Lithium Mineralisation Extended Beyond Mineral Resource
Released
Released
Announcement PDF
ASX Announcement
10 September 2026
ASX: OR3
Follow Us
E. info@oreresources.com.au
P. +618 6383 7817
oreresources.com.au
ORE Resources
Level 2, 34 Colin St, West Perth WA 6005
DRILLING EXTENDS LITHIUM MINERALISATION BEYOND
MINERAL RESOURCE
Ore Resources Ltd (ASX: OR3) (Ore or the Company) is pleased to announce the results from the regional
Reverse Circulation (RC) drilling programme conducted at its 100%-owned Coolgardie Lithium Projects, located
in the Eastern Goldfields of Western Australia.
HIGHLIGHTS
• Results received from 26 RC drill holes for approximately 3,300m completed at the Coolgardie Lithium
Projects during July and August 2026, comprising eleven (11) holes at the Kangaroo Hills Lithium
Project (Kangaroo Hills) and fifteen (15) holes at the Miriam Lithium Project (Miriam).
• Drilling targeted extensions to the Big Red and Potoroo pegmatite systems, while also testing regional
targets at the Big Red West and Western Grey prospects along with first-pass drill testing of Miriam.
• Results successfully extend the Big Red and Potoroo pegmatite systems beyond the current Mineral
Resource Estimate (MRE) boundaries, with mineralisation remaining open to the north and west.
• Significant intercepts include:
o 15m @ 1.14% Li2O from 68m (KHRC219), including 6m @ 1.60% Li2O (Potoroo)
o 15m @ 1.00% Li2O from 142m, including 3m @ 1.82% Li2O (KHRC225) (Big Red)
o 10m @ 1.04% Li2O from 155m (KHRC224), within 18m @ 0.83% Li2O from 147m (Big Red)
o 6m @ 1.00% Li2O from 59m (KHRC220) (Potoroo)
• Demonstrates further near-term upside to the Company's Direct Shipping Ore (DSO) development
strategy at Kangaroo Hills through additional resource growth, resource classification upgrades and
potential mine life extensions beyond the current DSO Scoping Study assumptions0F
1
.
• Drilling at Big Red West has identified a thickening pegmatite system, representing a compelling
exploration target with the potential to host mineralisation similar to Big Red and Potoroo.
• Twelve (12) pegmatite targets yet to be drill tested at Miriam, warranting systematic follow-up drilling
to unlock lithium resource potential.
• Following the release of the Lithium DSO study, Ore is progressing discussions with strategic parties to
advance the KHLP to production.
• Upcoming drill programme to recommence in early October 2026 across the Coolgardie Gold Projects,
focused on RC programme at Forrest and Burbanks Monarch prospects, with first pass air core at
Avoca to expand existing mineralisation and unlock new gold discovery potential.
• Ore is well funded and strongly positioned to advance all planned exploration across its WA
Goldfields portfolio, with a robust cash balance of A$6.8 million and zero debt (as at 30 June 2026).
1 Refer to OR3 ASX release dated 26 August 2026, “Lithium DSO Study Positions Kangaroo Hills for Rapid Lithium Production and Cash Flow”
oreresources.com.au 2
Ore Resources’ Managing Director and CEO, Nick Rathjen, commented:
“These latest RC drilling results continue to highlight the significant growth potential at Kangaroo Hills,
confirming extensions to mineralisation beyond the current MRE boundary, while also returning strong results
from areas currently classified as Inferred Resources. These outcomes have increased our confidence in the
Kangaroo Hills geological model by demonstrating the continuity, grade and thickness of mineralisation,
providing a strong foundation for future resource growth and classification upgrades.”
“Drilling has continued to reinforce the quality, scale and continuity of the Big Red and Potoroo pegmatite
systems, which importantly remain open to the north and west. Beyond the resource area, regional exploration
also delivered encouraging first-pass results, with drilling at Big Red West intersecting a 44m-thick pegmatite
system. These results also suggest the system remains open and may be thickening towards the east, providing
further evidence of lithium prospectivity within the broader project area.”
“While initial drilling at Miriam did not return significant lithium mineralisation, the project remains highly
prospective, with only one of thirteen identified pegmatite targets tested to date. With twelve additional targets
remaining untested, the project remains at an early stage of evaluation and continues to offer significant lithium
discovery potential, complementing other priority targets at Kangaroo Hills that are ready for immediate follow-
up drilling.”
“We are excited to recommence drilling in early October 2026 with a focus on expanding the highly prospective
Forrest and Burbanks Monarch gold prospects within the Miriam Gold Project. In addition, first pass drilling at
Avoca is planned and we expect a strong pipeline of news flow as we continue to unlock value across our lithium
and gold portfolio through the remainder of 2026 and into next year.”
Overview
Following the successful RC drilling programme undertaken in May 2026 at Kangaroo Hills1F
2
, the Company
expanded its operational focus at the Coolgardie Lithium Projects through further targeted exploration drilling.
Following the completion of a diamond drilling programme, Ore completed a subsequent RC drilling programme
at Kangaroo Hills over late July to August 2026.
The programme was designed to test potential extensions of the Big Red and Potoroo pegmatite systems
while also evaluating several regional targets, including Big Red West and Western Grey. Additionally, the
programme included first-pass drill testing of the Miriam Lithium Project.
The regional RC programme comprised approximately 3,300m of drilling across 26 holes, including 11 drill
holes at Kangaroo Hills and 15 drill holes at Miriam. The objective of the programme was to assess resource
growth opportunities beyond the current MRE footprint, improve geological understanding of known
pegmatite systems, and evaluate the prospectivity of several regional targets within the broader Coolgardie
Lithium Project area.
Results have now been received for this drilling at both Kangaroo Hills and Miriam. Refer to Appendix 1 for full
details on assay results and drill hole collar locations.
2 Refer to OR3 ASX releases dated 5 May 2026, “Coolgardie Lithium Project Update”, and 3 June 2026, “New Lithium Drilling Extends Big Red & Potoroo”
oreresources.com.au 3
Figure 1: Coolgardie Lithium Projects – Plan View
Regional drilling extends lithium footprint at Kangaroo Hills
Big Red and Potoroo
Drilling at the Big Red and Potoroo deposits targeted mineralised extensions beyond the current MRE
boundaries and areas currently classified as Inferred Resources. Additionally, the programme was designed to
oreresources.com.au 4
improve geological confidence in the Kangaroo Hills resource model by confirming the continuity of pegmatite
mineralisation and validating grade and thickness distributions.
The results of this drilling successfully achieved these objectives, demonstrating the potential for further
resource growth and providing a solid foundation for future upgrades to the Kangaroo Hills MRE.
At Potoroo, drill holes KHRC219 and KHRC220 intersected thick zones of mineralised pegmatite within the
western portions of the deposit, where Inferred Resources have been defined. Importantly, both holes
returned significant intercepts at higher grades than previously modelled at Potoroo:
• 15m @ 1.14% Li2O from 68m (KHRC219), including 6m @ 1.60% Li2O from 76m
• 6m @ 1.00% Li2O from 59m (KHRC220)
At Big Red, drill holes KHRC225 and KHRC224 also returned significant intercepts outside the MRE boundary:
• 15m @ 1.00% Li2O from 142m (KHRC225), including 3m @ 1.82% Li2O from 150m
• 10m @ 1.04% Li2O from 155m, within a broader intercept of 18m @ 0.83% Li2O from 147m (KHRC224)
These results confirm a northern extension of the Big Red pegmatite system beyond the current MRE
boundary with grades and thickness consistent with the existing resource, reinforcing the scale and continuity
of this key pegmatite system. Notably, mineralisation remains open further to the north, highlighting
significant potential for further resource growth.
Figure 2: Cross Section – KHRC224 to KHRC225
oreresources.com.au 5
Regional targets
At Big Red West, drilling was designed to follow up a 17m-thick pegmatite previously intersected during Ore’s
drilling programmes in 2024. To better understand the geometry and mineral potential of the system, Ore
completed angled drill holes to the east and west of the original intercept. Drill hole KHRC227, drilled towards
the west, intersected a 44m-thick pegmatite returning 2m @ 1.12% Li2O from 67m, and 1m @ 1.48% Li2O from
89m.
These results indicate that the pegmatite system remains open and may be thickening towards the east, with
encouraging evidence of lithium mineralisation. These outcomes provide increased confidence in the
prospectivity of this target and support further follow-up drilling to assess its potential scale and grade. Given
its geological setting, Big Red West represents a compelling exploration target with the potential to host
mineralisation analogous to that observed at the nearby Big Red and Potoroo deposits.
Drilling at the Western Grey prospect and the Miriam Lithium Project did not return any significant lithium
intercepts. At Miriam, initial drilling targeting one (1) of thirteen (13) identified outcropping pegmatite targets,
intersecting pegmatite zones of up to 2m in width. With twelve (12) pegmatite targets yet to be drill tested,
the project retains significant exploration potential and warrants further systematic assessment.
oreresources.com.au 6
Figure 3: Coolgardie Lithium Regional Map
Next steps
The results of this regional RC drilling programme further demonstrate the significant resource growth potential
waiting to be unlocked within the broader Coolgardie Lithium Projects. In line with the recent DSO study, The
Ore Board endorses the outcomes of the Study, which present a strong business case for the commercial
development of Kangaroo Hills. The Study provides a strong foundation for advancing discussions with potential
strategic and commercial partners, including negotiations relating to offtake arrangements and project funding
oreresources.com.au 7
solutions. As these discussions continue to advance, Ore intends to progress additional project works to support
further optimisation of the mine plan and forecast economics.
In parallel, the Company is advancing its Mining Licence applications towards grant, as well as progressing all
necessary workstreams for requisite environmental approvals for the Project. Subject to receipt of requisite
approvals and finalisation of project funding, a Final Investment Decision (FID) on the Project is targeted for mid-
2027.
Drilling programme to recommence in early October 2026 across the Coolgardie Gold Projects, focused on RC
drilling at Forrest and Burbanks Monarch prospects, with first pass air core drilling at Avoca to expand existing
mineralisation and unlock new gold discovery potential.
Figure 3: WA Regional Lithium Map
oreresources.com.au 8
This announcement has been authorised for release by the Board of Directors of the Company.
For further information, visit http://www.oreresources.com.au/ or contact:
Nicholas Rathjen Robin Cox
CEO & Managing Director Technical Director
E: nrathjen@oreresources.com.au E: rcox@oreresources.com.au
https://oreresources.com.au/link/PR1v5r
Competent Persons Statement
The information in this announcement that relates to Exploration Results pertaining to the tenements the subject
of the Agreement is based on and fairly represents information compiled by Mr Robin Cox BSc (E.Geol), a
Competent Person, who is a Member of the Australian Institute of Mining and Metallurgy. Mr Cox is the
Company’s Chief Geologist and executive Technical Director and has sufficient experience that is relevant to the
style of mineralisation and type of deposit under consideration and to the activity being undertaken to qualify as
a Competent Person as defined in the 2012 Edition of the Australasian Code for Reporting of Exploration Results,
Mineral Resources and Ore Reserves. Mr Cox consents to the inclusion in this announcement of the matters based
on his information in the form and context in which it appears.
Forward-Looking Statements
This document may include forward-looking statements. Forward-looking statements include, but are not limited
to, statements concerning Ore Resources Limited’s planned exploration programme and other statements that
are not historical facts. When used in this document, the words such as “could,” “plan,” “estimate,” “expect,”
“intend,” “may”, “potential”, “should,” and similar expressions are forward-looking statements. Although Ore
Resources Limited believes that its expectations reflected in these forward-looking statements are reasonable,
such statements involve risks and uncertainties, and no assurance can be given that actual results will be
consistent with these forward-looking statements.
Previously Reported Results
The information in this announcement that relates to previously reported Exploration Results and Estimates of
Mineral Resources is extracted from the ASX announcements as noted in the ‘References’ and referenced in the
text (Original Announcements). The Company confirms that it is not aware of any new information or data that
materially affects the relevant information included in the Original Announcements and, in the case of Estimates
of Mineral Resources, that all material assumptions and technical parameters underpinning the estimates in the
Original Announcements continue to apply and have not materially changed. Ore confirms that the form and
context in which the Competent Persons’ findings are presented have not been materially modified from the
Original Announcement.
oreresources.com.au 9
About Ore Resources Ltd (ASX: OR3)
THE BUSINESS: Gold and lithium exploration and development
Ore Resources (ASX: OR3) is an exploration and development company focused on rapidly advancing its 100%
owned Coolgardie and Kal East Gold and Lithium Projects in the Eastern Goldfields of Western Australia.
THE LOCATION: Infrastructure-rich project setting
The Eastern W.A. Goldfields is an
outstanding location in which to explore
for, build, and operate gold and lithium
mines. It is a long-established mining
province with all the accompanying
benefits, including all-year land access,
skilled labour, mining services and
infrastructure.
The Projects are positioned within 50km of
the mining hub of Kalgoorlie (via sealed and
access roads), approximately 370km to the
port of Esperance and approximately
550km to Perth via road and rail. We are
proximal to multiple gold and lithium
mining and processing operations and
development projects of substantial scale.
This available range of potential
commercialisation options, including
standalone development, positions us well
to monetise current and future success.
THE TEAM: Proven value generators
Our carefully assembled team has an extensive track record of exploration success, project stewardship,
development expertise and operating excellence that has repeatedly resulted in the delivery of substantial
shareholder value: Nick Rathjen (MD), Robin Cox (Technical Director), Nev Power (Chairman), Rob Waugh (NED).
THE CAPACITY: Balance sheet strength and runway
We are a business and team that is resolutely focussed on the stewardship of our shareholders’ capital and the
astute application of this capital for maximal return. We are well-funded to undertake our extensive planned
exploration and evaluation work programs throughout 2026 and beyond.
oreresources.com.au 10
Appendix 1
Table 1 – Drill Hole Significant Intercepts >0.3% Li2O
(Intervals represented as down dole length)
Hole ID
Depth
From
Depth
To
Interval
Width Li2O (%) Ta (ppm) Intercept
KHRC219 69 84 15 1.14 97 15m @ 1.14 %
including 76 82 6 1.60 123 6m @ 1.60 %
KHRC220 61 67 6 0.92 110 6m @ 1.00 %
KHRC222 143 145 2 0.64 89 2m @ 0.64 %
KHRC224 147 165 18 0.84 84 18m @ 0.84 %
including 155 165 10 1.04 87 10m @ 1.00 %
including 160 163 3 1.53 87 3m @ 1.53%
KHRC225 142 157 15 1 85 15m @ 1.00 %
including 150 153 3 1.82 109 3m @ 1.82 %
KHRC227 53 54 1 0.31 49 1m @ 0.31 %
KHRC227 67 69 2 1.12 40 2m @ 1.12 %
KHRC227 89 90 1 1.49 217 1m @ 1.49 %
Table 2 – Drill Hole Location Information
(UTM MGA94 Zone 51)
Project Hole ID
Hole
Type Depth Easting Northing RL Dip Azimuth
KHLP KHRC219 RC 174 317764.9 6558514 399.619 -60 90
KHLP KHRC220 RC 180 317750.1 6558513 399.238 -90 0
KHLP KHRC221 RC 180 317776.2 6558651 396.69 -90 0
KHLP KHRC222 RC 216 317778.3 6558651 396.773 -60 90
KHLP KHRC223 RC 204 317781.8 6558729 397.123 -60 90
KHLP KHRC224 RC 180 317941.3 6558717 392.957 -90 0
KHLP KHRC225 RC 189 317990 6558704 392.574 -65 90
KHLP KHRC226 RC 120 317224.4 6558441 397.862 -60 270
KHLP KHRC227 RC 120 317212.5 6558445 398.31 -60 90
KHLP KHRC228 RC 126 317109 6560052 419.704 -60 90
KHLP KHRC229 RC 150 317005.7 6560038 418.42 -60 90
Miriam MGRC001 RC 108 319879.7 6561223 397.263 -60 90
Miriam MGRC002 RC 102 319808.7 6561213 398.173 -60 90
Miriam MGRC003 RC 102 319757.2 6561211 397.526 -60 90
Miriam MGRC004 RC 102 319874.4 6561271 396.739 -60 90
Miriam MGRC005 RC 102 319817.9 6561281 397.223 -60 90
Miriam MGRC006 RC 108 319759.6 6561271 397.776 -60 90
Miriam MGRC007 RC 102 319590.1 6561264 396.591 -60 90
Miriam MGRC008 RC 102 319894 6561344 397.614 -60 90
Miriam MGRC009 RC 102 319823.2 6561342 398.492 -60 90
Miriam MGRC010 RC 108 319750.7 6561361 399.858 -60 90
oreresources.com.au 11
Miriam MGRC011 RC 114 319923.4 6561240 395.594 -60 90
Miriam MGRC012 RC 108 319736.6 6561849 402.174 -60 90
Miriam MGRC013 RC 102 319664.8 6561867 400.388 -60 90
Miriam MGRC014 RC 126 319864.4 6561432 402.446 -60 90
Miriam MGRC015 RC 54 319822.1 6561508 403.432 -60 90
oreresources.com.au 12
JORC Code, 2012 Edition, Table 1
Section 1: Sampling Techniques and Data
CRITERIA EXPLANATION COMMENTARY
Sampling techniques
● Nature and quality of sampling (e.g. cut
channels, random chips, or specific
specialised industry standard
measurement tools appropriate to the
minerals under investigation, such as
down hole gamma sondes, or handheld
XRF instruments, etc). These examples
should not be taken as limiting the broad
meaning of sampling.
● Include reference to measures taken to
ensure sample representivity and the
appropriate calibration of any
measurement tools or systems used.
● Aspects of the determination of
mineralisation that are Material to the
Public Report. In cases where ‘industry
standard’ work has been done this would
be relatively simple (e.g. ‘reverse
circulation drilling was used to obtain 1m
samples from which 3kg was pulverised
to produce a 30g charge for fire assay’).
In other cases, more explanation may be
required, such as where there is coarse
gold that has inherent sampling
problems. Unusual commodities or
mineralisation types (e.g. submarine
nodules) may warrant disclosure of
detailed information.
Drilling
● Lithium-Caesium-Tantalum (LCT) mineralisation
at the Coolgardie Lithium Project (KHLP) has
been sampled from the following drilling
techniques.
● Reverse circulation (RC) drilling creates 1m
samples of pulverised chips, approximately
3kg’s is collected in individual calico bags
Drilling techniques
● Drill type (e.g. core, reverse circulation,
open-hole hammer, rotary air blast,
auger, Bangka, sonic, etc) and details
(e.g. core diameter, triple or standard
tube, depth of diamond tails, face-
sampling bit or other type, whether core
is oriented and if so, by what method,
etc).
• RC drilling was conducted on reported results
Drill sample recovery
● Method of recording and assessing core
and chip sample recoveries and results
assessed.
● Measures taken to maximise sample
recovery and ensure representative
nature of the samples.
● Whether a relationship exists between
sample recovery and grade and whether
sample bias may have occurred due to
preferential loss/gain of fine/coarse
material.
• Sample recovery is noted in the field for each
individual sample. Sample is collected via a
cyclone and cone splitter attached to the drill
rig, which is considered standard for RC
sampling.
• No relationship between sample recovery and
grade has been yet observed and no sample
bias is believed to have occurred.
Logging
● Whether core and chip samples have
been geologically and geotechnically
logged to a level of detail to support
appropriate Mineral Resource estimation,
mining studies and metallurgical studies.
• Drill chips are lithologically logged by
Geologists in the field
• Logging is qualitative, recording rock type and
mineral abundance
• Logging of RC chips is conducted on a 1 metre
sample size.
oreresources.com.au 13
CRITERIA EXPLANATION COMMENTARY
● Whether logging is qualitative or
quantitative in nature. Core (or costean,
channel, etc) photography.
● The total length and percentage of the
relevant intersections logged.
• Natural changes in mineral abundance are
recorded
Sub-sampling
techniques and
sample preparation
● If core, whether cut or sawn and whether
quarter, half or all core taken.
● If non-core, whether riffled, tube sampled,
rotary split, etc and whether sampled wet
or dry.
● For all sample types, the nature, quality
and appropriateness of the sample
preparation technique.
● Quality control procedures adopted for all
sub-sampling stages to maximise
representivity of samples.
● Measures taken to ensure that the
sampling is representative of the in-situ
material collected, including for instance
results for field duplicate/second-half
sampling.
● Whether sample sizes are appropriate to
the grain size of the material being
sampled.
● 1m RC percussion, sample is split via a cyclone
and cone splitter attached to the drill rig to
produce a bagged 3kg sample.
● Certified reference material and blank material
are inserted every 20 samples as per company
QA/QC procedure for both DD & RC.
● Field duplicates collected from the Cyclone and
cone splitter are inserted every 30 samples
● Sample weights per metre range between 1-3kg.
Quality of assay data
and laboratory tests
● The nature, quality and appropriateness
of the assaying and laboratory
procedures used and whether the
technique is considered partial or total.
● For geophysical tools, spectrometers,
handheld XRF instruments, etc, the
parameters used in determining the
analysis including instrument make and
model, reading times, calibrations factors
applied and their derivation, etc.
● Nature of quality control procedures
adopted (e.g. standards, blanks,
duplicates, external laboratory checks)
and whether acceptable levels of
accuracy (i.e. lack of bias) and precision
have been established.
● ALS Minerals, Lithium samples have been fused
with Na2O2 and digested in hydrochloric acid,
the solution is analysed by ICP; laboratory
package code ME-MS81 ICP-AES, ME-MS91.
The method is considered a whole rock analysis.
● A stoichiometric conversion of Li to Li2O is
applied consisting of a factor 2.153.
● Certified Reference Material (CRM’s) and quartz
blank (Blanks) samples are inserted 1:20 for DD
& RC and 1:30 for AC as part of Future Battery’s
QA/QC procedure. Accuracy and performance of
CRM’s and Blanks are considered after results
are received.
● Field duplicates collected from the Cyclone and
cone splitter are inserted every 30 samples
Verification of
sampling and
assaying
● The verification of significant intersections
by either independent or alternative
company personnel.
● The use of twinned holes.
● Documentation of primary data, data
entry procedures, data verification, data
storage (physical and electronic)
protocols.
● Discuss any adjustment to assay data.
• No third-party verification has been completed
to date
• Drill holes have not been twinned
• All primary paper data is held on site; digitised
data is held in a managed database off site.
• No adjustments to assays have occurred.
Location of data
points
● Accuracy and quality of surveys used to
locate drill holes (collar and down-hole
surveys), trenches, mine workings and
other locations used in Mineral Resource
estimation.
● Specification of the grid system used.
• Drill collars were surveyed in GDA94/MGA
Zone 51 datum by handheld GPS +-5m
accuracy
• At completion of programme drill collars were
then surveyed using a Differential GPS +- 0.1m
accuracy.
oreresources.com.au 14
CRITERIA EXPLANATION COMMENTARY
● Quality and adequacy of topographic
control.
Data spacing and
distribution
● Data spacing for reporting of Exploration
Results.
● Whether the data spacing and distribution
is sufficient to establish the degree of
geological and grade continuity
appropriate for the Mineral Resource and
Ore Reserve estimation procedure(s) and
classifications applied.
● Whether sample compositing has been
applied.
• Drill data spacing is sufficient to establish the
degree of geological and grade continuity
appropriate for this stage of exploration and
understanding of mineralisation
Orientation of data in
relation to geological
structure
● Whether the orientation of sampling
achieves unbiased sampling of possible
structures and the extent to which this is
known, considering the deposit type.
● If the relationship between the drilling
orientation and the orientation of key
mineralised structures is considered to
have introduced a sampling bias, this
should be assessed and reported if
material.
• Drill holes azimuths are commonly planned
perpendicular to stratigraphic strike where
practicable.
• Drill hole dip is regarded suitable for subvertical
stratigraphy and provides a near too true width
intersection to minimise orientation bias.
● The geometry of drill holes relative to the
mineralised zones achieves unbiased sampling
of this deposit type.
● No orientation-based sampling bias has been
identified.
Sample security
● The measures taken to ensure sample
security.
• Drill samples are collected in labelled
polyweave bags and closed with tight zip ties.
• Samples are transported within 1-2days of hole
completion by field staff directly to ALS
laboratories.
Audits or reviews
● The results of any audits or reviews of
sampling techniques and data.
• No independent audit or review has been
undertaken.
Section 2 – Reporting of Exploration Results
CRITERIA EXPLANATION COMMENTARY
Mineral tenement and
land tenure status
● Type, reference name/number, location
and ownership including agreements or
material issues with third parties such as
joint ventures, partnerships, overriding
royalties, native title interests, historical
sites, wilderness or national park and
environmental settings.
● The security of the tenure held at the
time of reporting along with any known
impediments to obtaining a licence to
operate in the area.
● The Kangaroo Hill Lithium Project
consists of 10 prospecting leases and
3 Mining Lease Applications.
● P15/5740, P15/5741, P15/5742,
P15/5743, P15/5749, P15/5750,
P15/5963, P15/5965, P15/6813,
P15/6681, M15/1887 (in application),
M15/1905 (in application), M15/1920 (in
application).
● All leases are held by Eastern Coolgardie
Goldfields Pty Ltd (ECG), a subsidiary of
Ore Resources Ltd
● Tenements P15/5741, P15/5963 and
P15/5965 and the Miriam tenements
overlap the Kangaroo Hills Timber
Reserve, a C class multi-purpose reserve
● Ore operate under an approved
Conservation Management Plan within
the reserve.
● For the purposes of a DSO operation, a
total royalty of 8.25% has been applied.
oreresources.com.au 15
CRITERIA EXPLANATION COMMENTARY
● There are no material issues with regard
to access.
● The tenements are in good standing and
no known impediments exist.
The Miriam Project consists of 5
prospecting leases and 3 Granted
Minin Leases.
● Granted leases are P15/6136,
P15/6137, P156138, P15/6139,
M15/1255, M15/1819, M15/1818
M15/1352 and applications P15/6135
P15/5775 and P15/5768-S.
● Leases P15/6136-6139 are held by
Coolgardie Nickel Pty Ltd, now an
100% subsidiary of Future Battery
Minerals Ltd. P15/6135 is held by
Limelight Industries Pty Ltd until time of
grant
● The tenements are located in the
Kangaroo Hills Timber Reserve, an
approved Conservation Management
Plan permits conditional access and
exploration of the tenure.
Exploration done by
other parties
● Acknowledgment and appraisal of
exploration by other parties.
● Focus Minerals owned the project
between 2007-2020. No lithium targeted
exploration was completed.
● Data collected by these entities has been
reviewed in detail by Ore.
Geology
● Deposit type, geological setting and style
of mineralisation.
● The Coolgardie Lithium Project is
regarded as a Lithium Caesium Tantalum
(LCT) enriched pegmatite which intrudes
older Archaean aged greenstone
lithologies.
Drill hole Information
● A summary of all information material to
the understanding of the exploration
results including a tabulation of the
following information for all Material drill
holes:
● easting and northing of the drill hole
collar
● elevation or RL (Reduced Level –
elevation above sea level in metres)
of the drill hole collar
● dip and azimuth of the hole
● down hole length and interception
depth
● hole length.
● If the exclusion of this information is
justified on the basis that the information
is not Material and this exclusion does
not detract from the understanding of the
report, the Competent Person should
clearly explain why this is the case.
● Drill hole location tables has been
included in published Ore ASX
announcements.
● Previous results have been supplied in
past cross-referenced announcements.
Data aggregation
methods
● In reporting Exploration Results,
weighting averaging techniques,
maximum and/or minimum grade
● Exploration Results were reported by
using the weighted average of each
oreresources.com.au 16
CRITERIA EXPLANATION COMMENTARY
truncations (e.g. cutting of high grades)
and cut-off grades are usually Material
and should be stated.
● Where aggregate intercepts incorporate
short lengths of high-grade results and
longer lengt
Share your feedback