Shallow High-Grade Lithium Intercepts at Kangaroo Hills
Released
Released
Announcement PDF
16 November 2023
ASX ANNOUNCEMENT
FURTHER SHALLOW, HIGH-GRADE LITHIUM
INTERCEPTS AT KANGAROO HILLS
Highlights
Further batch of assay results received from expanded Phase 3 drill program broadens extent
of shallow mineralised system at Kangaroo Hills Lithium Project
Significant new assay results from Rocky Prospect include:
4m @ 1.37% Li2O from 25m (KHRC114)
4m @ 1.01% Li2O from 146m (Rocky) and 4m @ 1.34% Li2O from 9m (Big Red)
(KHDD009)
8m @ 0.83% Li2O from 127m (KHDD012)
4m @ 1.02% Li2O from 211m (Rocky) and 2m @ 1.27% Li2O from 23m (Big Red)
(KHRC095)
1m @ 1.85% Li2O from 8m and 1m @ 1.42% Li2O from 14m (KHRC094)
Select holes targeting extensions to the east, west and south of Big Red returned:
8m @ 0.91% Li2O from 34m, including 5m @ 1.21% Li2O from 37m (KHRC145)
3m @ 1.05% Li2O from 34m (KHDD008)
2m @ 1.29% Li2O from 6m (KHRC142)
Rocky drilling to date has defined a highly continuous mineralised system at shallow depths,
although thinner and of lower average grade than the standout Big Red Prospect.
Given its proximity to surface and Big Red, Rocky is expected to form a significant part of
any future development at Kangaroo Hills.
Both the Big Red and Rocky systems remain open along strike to the north and at depth.
Phase 3 drilling now completed; assays remain pending for 15 holes.
Permitting for drilling of Big Red strike extension, resource and regional targets north,
including the Western Grey and Quokka targets, continues to progress
Initial metallurgical program ongoing and expanded with discrete HLS and flotation streams;
full results expected Q1 CY2024.
Future Battery Minerals Ltd (ASX: FBM) (FBM or the Company) advises of assay results returned for the next
batch of holes from Phase 3 reverse circulation (RC) and diamond (DD) drilling at its 100% owned Kangaroo
Hills Lithium Project (KHLP) in Western Australia.
FBM Technical Director, Robin Cox, commented:
“Kangaroo Hills offers so many project advancement and development advantages given its excellent location
in the WA Goldfields, available road access, and proximity to substantial existing regional infrastructure. It is
Future Battery Minerals Ltd
info@futurebatteryminerals.com.au
Suite 10, 38 Colin St, West Perth WA 6005
+61 8 6383 7817
ABN 91 148 966 545
futurebatteryminerals.com.au
ASX: FBM
Follow Us
1
also surrounded by other substantial lithium deposits and mines that offer a ready perspective on what it might
become as a future project development.
“The latest round of RC results from Rocky have returned numerous shallow, high-grade lithium intercepts that
have significantly increased the overall size of this system. While not of the same thickness as the neighbouring
Big Red mineralised pegmatite, the Rocky system still offers significant potential contribution to future project
development scenarios at Kangaroo Hills.
“With the completion of the Phase 3 program at Kangaroo Hills, our focus now turns to the potential of the area
moving north from the Big Red and Rocky pegmatites. Both these systems remain wide open to the north –
and at depth – and several other regional target areas to the north demand prompt testing, including the highly
prospective Western Grey zone. We expect to be drilling in these northern areas upon receipt of final
permitting.”
Further assay results from Kangaroo Hills
Assays have been received for a further 53 holes from the Phase 3 RC and DD program at the KHLP (refer
Tables 1 and 2). The returned holes were predominantly focussed on grid drilling of the Rocky Prospect and
wide-spaced scout drilling of selected regional targets.
Big Red Prospect
Three holes targeting east-west extensions of Big Red were amongst this batch of assays intercepting:
•
8m @ 0.91% Li2O from 34m, including 5m @ 1.21% Li2O from 37m (KHRC145);
•
3m @ 1.05% Li2O from 34m (KHDD008); and
•
2m @ 1.29% Li2O from 6m (KHRC142).
These results have successfully further expanded Big Red and deliver additional confidence in the modelling
of the pegmatite. The results of scout drilling to the east of Big Red are expected in the next batch of assays
from Phase 3 drilling, which are anticipated to be returned in the next 4-6 weeks.
Rocky Prospect
Drilling at Rocky previously identified numerous pegmatites semi-parallel to the Big Red pegmatite. The visual
observations of spodumene within these pegmatites at Rocky led FBM to significantly expand the Phase 3 RC
and DD drilling programme.
Assay results returned from the next batch of Phase 3 holes drilled at Rocky (both RC and DD) have again
confirmed visual observations with numerous shallow high-grade intercepts (refer to Figures 1) including:
•
4m @ 1.34% Li2O from 9m (Big Red) and 4m @ 1.01% Li2O from 146m (Rocky) (KHDD009);
•
8m @ 0.83% Li2O from 127m, including 2m @ 1.24% Li2O from 127m (KHDD012);
•
6m @ 0.76% Li2O from 4m, including 1m @ 1.29% Li2O from 5m (KHRC093);
•
3m @ 0.93% Li2O from 7m, including 1m @ 1.85% Li2O from 8m, and 1m @ 1.42% Li2O from
14m (KHRC094);
•
2m @ 1.27% Li2O from 23m and 4m @ 1.02% Li2O from 211m (KHRC095);
•
2m @ 1.09% Li2O from 35m (KHRC099);
•
2m @ 0.80% Li2O from 112m (KHRC111);
•
5m @ 1.28% Li2O from 24m (KHRC114); and
•
6m @ 0.66% Li2O from 3m, including 1m @ 1.35% Li2O from 4m (KHRC133).
Future Battery Minerals Ltd
info@futurebatteryminerals.com.au
Suite 10, 38 Colin St, West Perth WA 6005
+61 8 6383 7817
ABN 91 148 966 545
futurebatteryminerals.com.au
ASX: FBM
Follow Us
2
Figure 1: KHLP – Big Red and Rocky Pegmatite System – recent drill hole results graded by maximum down
hole assay.
These results have significantly increased the scale of the Rocky mineralised system, which remains open
along strike to the north and at depth. The drilling conducted at Rocky to date has demonstrated a highly
continuous mineralised system at shallow depths, albeit thinner and of lower average grade than the standout
neighbouring Big Red pegmatite.
Future Battery Minerals Ltd
info@futurebatteryminerals.com.au
Suite 10, 38 Colin St, West Perth WA 6005
+61 8 6383 7817
ABN 91 148 966 545
futurebatteryminerals.com.au
ASX: FBM
Follow Us
3
Figure 2: KHLP - Cross Section – Drill line northing 65582655
The proximity of Rocky to both surface and Big Red means that it is expected to form a significant part
of any future development at Kangaroo Hills. Notwithstanding this significance, the planned DD tail program
to test for extension of the Rocky pegmatites at depth (including potential thickening) has been deferred.
Instead, the focus will shift to the next round of drilling activities, concentrating on the northern strike extension
of Big Red/Rocky and other regional targets.
Future Battery Minerals Ltd
info@futurebatteryminerals.com.au
Suite 10, 38 Colin St, West Perth WA 6005
+61 8 6383 7817
ABN 91 148 966 545
futurebatteryminerals.com.au
ASX: FBM
Follow Us
4
Figure 3: KHLP – Regional Targets Location Plan
Future Battery Minerals Ltd
info@futurebatteryminerals.com.au
Suite 10, 38 Colin St, West Perth WA 6005
+61 8 6383 7817
ABN 91 148 966 545
futurebatteryminerals.com.au
ASX: FBM
Follow Us
5
Metallurgical testwork
The initial metallurgical programme for Kangaroo Hills has been expanded to include additional sample
analysis on discrete HLS and flotation work streams. This work is being undertaken by lead metallurgical and
engineering consultant, Minsol Engineering. Full results of the expanded test work programme are expected
to be received in Q1 2024.
This announcement has been authorised for release by the Board of Directors of the Company.
-ENDFor further information visit www.futurebatteryminerals.com or contact:
Nicholas Rathjen
Robin Cox
CEO & Managing Director
Technical Director
E: nrathjen@futurebatteryminerals.com.au
E: rcox@futurebatteryminerals.com.au
Competent Persons Statement
The information in this announcement that relates to exploration results is based on and fairly represents information
compiled by Mr Robin Cox BSc (E.Geol), a Competent Person, who is a Member of the Australian Institute of Mining and
Metallurgy. Mr Cox is the Company’s Chief Geologist and has sufficient experience that is relevant to the style of
mineralisation and type of deposit under consideration and to the activity being undertaken to qualify as a Competent
Person as defined in the 2012 Edition of the Australasian Code for Reporting of Exploration Results, Mineral Resources
and Ore Reserves. Mr Cox consents to the inclusion in this announcement of the matters based on his information in the
form and context in which it appears.
Forward-Looking Statements
This document may include forward-looking statements. Forward-looking statements include, but are not limited to,
statements concerning Future Battery Minerals Limited’s planned exploration program and other statements that are not
historical facts. When used in this document, the words such as "could," "plan," "estimate," "expect," "intend," "may”,
"potential", "should," and similar expressions are forward-looking statements. Although Future Battery Minerals Limited
believes that its expectations reflected in these forward-looking statements are reasonable, such statements involve risks
and uncertainties and no assurance can be given that actual results will be consistent with these forward-looking
statements.
Previously Reported Results
There is information in this announcement relating to exploration results which were previously announced on 20 March
2023. Other than those disclosed in the announcement, the Company confirms that it is not aware of any new information
or data that materially affects the information included in the original market announcement.
Future Battery Minerals Ltd
info@futurebatteryminerals.com.au
Suite 10, 38 Colin St, West Perth WA 6005
+61 8 6383 7817
ABN 91 148 966 545
futurebatteryminerals.com.au
ASX: FBM
Follow Us
6
About Kangaroo Hills Lithium Project (KHLP) – 100%
The KHLP is a recent and exciting hard rock lithium discovery located in the Goldfields of Western Australia,
approximately 17km south of the major township of Coolgardie. Spodumene mineralisation within LithiumCaesium-Tantalum (LCT) pegmatites was discovered during regional exploration drilling of the Nepean Nickel
Project in late 2022. Exploration efforts to date have significantly expanded on these initial results, with two
subsequent rounds of drilling totalling 47 holes and over 6,000m. This drilling has identified the Big Red
Prospect, an outcropping, north-dipping pegmatite returning an intercept of 29m @ 1.36% Li2O from 38m 1,
and with spodumene identified as the dominant lithium mineral. Through the implementation of regional target
generative work involving mapping, geophysics and geochemistry, six additional high priority prospects have
been identified. These high priority prospects have the potential to host further LCT pegmatites.
The location of the KHLP provides significant advantages to FBM. Located on the doorstep of a premier mining
district, the Goldfields of Western Australia, and specifically Kalgoorlie (50km east of the KHLP), host a
professional mining and exploration workforce. This provides FBM with ready access to skilled labour and
regional infrastructure critical to the development of any future mining project. The Goldfields region is also a
notably lithium endowed province of Western Australia, with numerous operating and developing lithium
projects. Notably, the KHLP is only 30km west of the Mt Marrion Lithium Mine operated by Mineral Resources
(ASX: MRL). The KHLP site is accessible via a sealed road leading south from Coolgardie, ensuring FBM has
continuous access all year-round.
Figure 4 – KHLP Location Map
1
Refer to ASX Announcement on 20 March 2023 – LCT – Pegmatite Discovery Confirmed at Kangaroo Hills
Future Battery Minerals Ltd
info@futurebatteryminerals.com.au
Suite 10, 38 Colin St, West Perth WA 6005
+61 8 6383 7817
ABN 91 148 966 545
futurebatteryminerals.com.au
ASX: FBM
Follow Us
7
Table 1 – KHLP Significant Intercepts, Li2O >0.2%, Ta >50ppm, Cs >200ppm, [Max. 2m internal dilution]
Prospect
Hole ID
Fro
m
(m)
To
(m)
Interval
(m)
Big Red
KHDD008
34
37
3
Rocky
KHDD009
9
13
4
Rocky
KHDD009
41
42
1
Rocky
KHDD009
146
150
4
Rocky
KHDD009
148
149
1
Rocky
KHDD012
127
135
8
Rocky
KHDD012
128
130
2
Rocky
KHRC044
22
25
3
Rocky
KHRC044
22
23
1
Rocky
KHRC092
136
138
2
Rocky
KHRC093
4
10
6
Rocky
KHRC093
5
6
1
Rocky
KHRC094
7
10
3
Rocky
KHRC094
8
9
1
Rocky
KHRC094
13
16
3
Rocky
KHRC094
14
15
1
Rocky
KHRC094
192
197
5
Rocky
KHRC095
23
25
2
Rocky
KHRC095
23
24
1
Rocky
KHRC095
116
118
2
Rocky
KHRC095
211
215
4
Rocky
KHRC095
211
213
2
Rocky
KHRC096
227
228
1
Rocky
KHRC099
35
37
2
Rocky
KHRC099
36
37
1
Rocky
KHRC099
115
116
Rocky
KHRC099
202
Rocky
KHRC109
Rocky
Rocky
Li2O
%
Ta
ppm
Cs
ppm
Sn ppm
Intercept
1.05
48.35
101.63
35.38
3.0 @ 1.05 %
1.37
54.84
98.73
35.11
4m @ 1.37 %
0.97
51.2
41.2
37
1m @ 0.97 %
AT
INCLUDI
NG
AT
INCLUDI
NG
AT
INCLUDI
NG
AT
1.01
78.83
76.11
51.05
4m @ 1.01 %
1.68
68.3
70.9
47
1m @ 1.68 %
0.83
69.59
91.1
43.83
8 m @ 0.83 %
1.24
45.78
119
56.22
2m @ 1.24 %
0.84
36.67
60.4
25.33
3m @ 0.84 %
1.41
36.7
68.9
28
1m @ 1.41 %
0.53
39.1
59.8
28
2m @ 0.53 %
AT
INCLUDI
NG
AT
INCLUDI
NG
AT
INCLUDI
NG
AT
0.76
59.57
121.7
34.5
6m @ 0.76 %
1.29
44.9
125
39
1m @ 1.29 %
0.93
33.53
72.3
34.67
3m @ 0.93 %
1.85
44.7
83.8
51
1m @ 1.85 %
0.79
63.77
87.87
34.67
3m @ 0.79 %
1.42
89.5
46.9
49
1m @ 1.42 %
0.58
40.1
78.36
40
5m @ 0.58 %
AT
INCLUDI
NG
AT
1.27
69.6
66.7
36.5
2m @ 1.27 %
1.64
58.7
72.1
37
1m @ 1.64 %
0.32
2.2
51.1
3.5
2m @ 0.32 %
AT
INCLUDI
NG
AT
1.02
44.98
53.73
55.5
4m @ 1.02 %
1.49
38.25
47.3
60.5
2m @ 1.49 %
0.39
7.5
27.5
6
1m @ 0.39 %
1.01
38.75
87.35
30
2m @ 1.01 %
1.28
27.3
68.2
28
1m @ 1.28 %
1
AT
INCLUDI
NG
AT
0.31
7.7
14.1
11
1m @ 0.31 %
203
1
AT
0.31
96.2
27.1
26
1m @ 0.31 %
11
15
4
AT
0.67
5.83
42.08
3.75
4m @ 0.67 %
KHRC109
27
28
1
AT
0.51
2
27.1
9
1m @ 0.51 %
KHRC109
30
36
6
AT
0.42
3.22
137.75
14.67
6m @ 0.42 %
Rocky
KHRC109
61
66
5
AT
0.5
42.68
87.38
44
5m @ 0.5 %
Rocky
KHRC111
112
114
2
0.8
52.9
51.8
48
2m @ 0.8 %
Rocky
KHRC111
112
113
1
1.14
57.5
52.1
65
1m @ 1.14 %
Rocky
KHRC112
46
47
1
AT
INCLUDI
NG
AT
0.31
1.9
67.7
0
1m @ 0.31 %
Rocky
KHRC113
112
113
1
AT
0.35
0.8
19.8
0
1m @ 0.35 %
Type
AT
INCLUDI
NG
AT
Future Battery Minerals Ltd
info@futurebatteryminerals.com.au
Suite 10, 38 Colin St, West Perth WA 6005
+61 8 6383 7817
ABN 91 148 966 545
futurebatteryminerals.com.au
ASX: FBM
Follow Us
8
Rocky
KHRC114
24
29
5
1.28
92.36
95.24
42
5m @ 1.28 %
1.37
89.45
101.05
41
4m @ 1.37 %
1
AT
INCLUDI
NG
AT
Rocky
KHRC114
25
29
4
Rocky
KHRC114
31
32
Rocky
KHRC114
70
71
0.54
70.2
55.6
23
1m @ 0.54 %
1
AT
0.32
0.8
103
0
1m @ 0.32 %
Rocky
KHRC115
35
38
3
AT
0.61
75.9
78.8
34.33
3m @ 0.61 %
Rocky
KHRC115
46
47
1
AT
0.35
0.8
29.1
0
1m @ 0.35 %
Rocky
KHRC117
24
27
3
AT
0.78
64.7
87
40
3m @ 0.78 %
Rocky
KHRC117
146
149
3
AT
0.59
50.87
70.03
31.33
3m @ 0.59 %
Rocky
KHRC124
113
116
3
AT
0.37
47.37
839
76
3m @ 0.37 %
Rocky
KHRC130
15
17
2
AT
0.41
0.3
71.7
0
2m @ 0.41 %
Rocky
KHRC131
70
71
1
AT
0.33
2.2
58.7
7
1m @ 0.33 %
Rocky
KHRC133
3
9
6
0.66
86.22
90.87
38.83
6m @ 0.66 %
Rocky
KHRC133
4
5
4
1.35
54.5
123
51
4m @ 1.35 %
Rocky
KHRC134
53
55
2
AT
INCLUDI
NG
AT
0.35
0
277.5
16
2m @ 0.35 %
Rocky
KHRC137
46
48
2
AT
0.34
17.9
37.1
15.5
2m @ 0.34 %
Rocky
KHRC138
15
16
1
AT
0.37
3.1
35
12
1m @ 0.37 %
Rocky
KHRC138
23
25
2
AT
0.45
0.55
60.5
10
2m @ 0.45 %
Rocky
KHRC138
69
70
1
AT
0.31
0.5
498
12
1m @ 0.31 %
Rocky
KHRC142
1
2
1
AT
0.59
54.2
45.5
17
1m @ 0.59 %
Rocky
KHRC142
6
9
3
0.98
54.43
61.8
48.33
3m @ 0.98 %
Big Red
KHRC142
6
8
2
1.29
38.05
59.6
58
2m @ 1.29 %
Big Red
KHRC145
25
30
5
AT
INCLUDI
NG
AT
0.39
47.36
65.98
32.2
5m @ 0.39 %
Big Red
KHRC145
34
42
8
0.91
69.75
69.25
29.75
8m @ 0.91 %
Big Red
KHRC145
37
42
5
AT
INCLUDI
NG
1.21
57.38
79.54
35
5m @ 1.21 %
Future Battery Minerals Ltd
info@futurebatteryminerals.com.au
Suite 10, 38 Colin St, West Perth WA 6005
+61 8 6383 7817
ABN 91 148 966 545
futurebatteryminerals.com.au
ASX: FBM
Follow Us
9
Table 2 –– KHLP RC and DD drilling [Project MGA 94 UTM Zone 51] - Drillhole Location for Holes Reported In
This Release
Prospect
Hole ID
Hole Type
Eas�ng
(m)
Northing
(m)
RL
(m)
Dip
(deg)
Azimuth
(deg)
Max Depth
(m)
Assays
Received/
Pending
Big Red/Rocky
KHDD008
DDH
317795
6558265
409
-85
268
249.7
Assays Received
Big Red/Rocky
KHDD009
DDH
317781
6558207
410
-85
266
201
Assays Received
Big Red/Rocky
KHDD010
DDH
317676
6558054
397
-69
269
155.9
Assays Received
Big Red/Rocky
KHDD011
DDH
317790
6558072
401
-79
266
160
Assays Received
Big Red/Rocky
KHDD012
DDH
317704
6558159
404
-84
85
154.6
Assays Received
Big Red/Rocky
KHRC044
RC
317713
6558235
410
-90
0
198
Assays Received
Wallaroo
KHRC046
RC
318431
6557487
372
-90
0
150
Assays Received
Big Red/Rocky
KHRC053
RC
318343
6557661
376
-90
0
173
Assays Received
Quokka
KHRC055
RC
318308
6557747
377
-90
0
144
Assays Received
Big Red/Rocky
KHRC063
RC
317793
6557836
387
-90
0
150
Assays Received
Big Red/Rocky
KHRC069
RC
317551
6557673
391
-90
0
150
Assays Pending
Big Red/Rocky
KHRC073
RC
317031
6557151
392
-90
0
192
Assays Pending
Eastern Grey
KHRC074
RC
316885
6557115
403
-90
0
198
Assays Received
Pademelon
KHRC075
RC
316523
6557156
399
-90
0
264
Assays Received
Pademelon
KHRC076
RC
316588
6557347
400
-90
0
216
Assays Received
Wallaroo West
KHRC079
RC
316194
6557138
385
-90
0
192
Assays Received
Eastern Grey
KHRC080
RC
316547
6556866
403
-90
0
234
Assays Received
Big Red/Rocky
KHRC090
RC
317646
6558123
401
-90
0
180
Assays Received
Big Red/Rocky
KHRC092
RC
317456
6558014
395
-90
0
150
Assays Received
Big Red/Rocky
KHRC093
RC
317836
6558190
399
-90
0
150
Assays Received
Big Red/Rocky
KHRC094
RC
317695
6558208
408
-90
0
204
Assays Received
Big Red/Rocky
KHRC095
RC
317697
6558267
408
-90
0
276
Assays Received
Big Red/Rocky
KHRC096
RC
317635
6558235
408
-90
0
240
Assays Received
Wallaroo
KHRC097
RC
317538
6558241
402
-90
0
150
Assays Received
Wallaroo
KHRC098
RC
317467
6558224
398
-90
0
150
Assays Received
Wallaroo
KHRC099
RC
317750
6558299
408
-90
0
204
Assays Received
Wallaroo
KHRC100
RC
318262
6557994
383
-90
0
138
Assays Received
Wallaroo West
KHRC101
RC
318365
6557985
382
-90
0
150
Assays Received
Pademelon
KHRC102
RC
318184
6557921
382
-90
0
150
Assays Received
Big Red/Rocky
KHRC103
RC
317627
6557908
397
-90
0
96
Assays Received
Big Red/Rocky
KHRC104
RC
317471
6557911
389
-90
0
120
Assays Received
Big Red/Rocky
KHRC105
RC
317549
6557947
391
-90
0
120
Assays Received
Big Red/Rocky
KHRC106
RC
317468
6557954
390
-90
0
120
Assays Received
Eastern Grey
KHRC107
RC
317408
6557950
390
-90
0
120
Assays Received
Eastern Grey
KHRC108
RC
317601
6558004
393
-65
91
66
Assays Received
Big Red/Rocky
KHRC109
RC
317478
6557986
393
-59
89
138
Assays Received
Big Red/Rocky
KHRC110
RC
317389
6557992
393
-90
0
102
Assays Received
Big Red/Rocky
KHRC111
RC
317546
6558062
393
-60
90
144
Assays Received
Big Red/Rocky
KHRC112
RC
317394
6558055
395
-65
92
122
Assays Received
Future Battery Minerals Ltd
info@futurebatteryminerals.com.au
Suite 10, 38 Colin St, West Perth WA 6005
+61 8 6383 7817
ABN 91 148 966 545
futurebatteryminerals.com.au
ASX: FBM
Follow Us
10
Big Red/Rocky
KHRC113
RC
317639
6558110
401
-64
91
132
Assays Received
Eastern Grey
KHRC114
RC
317709
6558076
400
-56
90
84
Assays Received
Eastern Grey
KHRC115
RC
317735
6558103
404
-60
91
84
Assays Received
Eastern Grey
KHRC116
RC
317624
6558151
403
-90
0
162
Assays Received
Big Red/Rocky
KHRC117
RC
317778
6558231
410
-65
93
174
Assays Received
Big Red/Rocky
KHRC118
RC
318269
6558299
389
-90
0
150
Assays Received
Big Red/Rocky
KHRC119
RC
318428
6558299
387
-90
0
147
Assays Received
Big Red/Rocky
KHRC120
RC
318584
6558277
383
-90
0
150
Assays Received
Big Red/Rocky
KHRC121
RC
318429
6558158
383
-90
0
150
Assays Received
Big Red/Rocky
KHRC122
RC
318588
6558145
382
-90
0
156
Assays Received
Big Red/Rocky
KHRC123
RC
316138
6557478
387
-90
0
150
Assays Received
Big Red/Rocky
KHRC124
RC
316269
6557349
388
-90
0
150
Assays Received
Big Red/Rocky
KHRC125
RC
316242
6557556
392
-90
0
150
Assays Received
Eastern Grey
KHRC126
RC
317718
6557907
391
-90
0
90
Assays Received
Eastern Grey
KHRC127
RC
317628
6557948
396
-90
0
102
Assays Received
Eastern Grey
KHRC128
RC
317706
6557947
395
-90
0
78
Assays Received
Eastern Grey
KHRC129
RC
317789
6557948
396
-90
0
60
Assays Received
Wallaroo West
KHRC130
RC
317788
6557984
397
-90
0
60
Assays Received
Wallaroo West
KHRC131
RC
317397
6558025
395
-90
0
156
Assays Received
Big Red/Rocky
KHRC132
RC
317580
6558029
395
-90
0
102
Assays Received
Big Red/Rocky
KHRC133
RC
317670
6558028
396
-90
0
78
Assays Received
Big Red/Rocky
KHRC134
RC
317739
6558030
400
-90
0
78
Assays Received
Big Red/Rocky
KHRC135
RC
317808
6558034
399
-90
0
78
Assays Received
Big Red/Rocky
KHRC136
RC
317473
6558071
397
-90
0
150
Assays Received
Big Red/Rocky
KHRC137
RC
317543
6558100
394
-90
0
186
Assays Received
Big Red/Rocky
KHRC138
RC
317611
6558198
405
-90
0
150
Assays Received
Big Red/Rocky
KHRC139
RC
317600
6558258
405
-90
0
150
Assays Received
Big Red/Rocky
KHRC140
RC
317949
6558113
391
-90
0
54
Assays Received
Big Red/Rocky
KHRC141
RC
318027
6558112
387
-90
0
48
Assays Received
Eastern Grey
KHRC142
RC
317927
6558191
393
-90
0
43
Assays Received
Eastern Grey
KHRC143
RC
318027
6558202
393
-90
0
48
Assays Pending
Wallaroo
KHRC144
RC
318108
6558204
394
-90
0
48
Assays Pending
Pademelon
KHRC145
RC
317949
6558261
397
-90
0
60
Assays Received
Wallaroo West
KHRC146
RC
318027
6558260
396
-90
0
48
Assays Pending
Big Red/Rocky
KHRC147
RC
318110
6558270
398
-90
0
48
Assays Pending
Wallaroo
KHRC148
RC
318270
6558147
384
-90
0
102
Assays Pending
Big Red/Rocky
KHRC149
RC
317455
6558018
395
-56
82
150
Assays Pending
Big Red/Rocky
KHRC150
RC
317800
6558264
408
-65
91
180
Assays Pending
Big Red/Rocky
KHRC151
RC
318269
6558065
382
-90
0
118
Assays Received
Big Red/Rocky
KHRC152
RC
318189
6558068
385
-90
0
138
Assays Received
Big Red/Rocky
KHRC153
RC
317083
6557479
390
-90
0
122
Assays Pending
Big Red/Rocky
KHRC154
RC
317237
6557482
388
-90
0
102
Assays Pending
Big Red/Rocky
KHRC155
RC
317384
6557486
387
-90
0
84
Assays Pending
Wallaroo
KHRC156
RC
317541
6557486
382
-90
0
102
Assays Pending
Future Battery Minerals Ltd
info@futurebatteryminerals.com.au
Suite 10, 38 Colin St, West Perth WA 6005
+61 8 6383 7817
ABN 91 148 966 545
futurebatteryminerals.com.au
ASX: FBM
Follow Us
11
Wallaroo
KHRC157
RC
317703
6557489
383
-90
0
102
Assays Received
Wallaroo
KHRC158
RC
317547
6557146
383
-90
0
108
Assays Pending
Wallaroo
KHRC159
RC
317817
6556713
374
-90
0
132
Assays Received
Wallaroo
KHRC160
RC
316348
6557269
390
-90
0
144
Assays Pending
Wallaroo West
KHRC161
RC
316271
6557269
388
-90
0
150
Assays Received
Future Battery Minerals Ltd
info@futurebatteryminerals.com.au
Suite 10, 38 Colin St, West Perth WA 6005
+61 8 6383 7817
ABN 91 148 966 545
futurebatteryminerals.com.au
ASX: FBM
Follow Us
12
JORC Code, 2012 Edition, Table 1 (Kangaroo Hills Lithium Project)
Section 1: Sampling Techniques and Data
CRITERIA
Sampling
techniques
EXPLANATION
● Nature and quality of sampling (eg cut
channels, random chips, or specific
specialised industry standard
measurement tools appropriate to the
minerals under investigation, such as
down hole gamma sondes, or handheld
XRF instruments, etc). These examples
should not be taken as limiting the broad
meaning of sampling.
● Include reference to measures taken to
ensure sample representivity and the
appropriate calibration of any
measurement tools or systems used.
● Aspects of the determination of
mineralisation that are Material to the
Public Report. In cases where ‘industry
standard’ work has been done this would
be relatively simple (eg ‘reverse circulation
drilling was used to obtain 1m samples
from which 3kg was pulverised to produce
a 30g charge for fire assay’). In other
cases more explanation may be required,
such as where there is coarse gold that
has inherent sampling problems. Unusual
commodities or mineralisation types (eg
submarine nodules) may warrant
disclosure of detailed information.
COMMENTARY
Drilling
Future Battery Minerals Limited (FBM):
● Lithium-Caesium-Tantalum (LCT)
mineralisation at the Kangaroo Hills Lithium
Project (KHLP) has been sampled from the
following drilling techniques.
● Reverse circulation (RC) drilling creates
1m samples of pulverised chips,
approximately 3kg’s is collected in
individual calico bags
● Diamond core drilling (DD) reported is yet
to be sampled. Sampling will be conducted
on quarter core in order to preserve bulk
sample for metallurgical test work.
● Rock Chip samples are collected from out
crop, sub crop in the field.
Air Magnetic Survey
Contractor: UTS
Client: St Francis Mining Ltd
Year: 1996
Aircraft: Fletcher
Instrumentation: Cesium Vapour
Sample Interval: ~5m
Flight Line Spacing: 50 and 100m
Flight Line Direction: 068o-248o, 158o-338o,
090o-270o
Tie Line Spacing: 500m and 1000m
Mean Terrain Clearance: 25m
Navigation: Differential GPS
IP Parameters
Contractor: Vortex Geophysics
Receiver: 1-2x GDD 16 channel IP Receiver
Transmitter: Vortex VIP-30 transmitter system
rated at 1500V, 30A and 15KVA
Configuration: Dipole-Dipole
Line Spacing: 200m
Dipole spacing: 100m
Domain/Cycle: Time domain – 2 seconds or
0.125Hz
Drilling
techniques
Drill sample
recovery
●
●
●
●
Drill type (eg core, reverse circulation,
open-hole hammer, rotary air blast, auger,
Bangka, sonic, etc) and details (eg core
diameter, triple or standard tube, depth of
diamond tails, face- sampling bit or other
type, whether core is oriented and if so, by
what method, etc).
Method of recording and assessing core
and chip sample recoveries and results
assessed.
Measures taken to maximise sample
recovery and ensure representative nature
of the samples.
Whether a relationship exists between
sample recovery and grade and whether
sample bias may have occurred due to
FBM:
•
RC drilling was conducted on reported
results in this announcement
•
HQ Diamond Core drilling is reported in this
announcement.
FBM.
•
Sample recovery is noted in the field for
each individual sample. Sample is
collected via a cyclone and cone splitter
attached to the drill rig, which is
considered standard for RC sampling.
•
Diamond core recovery is recorded by
both the drilling contractors and
measured by FBM geologists
Future Battery Minerals Ltd
info@futurebatteryminerals.com.au
Suite 10, 38 Colin St, West Perth WA 6005
+61 8 6383 7817
ABN 91 148 966 545
futurebatteryminerals.com.au
ASX: FBM
Follow Us
13
CRITERIA
Logging
EXPLANATION
preferential loss/gain of fine/coarse
material.
●
●
●
Sub-sampling
techniques and
sample
preparation
●
●
●
●
●
●
Quality of assay
data and
laboratory tests
●
●
●
COMMENTARY
•
No relationship between sample recovery
and grade has been yet observed and no
sample bias is believed to have occurred.
Whether core and chip samples have been
geologically and geotechnically logged to a
level of detail to support appropriate
Mineral Resource estimation, mining
studies and metallurgical studies.
Whether logging is qualitative or
quantitative in nature. Core (or costean,
channel, etc) photography.
The total length and percentage of the
relevant intersections logged.
FBM:
•
Drill chips are lithologically logged by
Geologists in the field
•
Logging is qualitative, recording rock type
and mineral abundance
•
Logging of RC chips is conducted on a 1
metre sample size.
•
Core is logged lithologically by Geologists
in the field.
•
Natural changes in mineral abundance
are recorded
If core, whether cut or sawn and whether
quarter, half or all core taken.
If non-core, whether riffled, tube sampled,
rotary split, etc and whether sampled wet
or dry.
For all sample types, the nature, quality
and appropriateness of the sample
preparation technique.
Quality control procedures adopted for all
sub-sampling stages to maximise
representivity of samples.
Measures taken to ensure that the
sampling is representative of the in-situ
material collected, including for instance
results for field duplicate/second-half
sampling.
Whether sample sizes are appropriate to
the grain size of the material being
sampled.
The nature, quality and appropriateness of
the assaying and laboratory procedures
used and whether the technique is
considered partial or total.
For geophysical tools, spectrometers,
handheld XRF instrument
Share your feedback
Discover