Quarterly Activities/Appendix 5B Cash Flow Report
Released
Released
Announcement PDF
26 October 2023
QUARTERLY ACTIVITIES REPORT
For the period ending 30 September 2023
Future Battery Minerals Limited (ASX: FBM) (FBM or the Company), is pleased to provide the following report
on its activities during the September 2023 quarter. The Company’s primary focus during the reporting period
was progressing exploration activities at its Kangaroo Hills Lithium Project (KHLP) (100%) in Western Australia
and Nevada Lithium Project (NLP) (80%) in Nevada, USA.
HIGHLIGHTS
Kangaroo Hills Lithium Project (KHLP), WA (100%)
•
Phase 3 reverse circulation (RC) and diamond drilling (DD) programme commenced with primary focus
on infilling the Big Red Prospect (Big Red) and testing of regional targets1.
•
Initial Phase 3 drilling at Rocky Prospect (Rocky) identified multiple new stacked spodumene-bearing
pegmatites semi-parallel to Big Red2; Phase 3 RC programme expanded by an additional 6,000m.
•
Phase 3 progressed during the quarter; first batch of assays (41 holes) returned in mid-October 2023 plus
numerous further intercepts of thick, visually spodumene-bearing intercepts (assays pending)3.
•
DD program to test potential down-dip extension / thickening at Rocky to commence during November3.
•
DD component of Phase 2 drilling at Big Red returned high-grade assay results demonstrating continuation
of high-grade lithium in spodumene-bearing pegmatites and including:4
▪ 23m @ 1.19% Li2O from 44m (KHDD001);
▪ 10m @ 1.30% Li2O from 25m (KHDD002); and
▪ 5.9m @ 1.15% Li2O from 0m (KHDD004).
Completed acquisition of residual 20% minority interest in the KHLP, taking FBM’s ownership in the project
to 100%5.
•
Nevada Lithium Project (NLP), USA (80%)
•
Phase 2 RC drilling successfully intersected host formation to lithium claystone at Western Flats and Lone
Mountain Prospects, indicating potential extensions to mineralisation identified in Phase 16.
•
Exceptional assay results confirmed the presence of shallow and thick lithium claystone at the Lone
Mountain Prospect, including7:
▪ 179.8m @ 766ppm Li from 39.6m (WF23-015)
including 19.8m @ 1,010ppm from 80.8m;
▪ 170.7m @ 764ppm Li from 67.1m to end of hole (WF23-014)
including 27.4m 1,030ppm Li from 112.8m;
▪ 44.2m @ 542ppm Li from 114.3m (WF23-013); and
▪ 22.9m @ 652ppm Li from 163.1m (WF23-013).
Phase 3 Resource definition drilling commenced consisting of both RC and DD, with delivery of a maiden
Mineral Resource Estimate (MRE) targeted during Q1 20248.
•
1
Refer to ASX Announcement dated 4 July 2023 - Drilling Underway at Kangaroo Hills Lithium Project
Refer to ASX Announcement dated 24 August 2023 - New Stacked Spodumene Bearing Pegmatites Confirmed at KHLP
Refer to ASX Announcement dated 17 October 2023 - Kangaroo Hills High-Grade Lithium System Continues to Grow
4
Refer to ASX Announcement dated 18 July 2023 - Further High-Grade Lithium Results at Kangaroo Hills
5
Refer to ASX Announcement dated 11 August 2023 - Acquisition of 20% Interest in Kangaroo Hills Completed
6
Refer to ASX Announcement dated 13 July 2023 Potential Extensions to Li Claystone Identified in Nevada
7
Refer to ASX Announcement dated 4 August 2023 - Large Scale Lithium Discovery Confirmed in Nevada
8
Refer to ASX Announcement dated 3 October 2023 - Resource Drilling Underway at Nevada Lithium Project
2
3
Future Battery Minerals Ltd
info@futurebatteryminerals.com.au
Suite 10, 38 Colin St, West Perth WA 6005
+61 8 6383 7817
ABN 91 148 966 545
futurebatteryminerals.com.au
ASX:FBM
Follow Us
1
Corporate
•
Appointment of Mr Nicholas Rathjen as CEO and Managing Director, effective from 18 October 20239.
•
$7.6 million Placement to accelerate exploration drilling programmes at the KHLP and NLP10.
•
Cash balance as at 30 September 2023 of $5.05 million and zero debt (excluding typical trade creditors).
•
Second tranche of Placement funds ($2.4 million) to be received this quarter, pending shareholder
approval at the Company’s 2023 Annual General Meeting (AGM) on 22 November, which includes the
Directors participation in the Placement for $225,000.
December 2023 Quarter Planned Activity
The upcoming work programmes and expected results for FBM include:
KHLP
•
Expanded Phase 3 RC and DD programme in progress
•
Metallurgical and mineralogical assessment – initial results expected this quarter
•
Target generative geophysics:
▪ Expanded Resistivity Survey – underway
•
Baseline environmental surveys – underway and anticipated to be completed in November
NLP
•
Resource Definition Drilling
▪ DD programme – underway
▪ RC programme – to commence in November
Lithium Projects – Western Australia
Kangaroo Hills Lithium Project (KHLP) (100%)
During the quarter, FBM continued to rapidly advance exploration activities across the KHLP with final results
from the diamond drilling component of the Phase 2 drill programme received and the commencement of the
Phase 3 drill program.
Phase 2 Drilling
During the quarter, the Company received assay results from the Phase 2, five-hole DD programme at Big
Red. Results showed a continuation of high-grade Li from spodumene-bearing pegmatites, significant results
included:
•
23m @ 1.19% Li2O from 44m (KHDD001);
•
10m @ 1.30% Li2O from 25m (KHDD002); and
•
5.9m @ 1.15% Li2O from 0m (KHDD004).
The DD core component of the Phase 2 drilling programme was undertaken to gather further geological
information on Big Red, which will be utilised in the Company’s early stage metallurgical and mineralogy
investigation work. Significantly, the DD core produced thick intercepts of spodumene-bearing pegmatite with
thick high-grade lithium assays returned from three of the five diamond holes.
9
Refer to ASX Announcement dated 11 September 2023 – Managing Director and CEO Appointment
Refer to ASX Announcement dated 15 September 2023 - $7.6m Placement to Accelerate Lithium Exploration Drilling
10
Future Battery Minerals Ltd
info@futurebatteryminerals.com.au
Suite 10, 38 Colin St, West Perth WA 6005
+61 8 6383 7817
ABN 91 148 966 545
futurebatteryminerals.com.au
ASX: FBM
Follow Us
2
The new results round off the highly successful Phase 1 and 2 programmes where the previously announced
results highlight the significance of the Big Red discovery11:
•
29m @ 1.36% Li2O from 38m (KHRC011);
•
27m @ 1.32% Li2O from 64m (KHRC017);
•
23m @ 1.03% Li2O from 53m (KHRC031);
•
15m @ 1.03% Li2O from 39m (KHRC029);
•
19m @ 1.03% Li2O from 42m (KHRC015);
•
16m @ 1.09% Li2O from 11m (KHRC022);
•
13m @ 1.23% Li2O from 41m (KHRC030); and
•
12m @ 1.02% Li2O from 8m (KHRC021).
Phase 3 Drilling
Reverse circulation (RC)
During the quarter, Phase 3 drilling commenced at the KHLP, which initially consisted of 5,000m of RC infilling
at Big Red and testing of the regional targets at Rocky, Eastern Grey, Wallaroo and Pademelon. As a result
of the early success of the Phase 3 RC programme at Rocky, it was expanded by a further 6,000m in late
August to further expand Rocky as well as the Eastern Grey, Wallaroo and Pademelon prospects.
The initial target generative work successfully identified the targets, Rocky and Eastern Grey, which both host
confirmed pegmatites. The presence of a lithium-bearing pegmatite at Rocky was confirmed through the
proximal result of 5m @ 1.12% Li2O from 104m in KHRC0037.
Initial holes completed at Rocky intercepted multiple new pegmatites with close proximity to Big Red,
which have been interpreted as a larger stacked system which remains open in all directions. Multiple
intercepts contained significant visible spodumene within the pegmatites. At this stage, the pegmatites show
a semi-parallel structure to Big Red, which is characterised by a gentle -20 degree northerly dip.
The shallow spodumene-bearing pegmatites initially intercepted at Rocky exhibit a maximum thickness of 10m
(down hole width). However, there is strong potential to intercept thickened zones with similar widths to Big
Red (29m @ 1.36% Li2O from 38m KHRC0112) given the pinch and swell nature of the KHLP pegmatites.
Refer to ASX Announcements dated – 20 March 2023 - LCT-Pegmatite Discovery Confirmed at Kangaroo Hills; 3 May 2023 – Multiple High Grade Assay
Results Extend Lithium Discovery; 22 June 2023 – More High Grade Lithium Assays, New Pegmatite Uncovered
11
Future Battery Minerals Ltd
info@futurebatteryminerals.com.au
Suite 10, 38 Colin St, West Perth WA 6005
+61 8 6383 7817
ABN 91 148 966 545
futurebatteryminerals.com.au
ASX: FBM
Follow Us
3
Figure 1: KHLP – Big Red Prospect Drill Holes Plan View
Future Battery Minerals Ltd
info@futurebatteryminerals.com.au
Suite 10, 38 Colin St, West Perth WA 6005
+61 8 6383 7817
ABN 91 148 966 545
futurebatteryminerals.com.au
ASX: FBM
Follow Us
4
Figure 2: KHLP - RC Drilling Rig at the Rocky Prospect
Assay results from the first batch of Rocky holes were received and announced during October, broadly
confirming these visual estimations (refer FBM ASX Announcement of 17 October 2023). It was also
announced at this time that further drilling in the intervening period had seen numerous additional, substantial
intercepts of significant visually spodumene-bearing pegmatites (assays pending). These newer intercepts
included a number of down-hole widths in excess of 10m and ranging up to 25% visual spodumene
composition.
The Phase 3 drilling at Rocky through the quarter has progressively and significantly increased the
scale of this emerging system. Importantly, the pegmatites at Rocky remain open in all directions. The
expanded Phase 3 programme continues to test these pegmatites towards the east and south, employing
more closely spaced drilling suitable for incorporation in a Mineral Resource Estimate (MRE) along with Big
Red.
FBM has progressed Phase 3 RC drilling with 53 holes awaiting assays. RC drilling continues to test for shallow
strike extensions of the Big Red and Rocky systems, along with scout evaluation of regional targets such as
Wallaroo.
Diamond drilling (DD)
As part of the Phase 3 programme, a DD rig was mobilised to site during the quarter to provide core samples
for metallurgical test work and structural data to assess the geometry of the pegmatites at Big Red and Rocky.
Three DD holes were aimed at further testing the Big Red pegmatite. Significantly, drill hole KHDD006
intercepted 22m @ 1.24% Li2O from 23m, which is consistent with the other observed high-grade zones of the
Big Red pegmatite.
At Rocky, four DD holes (including one diamond tail of an earlier completed RC hole) were drilled to test the
observed pegmatites. All holes intercepted pegmatite ranging from <1m to 20.9m in downhole thickness.
Several pegmatite intercepts returned coarse visible spodumene with a distinct pale green colouration (assays
pending). Detailed structural logging of these core samples has also provided valuable guidance for optimising
the direction of the RC drilling.
FBM completed 6 Phase 3 DD holes during the quarter, with assays pending for 3 holes. Further diamond
drilling is set to commence during November to test potential depth extensions and/or thickening of the
mineralised pegmatites at Rocky.
Future Battery Minerals Ltd
info@futurebatteryminerals.com.au
Suite 10, 38 Colin St, West Perth WA 6005
+61 8 6383 7817
ABN 91 148 966 545
futurebatteryminerals.com.au
ASX: FBM
Follow Us
5
Figure 3: Plan view of the Rocky and Big Red Prospects and drilling locations
Drilling Strategy
The early observations of the shallow pegmatites at Big Red and Rocky can draw analogies to Liontown’s
Kathleen Valley Lithium Project (Figure 4). FBM’s exploration strategy will continue to follow the strike
and dip direction of the mineralised pegmatites to also potentially identify a much larger source
pegmatite.
Geophysical and Field Work
A closely spaced resistivity programme commenced at the KHLP with the objective of identifying new regional
prospects and refining existing targets. The non-ground disturbing survey is filling gaps and expanding the
previous IP survey, with a primary focus on testing areas within the Kangaroo Hills Timber Reserve where
further drill permits are currently being assessed. Significantly, Big Red is coincident with a resistivity anomaly
of over 1km north-south strike. It is anticipated that the survey will better refine the coincident resistivity
anomalies at the Western Grey and Quokka Prospects, allowing for more targeted drilling.
Target generative geophysics remains ongoing, with the Resistivity Survey now approximately 50% complete.
The data will be used to identify any potential subsurface pegmatites in the KHLP area that may carry further
lithium mineralisation.
Baseline environmental flora and fauna surveys are underway in the KHLP areas covering the Kangaroo Hills
Timber Reserve. The surveys are set to be completed during November and are a condition to further
permitting in the Timber Reserve.
Future Battery Minerals Ltd
info@futurebatteryminerals.com.au
Suite 10, 38 Colin St, West Perth WA 6005
+61 8 6383 7817
ABN 91 148 966 545
futurebatteryminerals.com.au
ASX: FBM
Follow Us
6
Figure 4: Liontown Resources Ltd (ASX: LTR) Kathleen Valley Project Cross Section, extracted from ASX
announcement of 5 November 2019
Metallurgical Test Work
The early-stage metallurgical test work is nearing completion with results expected in the current quarter. The
work is a first review of the amenability of the spodumene pegmatite to common processing techniques such
as Heavy Liquid Separation (HLS) and froth flotation. The work will form part of a larger ongoing metallurgy
study as the KHLP advances.
The test programme initially consists of the following methods:
•
Non-destructive core scanning;
•
Sample characterisation and mineralogical assessments;
•
Stage crush and screening for coarse and fine mineral processing;
•
HLS of the coarse (+850um) fractions to determine amenability to froth Dense Media Separation (DMS);
•
Preliminary grain size and liberation assessments; and
•
Sighter flotation tests to determine amenability to froth flotation.
Metallurgy and mineralogy will form part of FBM’s ongoing technical studies into the lithium mineralisation at
the KHLP.
Acquisition
On 11 August 2023, the Company announced the completion of the acquisition of the remaining 20% interest
in the KHLP from Goldfellas Pty Ltd (Goldfellas), a wholly owned subsidiary of Lodestar Minerals Limited
(ASX: LSR).
Future Battery Minerals Ltd
info@futurebatteryminerals.com.au
Suite 10, 38 Colin St, West Perth WA 6005
+61 8 6383 7817
ABN 91 148 966 545
futurebatteryminerals.com.au
ASX: FBM
Follow Us
7
As required under the Acquisition Agreement, the Company advanced the following consideration to Goldfellas
on completion:
•
$250,000 cash;
•
27,505,429 fully paid ordinary shares in the Company (Consideration Shares); and
•
27,505,429 Performance Rights in the Company, which will vest and convert into fully paid ordinary shares
upon FBM delineating and announcing a Mineral Resource (JORC Code compliant) of at least 10mt at
1.0% Li2O at the KHLP (Consideration Performance Rights).
The Consideration Shares and Consideration Performance Rights were issued under the Company's existing
Listing Rule 7.1 capacity.
A summary of the material terms of the Acquisition Agreement are detailed in the Company’s ASX
Announcement of 7 August 2023.
Lithium Projects – Nevada, USA
Nevada Lithium Project (NLP) (80%)
Phase 2 Drilling
Following the success of the maiden drilling campaign at the NLP, the Company completed a Phase 2
programme consisting of 3,000m of RC drilling. The Phase 2 programme was aimed at extending the known
lithium claystone horizon intercepted during the Phase 1 programme in drill hole WF23-011 at the Western
Flats Prospect, consisting of 109.7m @ 766ppm Li from a down-hole depth of 135m12 and which remained
open in multiple directions.
The Phase 2 programme incorporated drilling to the south of Western Flats at the Lone Mountain Prospect.
Assay results received during the quarter from this drilling highlighted a further discovery, and the
emerging scale of the broader system at the NLP, successfully intercepting thick, shallow lithium
mineralisation including:
•
179.8m @ 766ppm from 39.6m (WF23-015)
including 19.8m @ 1,010ppm from 80.8m;
•
170.7m @ 764ppm Li from 67.1m to end of hole (WF23-014)
including 27.4m 1,030ppm Li from 112.8m; and
•
44.2m @ 542ppm from 114.3m (WF23-013) and 22.9m @ 652ppm from 163.1m (WF23-013).
Lone Mountain has a current mineralised footprint of 3km east-west by 1.3km north-south. Importantly, field
mapping of Lone Mountain has identified a further 2km strike potential to the south, where it is anticipated that
mineralisation will continue and become shallower. The southern extension is the focus of further drilling in the
Phase 3 RC and DD programme, which commenced at the end of the quarter.
Phase 3 Drilling
The Phase 3 programme consists of both DD and RC drilling as the Company aims to deliver a maiden Mineral
Resource Estimate at the NLP in Q1 2024.
The MRE drilling programme is to consist of up to 20 wide-spaced holes of RC and DD. Alford Drilling LLC’s
DD rig is now on-site collecting core samples at Lone Mountain. The DD core samples will provide a more
accurate control on geology and will further test a number of locations where previous drilling techniques failed
to reach the planned target depth. The core samples taken will also be used for comparative analysis to RC
samples and to investigate any potential grade discrepancies between the RC and DD core sampling
techniques.
The RC drilling is scheduled to commence in November following completion of permitting to the south of Lone
Mountain and will cover the over 2km of additional prospective strike.
12
Refer to 13 April 2023 ASX Announcement - High grade Lithium Claystone Discovered in Nevada
Future Battery Minerals Ltd
info@futurebatteryminerals.com.au
Suite 10, 38 Colin St, West Perth WA 6005
+61 8 6383 7817
ABN 91 148 966 545
futurebatteryminerals.com.au
ASX: FBM
Follow Us
8
Figure 5: NLP - Drill Hole Locations at Western Flats and Lone Mountain
Future Battery Minerals Ltd
info@futurebatteryminerals.com.au
Suite 10, 38 Colin St, West Perth WA 6005
+61 8 6383 7817
ABN 91 148 966 545
futurebatteryminerals.com.au
ASX: FBM
Follow Us
9
Figure 6: NLP - Alford Drill Rig at Lone Mountain
Future Battery Minerals Ltd
info@futurebatteryminerals.com.au
Suite 10, 38 Colin St, West Perth WA 6005
+61 8 6383 7817
ABN 91 148 966 545
futurebatteryminerals.com.au
ASX: FBM
Follow Us
10
Nickel Projects – Western Australia
Saints Nickel Project (Saints), (100%)
There was no significant work completed at the Saints Nickel Project during the quarter.
Corporate
Cashflows for the Quarter
Attached to this report is the Appendix 5B containing Company’s cashflow statement for the September 2023
quarter. The cash outflows for the Quarter included $4.56 million incurred on exploration and evaluation
expenditure, which was primarily associated with the costs relating to the geological and mining studies, and
drilling programmes, at KHLP, NLP, Saints and Nepean. There were $627,000 of administration and corporate
costs paid during the quarter, and as disclosed on section 6 of Appendix 5B, $221,000 payments were made
to related parties, including the Directors and their associates pursuant to existing director fee agreements for
Executive and Non-Executive Directors.
As at 30 September 2023, the Company had available cash of approximately $5.05 million and zero debt
(excluding typical trade creditors). The second tranche of funds from the recent placement (approximately $2.4
million; see section below) are expected to be received during the current quarter, pending shareholder
approval at the Company’s 2023 AGM in November.
Board Changes
During the quarter, the Company appointed Mr. Nicholas Rathjen as Chief Executive Officer (CEO) and
Managing Director, effective from 18 October 2023. Nick’s understanding of lithium mining, processing,
marketing and downstream conversion brings a broad list of capabilities to the Company as it rapidly advances
the KHLP and NLP.
On 18 October 2023, FBM advised that, following the commencement of Nick as Managing Director and CEO,
Mr. Mike Edwards had stepped down from his executive duties and assumed the role of Non-Executive
Chairman.
On 11 October 2023, FBM advised that Mr. Paul Brown had resigned as a Non-Executive Director due to his
executive duties with Hastings Technology Metals (ASX:HAS).
FBM has launched a process to assess the Board skills and expertise that will best support the Company in
its planned activities. Following this assessment, it is anticipated that a new non-executive director(s) will be
appointed to complement the existing Board composition.
Placement
During the quarter, the Company received firm commitments from institutional and sophisticated investors to
raise $7.6 million (before costs) under a Placement of fully paid ordinary shares over two tranches at an issue
price of $0.10 per share (Placement).
Hancock Prospecting Pty Ltd agreed to participate in the Placement as a cornerstone investor, committing to
invest $2.65 million across the two tranches.
Tranche 1 of the Placement was completed on 21 September 2023 with funds received totalling $5.2 million.
Tranche 2 of the Placement ($2.4 million) is expected to be completed during the current quarter, pending
shareholder approval being obtained at the Company’s 2023 AGM on 22 November, alongside the approval
FOR the Director’s participation OF $225,000 in the Placement.
Funds are to be utilised to accelerate exploration drilling programmes at the KHLP and NLP.
Canaccord Genuity (Australia) Limited acted as Lead Manager to the Placement.
Future Battery Minerals Ltd
info@futurebatteryminerals.com.au
Suite 10, 38 Colin St, West Perth WA 6005
+61 8 6383 7817
ABN 91 148 966 545
futurebatteryminerals.com.au
ASX: FBM
Follow Us
11
September 2023 Quarter - ASX Announcements
This Quarterly Activities Report contains information extracted from ASX market announcements reported in
accordance with the 2012 edition of the “Australasian Code for Reporting of Exploration Results, Mineral
Resources and Ore Reserves” (2012 JORC Code). Further details (including 2012 JORC Code reporting
tables where applicable) of exploration results referred to in this Quarterly Activities Report can be found in the
following announcements lodged on the Company’s ASX platform:
17 Oct 2023
Kangaroo Hills High-Grade Lithium System Continues to Grow
03 Oct 2023
Resource Drilling Underway at Nevada Lithium Project
21 Sep 2023
Aggressive Lithium Exploration Programmes Continuing
12 Sep 2023
Further Spodumene Bearing Pegmatites Intercepted at KHLP
11 Sep 2023
Managing Director and CEO Appointment
24 Aug 2023
New Stacked Spodumene Bearing Pegmatites Confirmed at KHLP
11 Aug 2023
Acquisition of 20% Interest in Kangaroo Hills Completed
07 Aug 2023
FBM Acquires Remaining Interest in Kangaroo Hills
07 Aug 2023
LSR: Divestment of 20% Interest in Kangaroo Hills Lithium JV
04 Aug 2023
Large Scale Lithium Discovery Confirmed In Nevada
18 Jul 2023
Further High-Grade Lithium Results at Kangaroo Hills
13 Jul 2023
Potential Extensions to Li Claystone Identified in Nevada
These announcements are available for viewing on the Company’s website futurebatteryminerals.com.au/
under the Investors tab. Future Battery Minerals confirms that it is not aware of any new information or data
that materially affects the information included in any original ASX announcement.
This announcement has been authorised for release by the Board of Directors of Future Battery Minerals.
For further information please visit futurebatteryminerals.com.au/ or contact:
Nicholas Rathjen
CEO & Managing Director
E: nrathjen@futurebatteryminerals.com.au
T: +61 (08) 6383 7817
Robin Cox
Technical Director
E: rcox@futurebatteryminerals.com.au
T: +61 (08) 6383 7817
Future Battery Minerals Ltd
info@futurebatteryminerals.com.au
Suite 10, 38 Colin St, West Perth WA 6005
+61 8 6383 7817
ABN 91 148 966 545
futurebatteryminerals.com.au
ASX: FBM
Follow Us
12
Competent Persons Statement
The information in this report that relates to Exploration Results is based on and fairly represents information compiled by
Mr Robin Cox BSc (E.Geol), a Competent Person, who is a Member of the Australian Institute of Mining and Metallurgy.
Mr Cox is the Company’s Chief Geologist and has sufficient experience that is relevant to the style of mineralisation and
type of deposit under consideration and to the activity being undertaken to qualify as a Competent Person as defined in
the 2012 Edition of the Australasian Code for Reporting of Exploration Results, Mineral Resources and Ore Reserves. Mr
Cox consents to the inclusion in the announcement of the matters based on his information in the form and context in
which it appears.
The information in this release that relates to Mineral Resources is based on information compiled by Mr Shaun Searle
who is a Member of the Australasian Institute of Geoscientists. Mr Searle is an employee of Ashmore Advisory Pty Ltd and
independent consultant to Future Battery Minerals Limited. Mr Searle has sufficient experience, which is relevant to the
style of mineralisation and type of deposit under consideration and to the activity which he has undertaken to qualify as a
Competent Person as defined in the 2012 Edition of the ‘Australasian Code for the Reporting of Exploration Results,
Mineral Resources and Ore Reserves’. Mr Searle consents to the inclusion in this report of the matters based on this
information in the form and context in which it appears.
Forward-Looking Statements
This document may include forward-looking statements. Forward-looking statements include, but are not limited to,
statements concerning Future Battery Minerals Limited’s planned exploration program and other statements that are not
historical facts. When used in this document, the words such as "could," "plan," "estimate," "expect," "intend," "may”,
"potential", "should," and similar expressions are forward-looking statements. Although Future Battery Minerals Limited
believes that its expectations reflected in these forward-looking statements are reasonable, such statements involve risks
and uncertainties and no assurance can be given that actual results will be consistent with these forward-looking
statements.
Previously Reported Results
There is information in this announcement relating to exploration results which were previously announced on 20 March
2023, 13 April 2023, 22 June 2023, 4 July 2023, 13 July 2023, 18 July 2023, 4 August 2023, 11 August 2023, 24 August
2022, 3 October 2023, and 17 October 2023. Other than as disclosed in those announcements, the Company confirms
that it is not aware of any new information or data that materially affects the information included in the original market
announcements.
Future Battery Minerals Ltd
info@futurebatteryminerals.com.au
Suite 10, 38 Colin St, West Perth WA 6005
+61 8 6383 7817
ABN 91 148 966 545
futurebatteryminerals.com.au
ASX: FBM
Follow Us
13
APPENDIX 1 - INTEREST IN MINING TENEMENTS AND CAPITAL STRUCTURE
Interest in Mining Tenements in Australia
Tenement
Tenement ID
Status
Interest at
beginning
of Quarter
Interest
acquired or
disposed
Interest
at end of
Quarter
Arden
EL 5821
Granted
90%
-
90%
Arden North
EL 6217
Granted
100%
-
100%
Bonaventura
EL 5973
Granted
100%
-
100%
Bonaventura Extension
EL 6252
Granted
100%
-
100%
Torrens East Copper Project
ELA 00159
Pending
-
-
-
Torrens East Copper Project
EL 6331
Granted
100%
-
100%
Saints
M29/245
Granted
100%
-
100%
Saints
M29/246
Granted
100%
-
100%
Leinster (the Horn)
E36/899
Granted
100%
-
100%
Leinster (the Horn)
E36/1030
Granted
100%
-
100%
Leinster (Sinclair North)
E36/895
Granted
100%
-
100%
KHLP
P15/5738
Granted
100%
-
100%
KHLP
P15/5740
Granted
100%
-
100%
KHLP
P15/5741
Granted
100%
-
100%
KHLP
P15/5742
Granted
100%
-
100%
KHLP
P15/5743
Granted
100%
-
100%
KHLP
P15/5749
Granted
100%
-
100%
100%100%KHLP
P15/5963
Granted
100%
-
100%
KHLP
P15/5965
Granted
100%
-
100%
KHLP
M15/1887
Pending
-
-
-
KHLP
M15/1890
Pending
-
-
-
KHLP
E15/1828
Pending
-
-
-
KHLP
P15/6681
Pending
-
-
-
KHLP
P15/6796
Pending
-
-
-
Ngalbain
M15/1905
Pending
-
-
-
Ngalbain
P15/6813
Pending
-
-
-
Ngalbain
P15/6814
Pending
-
-
-
Ngalbain
P15/6815
Pending
-
-
-
Ngalbain
P15/6816
Pending
-
-
-
West Musgraves
E69/4100
Pending
-
-
-
West Musgraves
E69/4101
Pending
-
-
-
Saints
L29/0162
Pending
-
-
-
Saints
L29/0163
Pending
-
-
-
Future Battery Minerals Ltd
info@futurebatteryminerals.com.au
Suite 10, 38 Colin St, West Perth WA 6005
+61 8 6383 7817
ABN 91 148 966 545
futurebatteryminerals.com.au
ASX: FBM
Follow Us
14
Saints
L29/0164
Pending
-
-
-
Saints
L29/0165
Pending
-
-
-
Interest in Mining Tenements in Nevada, USA
Interest
acquired
or
disposed
Interest
at end of
Quarter
Project
Claim ID
Status
Interest at
beginning
of Quarter
Traction Project
FracE 1 to FracE 181
FracE 205 to 244
Registered
80%
-
80%
Heller Project
Heller 1 to Heller 15
Heller 25 to Heller 39
Heller 52 to Heller 66
Heller 89 to Heller 98
Heller 116 to 127
Heller 147 to Heller 155
Heller 173 Heller 178
Registered
80%
(80%)
-
Registered
80%
-
80%
San Antone Project
SA 1 to SA 34
SA 39 to 55
SA 60 to 77
SA 90 to SA 106
SA 115 to 131
SA 256 to SA 266
SA 281 to SA 291
SA 296 to SA 306
SA 316 to SA 326
SA 336 to SA 349
SA 359 to SA 375
SA 400 to SA 405
SA 412 to SA 417
SA 425 to SA 436
SA 444 to SA 455
SA 463 to SA 474
SA 486 to SA 494
SA 496 to SA 499
SA 501 to SA 504
Registered
80%
-
80%
San Antone East Project
SAE 1 to SAE 70
SAE 77 to SAE 81
Share your feedback
Discover