr Robert Waugh Non-Executive Director Appointed on 25 June 2024
Chief Financial Officer and Joint Company Secretary
Mrs Silfia Morton appointed as Chief Financial Officer in May 2022, and appointed as Company Secretary
on 1 December 2022.
Review of Operations
During the half year period, OR3 accelerated exploration at the Miriam Gold Project and Coolgardie
Lithium Projects.
The Group’s operating loss for the period ended 31 December 2025 was $2,645,581 (2024: profit of
$183,735).
COOLGARDIE GOLD PROJECTS, WESTERN AUSTRALIA
Ore’s Coolgardie Gold Projects represent more than 75km2
of prospective gold exploration tenure located
in a world-class geological and operating region. Ore’s activities during the period have focused on
exploration programmes at the Miriam and Burbanks East Gold Projects. Most notably, the Company has
completed three RC drilling programmes at Miriam, delivering significant gold exploration success.
Miriam Gold Project (100%)
The Miriam tenure covers a region of the Coolgardie Greenstone Belt overlying a suite of mafic and
ultramafic units along with felsic intrusives. Miriam overlies formations and structural trends that host
multiple nearby gold deposits, including Horizon Minerals’ Burbanks (466 koz @ 2.4 g/t Au), Beacon
Minerals’ McPhersons Reward (132 koz @ 1.2 g/t Au) and Focus Minerals’ Coolgardie Operations (2.7 Moz
@ 1.8 g/t Au).0F
1
Any future gold discoveries at Miriam are set to benefit from exceptional commercialisation optionality with
several operating gold mills in close proximity to the area. The Burbanks Mine, which is located only 1 km
north of the Miriam tenure, contains a mill and processing plant owned by Auric Mining. The Greenfields
Mill, owned and operated by FMR Investments, and the Three Mile Hill Mill, owned and operated by Focus
Minerals, are approximately 16 kilometres by a sealed road to the north-east.
Phase 1 RC Drilling Programme
In July 2025, Ore conducted a gold-focused RC drilling programme at Miriam. The programme consisted
of twenty-one (21) holes for approximately 1,900m drilled and was designed to target gold mineralisation
at the highly prospective Forrest and Canyon prospects.
Phase 1 delivered numerous thick, high-grade gold intercepts returned at Forrest within shallow oxidised
areas, including significant extensional outcomes to known historical gold zones. The best result from the
1 Refer to Horizon Minerals Reserves & Resources, Beacon Minerals ASX announcement dated 6th November 2024 and Focus Minerals ASX
Announcement dated 1st December 2023
ORE RESOURCES LIMITED: INTERIM FINANCIAL REPORT − 31 DECEMBER 2025 4
Phase 1 drilling at the Forrest prospect was from hole FGRC004, which returned a thick gold intercept of
33m @ 2.80 g/t Au from 35m downhole (4m composite sample: 33m @ 1.57 g/t Au from 35m).
Phase 1 drilling at Canyon consisted of 11 holes for approximately 800m, targeting specific geophysical
zones within the large 1.75 km target defined by both elevated gold in surface soil samples and geophysical
anomalies.
Nine (9) of the holes targeted a portion of an interpreted shear zone located approximately 1.5 km south
of the Forrest prospect. The 9 holes tested a strike length of 200m of the interpreted shear where magnetic
features had a high coincidence to the Forrest magnetic signature. The shear zone was successfully located
and intercepted within three (3) holes, CYRC001, CYRC004 and CYRC007. Notably, all 3 holes were drilled
on the eastern most boundary of their respective fence lines and all resulted in anomalous gold intercepts
within upper oxide zones.
Single-Metre Re-Assaying Results
Following the full release of Phase 1 results from Forrest and Canyon, Ore returned to the field to collect
the corresponding 1m cyclone split samples from any 4m composites which returned a value greater than
0.1 g/t Au. These single-metre sample assay results significantly upgraded several of the key Phase 1
intercepts reported from both Forrest and Canyon. For full details, refer to ASX release dated 15 October
2025.
Figure 1: Location Map – Coolgardie Gold Projects
ORE RESOURCES LIMITED: INTERIM FINANCIAL REPORT − 31 DECEMBER 2025 5
Figure 2: Miriam Project – Plan View (recently acquired M15/11 tenement in yellow)
Phase 2 RC Drilling Programme
The Phase 2 RC drilling programme was completed at Miriam in October 2025, consisting of 35 holes for
over 3,700m. The Phase 2 programme was designed to rapidly follow up the substantial exploration
success achieved during the Phase 1 programme at the Forrest and Canyon prospects.
Phase 2 drilling at Forrest had dual aims. The first objective was further extending the shallow oxide gold
lodes identified during the Phase 1 programme. This included a follow-up to hole FGRC004 (Phase 1),
which intercepted 33m @ 2.80 g/t Au from 35m. The second objective was to further evaluate and extend
the fresh rock gold lode identified in hole FGRC003 (Phase 1), which returned 12m @ 1.56 g/t Au from
75m.
Significantly, all three fence lines of drilling to the south intercepted gold mineralisation, suggesting the
presence of a stacked, multi-lode gold system consisting of sub-vertical thick high-grade gold lodes
remaining open to the southwest and northeast along strike and at depth.
Hole FGRC024, an immediate southern step-out drill hole from FGRC003, achieved 25m @ 3.28 g/t Au
from 119m including a high-grade zone of 6m @ 10.76 g/t Au from 131m down hole (Figure 3).
Importantly, this intercept was mineralised to end of hole, indicating that the Forrest system remains open
at depth and up dip with significant grade and thickness potential remaining to be tested.
ORE RESOURCES LIMITED: INTERIM FINANCIAL REPORT − 31 DECEMBER 2025 6
Drilling in this area also achieved the single best intercept at Miriam by gram-metres, with hole
FGRC027 returning 12m @ 12.18 g/t Au from 48m which intercepted a mineralised shear within
transitional and fresh rock. This intercept represents a new thick high-grade primary lode which is open
up dip and at depth and along strike north-south (N-S).
The Phase 2 programme also confirmed a fertile mineralised system at Canyon, with further down-dip gold
intercepts achieved within both regolith and fresh rock lithologies. The results highlight a steep dipping
mineralised system identified in three fence lines over 120m, which remains open to the north.
Phase 3 RC Drilling Programme
The Phase 3 RC drilling programme was designed to further evaluate and expand on the highly
encouraging results returned from both the Phase 1 and Phase 2 programmes. Phase 3 drilling was
completed in December 2025, comprising 16 holes for approximately 3,000m drilled.
All Phase 3 assay results were received post end of the reporting period on 21 January 2026, returning
outstanding new gold intercepts and extending mineralisation at Forrest to over 850m in strike length.
Figure 3: Forrest Prospect – Plan View with drill hole locations
ORE RESOURCES LIMITED: INTERIM FINANCIAL REPORT − 31 DECEMBER 2025 7
Figure 4: Forrest Prospect – Schematic Long Section
The stand-out Phase 3 result was returned from hole FGRC047, which successfully produced down-dip
mineralised extensions to two Phase 2 drill holes at FGRC024 and FGRC025 (Figure 5). Hole FGRC047
delivered an extension of more than 50m to the lode in hole FGRC024, returning 20m @ 2.27 g/t Au from
183m, and extended the lode in hole FGRC025 by more than 90m, returning 12m @ 1.23g/t Au from 119m.
The final line in this Phase 3 grid drilling delivered a significant strike extension of over 100m in fresh rock,
with drill holes FGRC043 and FGRC046 intercepting 18m @ 2.25 g/t Au from 66m and 10m @ 2.17 g/t Au
from 124m, respectively. These results confirmed continued strike continuity, indicating that the Forrest
gold system remains open to the south.
Significant gold prospectivity identified in key Miriam regional prospects
At Miriam, Ore is progressing several underexplored regional prospects towards drill ready status. Heritage
surveys were completed in August 2025 and November 2025, clearing the Forrest South, Jungle, Goroke,
Burbanks Monarch, Blue Bell, and Burbanks Grand Junction West prospects.
Following completion of heritage surveys covering the northern tenements at Miriam in November 2025,
Ore conducted a geochemical soil sampling programme covering a section of the Miriam Shear extending
from Forrest to Burbanks Monarch.
The November 2025 soil sampling programme was specifically designed to build on the June 2025 grid
and further enhance confidence in the emerging geochemical trends at Miriam. This programme infilled
the previous grid to 40-metre station spacing and 100-metre line spacing.
A total of more than 350 UFF soil samples were collected across the Miriam Shear Zone during the
November 2025 programme, concentrating on the highly prospective Forrest South – Burbanks Monarch
corridor.
ORE RESOURCES LIMITED: INTERIM FINANCIAL REPORT − 31 DECEMBER 2025 8
Figure 5: Forrest Cross Section – Hole FGRC047 (high-grade down-dip extension)
The November 2025 soil sampling programme successfully defined seven (7) targets where continuous
+50ppb Au results are apparent and coincident with the previously identified prospects at Forrest South,
Forrest North and Burbanks Monarch.
These targets sit within a broad 2km long +20ppb gold-in-soils anomaly along the broader Miriam
Shear.
Several high-order anomalies, which measure up to 850m in length, are also coincident with apparent
breaks or faults within the Miriam Shear Zone and may represent key structures for economic gold
deposition.
Additional geochemical sampling has subsequently been completed on targets located off or adjacent to
the Miriam Shear, including the Goroke prospect. An additional 250 samples were collected in January
2026 to advance early-stage work, including on this emerging target. The results from this sampling are
expected to be received in early March 2026.
ORE RESOURCES LIMITED: INTERIM FINANCIAL REPORT − 31 DECEMBER 2025 9
Figure 6: Forrest South – Burbanks Monarch trend highlighting seven +50ppb Au targets
Further consolidation of the Miriam tenure
On 6 February 2026, Ore announced the acquisition of the M15/11 mining lease, consisting of a 9.7ha area
located within the Miriam Project. The tenure sits within the 1.7km long anomaly representing Canyon and
runs along strike south of the Company’s previous drilling locations at Canyon (Figure 2).
The material terms of the tenement acquisition agreement are as follows:
• Parties: Coolgardie Nickel Pty Ltd (100% subsidiary of Ore) as purchaser; and Mr George Main as
vendor.
• Asset: 100% acquisition of the legal and beneficial interest in mining lease M15/11, including all
associated data/rights.
• Consideration: A$100,000 in Ore shares (at a deemed issue price equal to the 5-day VWAP
immediately prior to issue), and subject to a 6-month voluntary escrow period.
Settlement was completed, following receipt of the necessary regulatory and third-party consents and/or
approvals. This included receipt of shareholder approval for the issuance of the consideration shares at a
General Meeting of the Company held on 23 February 2026.
Significant gold exploration potential remains untested at Canyon, where the Company’s previous work
programmes have only covered approximately 200m of the total 1.7km strike length.
Systematic, follow-up testing of Canyon is set to be conducted as part of the Company’s 30,000m Phase 4
drilling programme at the Coolgardie Gold Projects. This is planned to include a dedicated AC drilling
programme targeting high-priority gold targets later in 2026.
Project Agreement executed with the Coolgardie Gold Project Traditional Owners
On 24 February 2026, Ore announced it had executed a Project Agreement with the Marlinyu Ghoorlie
Native Title Applicants for and on behalf of the Marlinyu Ghoorlie People (Marlinyu Ghoorlie), the traditional
owners of the land on which Ore’s Coolgardie Gold and Lithium Projects portfolio is located.
ORE RESOURCES LIMITED: INTERIM FINANCIAL REPORT − 31 DECEMBER 2025 10
Figure 7: Broad Miriam scale map with geochemical anomalies overlying magnetic
geophysics
The execution of the Project Agreement represents a seminal milestone for Ore and Marlinyu Ghoorlie,
providing a framework for collaboration between the parties across the exploration, development and
operational phases of the Coolgardie Gold and Lithium Projects. In particular, it establishes a robust
foundation for the protection of heritage and to support Ore’s advancement of targeted future mine
developments within its Coolgardie Projects portfolio.
Burbanks East Gold Project (100%)
The Burbanks East Project is located directly east (~2 km) of the Burbanks Mine (current resource 466koz @
2.4 g/t Au) owned by Horizon Minerals (ASX: HRZ), located approximately 2.5 km from Miriam and 7 km
from the Kangaroo Hills Lithium Project.
Broad surface gold anomalies identified at Burbanks East
Following the expansion of the Burbanks East tenure to over 10km2
in June 20251F2 , Ore
commenced an extensive review of all available historical data covering the new tenements to
better evaluate the underlying gold potential of the expanded tenure. This included the review
2 Refer to OR3 ASX announcement “FBM Expands Gold Tenure at Coolgardie” dated 5 June 2025
ORE RESOURCES LIMITED: INTERIM FINANCIAL REPORT − 31 DECEMBER 2025 11
of historic surface geochemistry and drilling activities which discovered multiple shallow drilling
intercepts and uncovered six (6) broad (>20ppb) gold anomalies2F3.
Investigation into shallow RAB and AC drilling conducted by exploration companies, Croesus Mining NL,
Monarch Resource Limited, Mt Kersey Mining and Cazaly Resources during the late 1990’s and early 2000’s
and RC drilling completed by Beacon Minerals in 2024 highlighted numerous significant gold intercepts
within regolith, including:
• 8m @ 3.37 g/t Au from 32m (KSC3339)
• 6m @ 1.84 g/t Au from 44m (KSC3336)
• 10m @ 0.9 g/t Au from 36m including 2m @ 3.1 g/t Au (LEB122)
• 3m @ 4.57 g/t Au from 28m (KSC3314)
While most of the drilling is shallow in nature and wide-spaced, many of the anomalous intercepts are
poorly understood or not closed out and remain open to future testing. Additionally, most of the
anomalous surficial gold targets have no basement fresh rock drill testing, including a 2.7km striking
target which has no reported exploration drilling.
Broad gold targets defined through review of magnetic geophysics
The Company engaged geophysical consultants, Southern Geoscience, to collate all existing airborne
magnetic data over the tenure. Additionally, Ore conducted a small ground magnetic survey of infill areas
within the tenure where existing magnetic data was insufficient for the interpretative exercise. These two
data sources were subsequently collated and enhanced with the resulting geophysical products enabling
Ore to conduct an internal review and litho-magnetic interpretation of Burbanks East.
In August 2025, Ore announced that it had identified seven (7) broad prospective gold targets from this
review (Figure 7). These targets are characterised by a combination of lithological changes, localised
demagnetisation, faulting and offsetting, which may all be significant for gold mineralisation.
Many of these structural targets exhibit strong coincidence with previously identified gold
anomalies, including the previously identified 2.7 km striking gold-in-soil anomaly target which has
no historically reported exploration drilling. This target sits along strike from Beacon Minerals’
MacPhersons Reward and is interpreted to represent a faulted or sheared contact between mafic and
ultramafic units. This target is currently interpreted to likely extend both to the north and south.
Importantly, Ore also identified two potential intrusion sites represented by sub-circular demagnetised
zones which could be important geological elements to potential gold mineralisation.
Historical drilling at two of these targets located in the southern part of the tenement returned significant
intercepts in shallow regolith:
• 8m @ 3.37 g/t Au from 32m (KSC3339)
• 10m @ 0.9 g/t Au from 36m including 2m @ 3.1 g/t Au (LEB122)
Next steps at Burbanks East
Ore aims to further advance prospective gold targets at Burbanks East to drill-ready status through
additional ground truthing and mapping, while grant of the tenure applications progress in parallel.
Negotiations are advancing steadily towards a HPA with the relevant Native Title Party. Upcoming
exploration workstreams at Burbanks East are expected to complement ongoing exploration drilling and
technical work at Miriam.
3 Refer to OR3 ASX announcement “Burbanks East Historical Shallow Drill Results of up to 8m at 3.37g/t Au” dated 1 July 2025
ORE RESOURCES LIMITED: INTERIM FINANCIAL REPORT − 31 DECEMBER 2025 12
Figure 8: Broad Miriam scale map with geochemical anomalies overlying magnetic
geophysics
Expansive 30,000m Phase 4 Drilling Programme Commenced at the Coolgardie Gold Projects
On 3 February 2026, Ore commenced its expansive gold-focused Phase 4 drilling programme at the
Coolgardie Gold Projects, located in the Eastern Goldfields of Western Australia.
This programme, consisting of approximately 30,000m of RC, regional AC and diamond core drilling, is
designed to materially expand the existing gold footprint across our broader Coolgardie tenure and to
unlock exciting new gold opportunities in and around existing prospects.
An initial 3,000 - 5,000m of RC drilling is underway at Miriam, targeting further extensions to the emerging
gold mineralised footprint at the Forrest prospect. This RC drilling is nearing completion with results
expected from late March 2026.
First-pass AC drilling also scheduled to commence in late March 2026 over priority Miriam regional
prospects, including Jungle, Forrest North, Burbanks Monarch, Goroke and Burbanks East (upon grant of
tenure and drilling approvals).
The Phase 4 programme is expected to materially advance gold prospectivity across the Coolgardie Gold
Projects, targeting the delineation of new gold resources at existing prospects including Forrest and
enhancing discovery potential across Ore’s broader project landholdings.
ORE RESOURCES LIMITED: INTERIM FINANCIAL REPORT − 31 DECEMBER 2025 13
KAL EAST GOLD PROJECTS, WESTERN AUSTRALIA
The Kal East Gold Projects represents a combined 740.5km2
of exploration tenure, giving Ore one of the
largest landholdings in the Eastern Goldfields an (Figure 9).
Much of the Kal East tenure is underexplored by modern exploration processes. Given the scale of gold
endowment within the region, there remains clear potential for further significant discovery via utilisation
of Ore’s systematic and targeted gold exploration strategy.
Planned exploration works at the Kal East Gold Projects will complement Ore’s ongoing exploration
programs at the Coolgardie Gold Projects, which remain the Company’s primary exploration focus for
2026.
Figure 9: Regional Location Map - Goldfields Projects
ORE RESOURCES LIMITED: INTERIM FINANCIAL REPORT − 31 DECEMBER 2025 14
Randalls Gold Project
Binding option agreements to acquire prospective Randalls gold tenure
During the reporting period, Ore entered into two binding option agreements to acquire 100%
ownership of all mineral interests comprising the Randalls Gold Project (Randalls) (Figure 9). The first
option agreement was signed with Miramar Resources (Miramar) in October 2025, under which Miramar
granted the Company an exclusive 6-month option to acquire 100% ownership of all its mineral interests
pertaining to Randalls.
The second option agreement was signed in December 2025, pertaining to the E25/660 tenement
application covering a 77.5km2
area of prospective exploration tenure running contiguous to the other
Randalls South tenements.
The material terms of the first agreement with Miramar are as follows:
• Option: Exclusive option period of 6 months with a non-refundable A$50,000 option fee paid on
execution. Ore may terminate the option at any time during the option period.
• During option period: Ore receives operational access to granted tenements and is responsible
for rents/outgoings, minimum expenditure, heritage and rehabilitation relating to its activities.
Miramar must keep tenements in good standing and facilitate access/approvals.
• Settlement: On exercise, completion occurs 5 business days after satisfaction of customary
conditions precedent (including receipt of any necessary regulatory or third party consents or
approvals).
• Settlement Consideration:
o A$125,000 cash, and
o A$125,000 in Ore shares (at a deemed issue price equal to the 10-day VWAP prior to option
exercise), and
o 1% net smelter return royalty over future production from the tenements, with a right to buy
back 0.5% of the royalty for A$500,000, and otherwise on industry standard terms.
• Deferred (milestone) consideration:
o A$250,000 on announcing a JORC-compliant Mineral Resource ≥ 250 koz Au across the
tenements, at greater than 1 g/t Au; and
o a further A$250,000 on announcing a JORC-compliant Mineral Resource ≥ 500 koz Au across
the tenements, at greater than 1 g/t Au.
The material terms of the second agreement are as follows:
• Option: Exclusive option period of twelve months with a non-refundable option fee of A$25,000,
paid in Ore scrip at a share price equal to the 5-day VWAP at date of execution, with a six-month
escrow period.
• Exercise: If the option is exercised, payment of A$100,000 in Ore scrip priced at the 5-day VWAP
at date of Agreement execution, with a six-month escrow period.
ORE RESOURCES LIMITED: INTERIM FINANCIAL REPORT − 31 DECEMBER 2025 15
Project overview
Randalls consists of seven (7) tenements (one granted EL and six (6) ELAs) overlying 697.5km2
of
prospective exploration tenure in the W.A. Goldfields.
Randalls lies along trend from several major gold camps including Vault Minerals’ (ASX: VAU) Mount
Belches (+1.7 Moz current resource), Daisy (+1.5 Moz current resource) and Aldiss (+0.4 Moz current
resource) mining centres (collectively, the Mt Monger Operations), which are serviced by its 1.3 Mtpa
Randalls gold process plant. It also lies within trucking distance of multiple other gold process plants
including Black Cat Syndicate’s (ASX: BC8) Lakewood plant and Northern Star’s (ASX: NST) Kanowna Bell
plant, delivering multiple potential routes of existing processing optionality for any new discovery.
As part of its due diligence to potentially exercise these options and acquire the project, Ore commenced
a detailed review of gold prospectivity at Randalls by compiling and reviewing all available exploration data
pertaining to historical drilling, surface geochemistry and magnetic geophysics.
In collaboration with Southern Geoscience Consultants (SGC), Ore compiled all available magnetic
geophysical data pertaining to Randalls. This data, compiled from multiple sources and reprocessed,
enabled Ore to complete a litho-structural review of Randalls South in December 2025 and Randalls North
subsequent to end of the quarter in January 2026.
New, prospective gold targets identified at Randalls South
The Randalls southern tenure (Randalls South) overlies an archaean sedimentary sequence of the Mt
Belches Formation, including the prospective Banded Iron Formation (BIF) which hosts the Rumbles, Santa,
Maxwells and Cock-Eyed Bob gold mines, all located within the Mount Belches Mining Centre (owned and
operated by Vault Minerals (ASX:VAU)3F
4
) to the west. The deposits are associated with the fold hinges/axis
and limbs of the tight chevron fold system of this BIF.
A detailed review of historical exploration drilling identified three high priority prospects at Waterloo,
Logan and Nightcrawler. These prospects represent walk-up drill targets that are all associated with the
Mount Belches BIF unit and supported by encouraging drill intercepts including:
• 10m @ 2.77 g/t Au from 12m (16FDRC018) (Waterloo)
• 8m @ 1.76 g/t Au from 20m (17FDRC006) (Waterloo)
• 1m @ 19.72 g/t Au from 9m (17FDRC009) (Waterloo)
• 3m @ 11.39 g/t Au from 81m (HYRC004) (Waterloo)
• 2m @ 6.11 g/t Au from 30m (HYRC014) (Waterloo)
• 12m @ 0.97 g/t Au from 31m (COWRC003) (Logan)
• 3m @ 1.35g/t Au from 28m (RURC010) (Nightcrawler)
Ore subsequently completed a detailed review of magnetic geophysics and surface geochemistry, which
identified 10 broad litho-structural targets along with 18 zones of moderate to large scale gold-in-soil
anomalism.
Ore’s detailed review of magnetic data has identified within the Randalls South tenure similar fold structures
to the Mt Belches BIF along with potentially important cross cutting structures which appear relevant to the
existing gold mineralised footprint at the Waterloo, Logan and Nightcrawler prospects.
Several of the litho-structural targets identified possess coincident gold-in-soil anomalism (>10ppb Au) or
are associated with historical drilling intercepts. These targets will be prioritised in Ore’s upcoming
exploration work programmes at Randalls.
4 Refer to Vault Minerals (ASX:VAU) Annual Report dated 15 October 2025
ORE RESOURCES LIMITED: INTERIM FINANCIAL REPORT − 31 DECEMBER 2025 16
Figure 10: Randalls South geophysical overview and key targets
New, prospective gold targets identified at Randalls North
The Randalls northern tenure (Randalls North) consist of applications E25/649, E25/670 and E25/671,
cover a prospective greenstone regolith bounding structure more than 30km in strike, running parallel to
the Randalls Fault. This major structure separates the Randalls mafic greenstones to the west from the
Mount Belches sedimentary formation to the east and potentially acts as a conduit for gold mineralisation.
Ore completed the detailed review of historical exploration drilling at Randalls North between October and
November 2025, identifying multiple large-scale gold in regolith anomalies along the Randalls Fault,
including Lone Pine Dam, Venetian, Campese and Lake Yindarlgooda.
Lone Pine Dam Prospect
Multiple mineralised trends have been identified at Lone Pine Dam, with strike lengths ranging between
1.3 km and 3.2 km. All trends are overlapping or adjacent to the Randalls Fault with anomalous intercepts
plotting within Archaean basalts and the Mt Belches Sedimentary Formation.
Key historical intercepts at Lone Pine Dam include:
• 8m @ 3.1 g/t Au from 4m (95LPR357)
• 12m @ 1.22 g/t Au (VRB165), within 21m @ 0.80 g/t Au from 44m
• 4m @ 1.12 g/t Au from 24m (95LPR372)
• 4m @ 1.05 g/t Au from 36m (95LPR333)
• 2m @ 1.12 g/t Au from 36m (VRB194)
ORE RESOURCES LIMITED: INTERIM FINANCIAL REPORT − 31 DECEMBER 2025 17
Venetian Prospect
Venetian consists of a 3.6 km striking gold in regolith anomaly which runs NW-SE parallel to the Randalls
Fault. Numerous lines of drilling produced significant intercepts >0.1 g/t Au within recorded Archaean
basalts.
Key historical intercepts at Venetian include:
• 4m @ 2.79 g/t Au from 28m (VNRB0040)
• 18m @ 1.00 g/t Au from 31m, including 5m @ 1.98 g/t Au (VRB001)
• 16m @ 0.48 g/t Au from 60m, including 2m @ 2.10 g/t Au (VRB046)
• 4m @ 1.87 g/t Au from 16m and 21m @ 0.50 g/t Au from 75m to EOH (VRB113)
• 3m @ 1.03 g/t Au from 72m (VRB097)
Campese Prospect
Campese is a 1.4 km anomalous trend directly south of the Venetian Trend. Historical RAB and RC drilling
results are encouraging, evidencing gold mineralisation that is likely to be associated with the
same/continuous mineralised structure as Venetian. Key historical intercepts at Campese include:
• 2m @ 5.55 g/t Au from 63m (CR3)
• 4m @ 1.00 g/t Au from 70m (CR5)
• 4m @ 2.03 g/t Au from 16m (CB19)
Ore’s detailed review of magnetic geophysics and surface geochemistry at Randalls North, released post-
end of the reporting period, identified nine (9) broad litho-structural targets along with five (5) zones of
moderate-to-large scale gold-in-soil anomalism. These targets are located within the Lone Pine Dam,
Venetian and Campese prospects.
Several of the litho-structural targets identified possess coincident gold-in-soil anomalism (>20ppb Au) or
are associated with historic drilling intercepts. These targets are set to be prioritised in Ore’s upcoming
exploration work programmes at Randalls.
Upcoming work programmes at Randalls
Ore continues to advance due diligence activities at Randalls. Negotiations with relevant Native Title Parties
underway to advance tenements to grant, along with the scheduled commencement of initial
environmental surveys. To date, Ore has identified nineteen
Share your feedback