Highlights
Assay results returned from Phase 3 diamond (DD) drilling at the Nevada Lithium Project
(NLP) confirm a significant extension to the depth of high-grade mineralisation (up to a
further 37 metres downhole).
The three Phase 3 DD holes completed at the Lone Mountain prospect twinned three
previous Reverse Circulation (RC) holes to test for continuation of the stratigraphic host
unit in which the original RC holes terminated.
All three Phase 3 DD holes returned thick, continuous, high-grade intervals, with two
remaining within the lithium claystone mineralisation at end-of-hole.
Significant intercepts returned from the Phase 3 DD include:
226m @ 855 ppm Li from 140m (WF23-011C)
148m @ 795 ppm Li from 152m (WF23-009C)
Including 66m @ 1,001 ppm Li from 216m
Including 60m @ 918 ppm Li from 191m
180m @ 818 ppm Li from 40m (WF23-015C)
Including 51m @ 915 ppm Li from 53m; and
–
23m @ 1,081 ppm Li from 182m.
Holes WF23-015C and WF23-011C also returned an uplift in Li grade when compared to the
previously drilled RC equivalents, with a 14% and 7% improvement observed, respectively.
Phase 3 RC drilling, comprising six holes for 1,177m, is also now complete, with the program
focussed on the open and shallower interpreted strike over 2.7km to the south of Lone
Mountain.
All Phase 3 RC holes intercepted the host Siebert Formation, with assay results expected to
be returned in coming 3-4 weeks.
Declaration of a maiden Mineral Resource for the NLP remains on schedule for Q1 CY2024.
The NLP is located near the mining hub of Tonopah, Nevada, within a premier global mining
district that is home to other advanced lithium claystone projects such as Rhyolite Ridge
(ASX: INR), TLC (TSX: LI) and Thacker Pass (TSX: LAC). The NLP is strategically located,
adjacent to American Battery Technology Company’s Tonopah Flats Lithium Project and
American Lithium Corp’s (TSX.V: LI) TLC Lithium Project.
Future Battery Minerals Ltd
info@futurebatteryminerals.com.au
Suite 10, 38 Colin St, West Perth WA 6005
+61 8 6383 7817
ABN 91 148 966 545
futurebatteryminerals.com.au
ASX: FBM
Follow Us
1
Future Battery Minerals Limited (ASX: FBM) (FBM or the Company) advises that assays have been returned
from Phase 3 DD drilling at the Nevada Lithium Project (NLP) (80% FBM) in Nevada, U.S. Results confirm an
extension of the mineralised structure previously intercepted in previous RC drilling. Phase 3 DD and RC
drilling (now complete) is designed to inform the definition of a maiden Mineral Resource Estimate (MRE),
which remains on schedule for delivery during Q1 CY2024.
FBM Technical Director, Robin Cox, commented:
“These DD drill results successfully confirm a significant extension to the depth of mineralisation past that
encountered in our previous RC program. Encouragingly, the DD assays also returned positive grade variability
compared to the previous assays from RC samples – driven directly by improved sample quality. With drilling
to date at Lone Mountain yet to intercept bedrock, there is now compelling evidence that the host Siebert
Formation’s lithium mineralisation is thicker, more continuous and higher grade than previously indicated.
“Our Phase 3 Mineral Resource drilling program has now concluded, with six RC holes completed through
December and early January; those assays are pending. Final results from the Phase 3 drilling are set to
inform the declaration of maiden Mineral Resource Estimate for the NLP during Q1 CY2024. We look forward
to reaching this milestone and demonstrating the scale and opportunity that exists at the NLP, particularly
given the broader regional context in which it is sited.”
Maiden Mineral Resource Estimate (MRE) drilling at Lone Mountain
Phase 3 DD program
Phase 3 diamond drilling completed at Lone Mountain late last year comprised three holes for 1,121 metres.
The program was designed to extend, at depth, lithium mineralisation intercepted in previous RC drilling with
the objective of drilling through the Li-bearing claystone into the bedrock sequence below the basin.
Future Battery Minerals Ltd
info@futurebatteryminerals.com.au
Suite 10, 38 Colin St, West Perth WA 6005
+61 8 6383 7817
ABN 91 148 966 545
futurebatteryminerals.com.au
ASX: FBM
Follow Us
2
Figure 1: Lone Mountain drill hole locations
All three holes successfully twinned their existing RC hole and greatly extended lithium claystone
mineralisation in the sequence of host Siebert Formation (including to end-of-hole in two of the three).
Moreover, bedrock was not finally intercepted in any holes by target depth. This demonstrates that the host
Siebert formation is much thicker than previously anticipated and highlights the potential for continuity of
mineralised thicknesses up-dip to the south (the subject of the recently completed RC drilling).
Assay results from the Phase 3 DD also returned a positive grade differential compared to the previously
announced RC hole samples in two of the three twinned holes, owing to improved sample quality. Holes WF23011C and WF23-015C showed a 14% and 7% observed uplift, respectively.
Future Battery Minerals Ltd
info@futurebatteryminerals.com.au
Suite 10, 38 Colin St, West Perth WA 6005
+61 8 6383 7817
ABN 91 148 966 545
futurebatteryminerals.com.au
ASX: FBM
Follow Us
3
Significant intercepts from the Phase 3 DD assays include:
226m @ 855 ppm Li from 140m (WF23-011C)
148m @ 795 ppm Li from 152m (WF23-009C)
Including 66m @ 1,001 ppm Li from 216m
Including 60m @ 918 ppm Li from 191m
180m @ 818 ppm Li from 40m (WF23-015C)
Including 51m @ 915 ppm Li from 53m ; and
–
23m @ 1,081 ppm Li from 182m.
Additional deeper,
lower-grade lithium claystone intervals were intercepted in WF23-015C, including:
19.5m @ 501 ppm Li from 370m
13.5m @ 518 ppm Li from 401m
19.5m @ 370 ppm Li from 429m
These intervals are currently interpreted to continue south, however recent drilling has specifically targeted
potential shallowing of the high grade seams.
Figure 2: NLP Prospects – Phase 3 (Resource drilling) drill hole locations
Future Battery Minerals Ltd
info@futurebatteryminerals.com.au
Suite 10, 38 Colin St, West Perth WA 6005
+61 8 6383 7817
ABN 91 148 966 545
futurebatteryminerals.com.au
ASX: FBM
Follow Us
4
Phase 3 RC program
The host formation of the lithium claystone mineralisation at Lone Mountain, the Siebert Formation, is
interpreted to become progressing shallower moving south from the known mineralisation at Lone Mountain,
over a further 2km, where it is then observed to outcrop in various places.
Recently completed Phase 3 RC drilling at the NLP comprised six holes for 1,177m, which were designed
predominantly to test the southern strike extent of the shallow Lone Mountain deposit. Drilling also tested for
higher-grade zones (+1,000 ppm Li) within the shallow claystone.
All six holes intercepted the host Siebert Formation, including LM23-002 intercepting it from surface. All RC
samples have been submitted to the laboratory, with assay results expected to be returned in the coming
weeks.
Figure 3: RC drilling at the Lone Mountain prospect (December 2023)
Future Battery Minerals Ltd
info@futurebatteryminerals.com.au
Suite 10, 38 Colin St, West Perth WA 6005
+61 8 6383 7817
ABN 91 148 966 545
futurebatteryminerals.com.au
ASX: FBM
Follow Us
5
Maiden NLP Mineral Resource Estimate (MRE)
Stantec Consulting (Stantec) has been appointed to undertake the maiden MRE for the NLP. Stantec has
relevant expertise and substantial experience in the specific lithium claystone mineralisation found at the NLP.
Declaration of the maiden MRE remains on track for Q1 CY2024, following receipt and incorporation of all
Phase 3 program assay results.
Table 1: Drill Hole Location Table
Hole ID
EASTING
(m)
NORTHING
(m)
RL (m)
WF23-011C
462633
4219352
1512
Max
Depth
(m)
366
WF23-015C
463120
4218565
1518
WF23-009C
465192
4218944
LM23-001
LM23-002
LM23-003
LM23-004
LM23-005
LM23-006
463110
463121
463478
463571
462630
463208
4218091
4217161
4216674
4217614
4217640
4215851
Dip
(degrees)
Assays
Azimuth
Received/Pending
(degrees)
-90
0
Assays received
454
-90
0
Assays received
1512
244
-90
0
Assays received
1524
1548
1549
1530
1536
1570
189
229
213
198
165
183
-90
0
Assays pending
-90
0
Assays pending
-90
0
Assays pending
-90
0
Assays pending
-90
0
Assays pending
-90
0
Assays pending
Table 2: Phase 3 diamond drill hole results
Hole ID
Depth
from (m)
Depth to
(m)
WF23-009C
152
300
WF23-011C
WF23-015C
140
366
40
219
370
389
401
415
Interval
(m)
148
226
180
19
14
Li (ppm)
795
855
818
Significant Intercept and Geological
Comment
148m @ 795ppm Li from 152m
including 60m @ 918ppm Li from 191m
226m @ 855ppm Li from 140m
Including 66m @ 1001ppm from 216m
180m @ 818ppm Li from 40m
Including 51m @ 915ppm from 73m
& 23m @ 1081ppm from 182m
501
20m @ 501ppm from 370m
518
13.5m @ 518ppm from 401m
Regional targets
At conclusion of the Phase 3 drilling at Lone Mountain, the NLP still hosts significant exploration upside.
Regional prospects, Traction, San Antone West and North, still remain untested and are located within
valley/caldera settings which potentially host further lithium claystone mineralisation. FBM will look to schedule
early-stage exploration of these regional prospects following the completion of the maiden MRE.
Future Battery Minerals Ltd
info@futurebatteryminerals.com.au
Suite 10, 38 Colin St, West Perth WA 6005
+61 8 6383 7817
ABN 91 148 966 545
futurebatteryminerals.com.au
ASX: FBM
Follow Us
6
About the Nevada Lithium Project (NLP) (80% FBM)
The NLP comprises over 90km2 of tenure that is considered highly prospective for larger sedimentary-hosted
lithium deposits.
The region is home to several large sedimentary-hosted lithium deposits including Ioneer Resources’ (ASX:
INR) Rhyolite Ridge and American Lithium Corporation’s (TSX.V: LI) (US OTC: LIACF) (Frankfurt: 5LA1) TLC
Lithium Project. Albemarle Corporation’s (NYSE: ALB) Silver Peak Lithium Mine, currently the only producing
lithium mine in North America, lies approximately 45 km to the west of the NLP.
Figure 4: Lone Mountain Lithium Project location map including neighbouring reported resources.
Future Battery Minerals Ltd
info@futurebatteryminerals.com.au
Suite 10, 38 Colin St, West Perth WA 6005
+61 8 6383 7817
ABN 91 148 966 545
futurebatteryminerals.com.au
ASX: FBM
Follow Us
7
The Phase 1 2,900m RC drilling programme was completed in March 2023, successfully discovering lithiumbearing claystone lithologies of the Siebert Formation, highlighted by the intercept of 109.7m @ 766ppm Li
from 135.6m WF23-011 1. Significantly, thick, high-grade lithium–claystone was intersected in three additional
drill holes at the Western Flats Prospect (now part of the broader Lone Mountain Prospect to the south).
The Phase 2 drilling programme in July 2023 successfully intercepted thick, shallow lithium mineralisation at
the Lone Mountain Prospect with results including 2:
179.8m @ 766ppm from 39.6m (WF23-015)
Including 19.8m @ 1,010ppm from 80.8m
170.7m @ 764ppm Li from 67.1m to end of hole (WF23-014)
Including 27.4m 1,030ppm Li from 112.8m
Phase 3 drilling (this announcement) successfully confirmed the extension of mineralisation and the
continuation of the Siebert Formation stratigraphic host unit. Significant intercepts included:
226m @ 855 ppm Li from 140m (WF23-011C)
148m @ 795 ppm Li from 152m (WF23-009C)
Including 66m @ 1,001 ppm Li from 216m
Including 60m @ 918 ppm Li from 191m
180m @ 818 ppm Li from 40m (WF23-015C)
Including 51m @ 915 ppm Li from 53m ; and
–
1
2
23m @ 1,081 ppm from 182m.
Refer to ASX Announcement on 13 April 2023, “High Grade Lithium Claystone Discovered in Nevada”.
Refer to ASX Announcement on 4 August 2023, “Large Scale Lithium Discovery Confirmed in Nevada”.
Future Battery Minerals Ltd
info@futurebatteryminerals.com.au
Suite 10, 38 Colin St, West Perth WA 6005
+61 8 6383 7817
ABN 91 148 966 545
futurebatteryminerals.com.au
ASX: FBM
Follow Us
8
Figure 5: Location of NLP prospects
Future Battery Minerals Ltd
info@futurebatteryminerals.com.au
Suite 10, 38 Colin St, West Perth WA 6005
+61 8 6383 7817
ABN 91 148 966 545
futurebatteryminerals.com.au
ASX: FBM
Follow Us
9
This announcement has been authorised for release by the Board of Directors of the Company.
-ENDFor further information visit www.futurebatteryminerals.com or contact:
Nicholas Rathjen
Managing Director
E: nrathjen@futurebatteryminerals.com.au
Robin Cox
Technical Director
E: rcox@futurebatteryminerals.com.au
Competent Persons Statement
The information in this announcement that relates to exploration results is based on and fairly represents information
compiled by Mr Robin Cox BSc (E.Geol), a Competent Person, who is a Member of the Australian Institute of Mining and
Metallurgy. Mr Cox is the Company’s Chief Geologist and has sufficient experience that is relevant to the style of
mineralisation and type of deposit under consideration and to the activity being undertaken to qualify as a Competent
Person as defined in the 2012 Edition of the Australasian Code for Reporting of Exploration Results, Mineral Resources
and Ore Reserves. Mr Cox consents to the inclusion in this announcement of the matters based on his information in the
form and context in which it appears.
Forward-Looking Statements
This document may include forward-looking statements. Forward-looking statements include, but are not limited to,
statements concerning Future Battery Minerals Limited’s planned exploration program and other statements that are not
historical facts. When used in this document, the words such as "could," "plan," "estimate," "expect," "intend," "may”,
"potential", "should," and similar expressions are forward-looking statements. Although Future Battery Minerals Limited
believes that its expectations reflected in these forward-looking statements are reasonable, such statements involve risks
and uncertainties and no assurance can be given that actual results will be consistent with these forward-looking
statements.
Previously Reported Results
There is information in this announcement relating to exploration results which were previously announced on 13 Apil 2023
and 4 August 2023. Other than those disclosed in the announcement, the Company confirms that it is not aware of any
new information or data that materially affects the information included in the original market announcement.
Future Battery Minerals Ltd
info@futurebatteryminerals.com.au
Suite 10, 38 Colin St, West Perth WA 6005
+61 8 6383 7817
ABN 91 148 966 545
futurebatteryminerals.com.au
ASX: FBM
Follow Us
10
JORC Code, 2012 Edition, Table 1
Section 1: Sampling Techniques and Data
CRITERIA
Sampling
techniques
EXPLANATION
●
●
●
Drill sample
recovery
●
●
●
Logging
●
●
Nature and quality of sampling (eg cut
channels, random chips, or specific
specialised industry standard
measurement tools appropriate to the
minerals under investigation, such as
down hole gamma sondes, or handheld
XRF instruments, etc). These examples
should not be taken as limiting the broad
meaning of sampling.
Include reference to measures taken to
ensure sample representivity and the
appropriate calibration of any
measurement tools or systems used.
Aspects of the determination of
mineralisation that are Material to the
Public Report. In cases where ‘industry
standard’ work has been done this would
be relatively simple (eg ‘reverse circulation
drilling was used to obtain 1m samples
from which 3kg was pulverised to produce
a 30g charge for fire assay’). In other
cases more explanation may be required,
such as where there is coarse gold that
has inherent sampling problems. Unusual
commodities or mineralisation types (eg
submarine nodules) may warrant
disclosure of detailed information.
Method of recording and assessing core
and chip sample recoveries and results
assessed.
Measures taken to maximise sample
recovery and ensure representative nature
of the samples.
Whether a relationship exists between
sample recovery and grade and whether
sample bias may have occurred due to
preferential loss/gain of fine/coarse
material.
Whether core and chip samples have
been geologically and geotechnically
logged to a level of detail to support
appropriate Mineral Resource estimation,
mining studies and metallurgical studies.
Whether logging is qualitative or
quantitative in nature. Core (or costean,
COMMENTARY
RC Drilling Samples
•
RC drill Samples create a 1.5m down
hole sample; and
•
Sample weights range between 3-5kg
DD Core Samples
•
DD core samples were sampled on a
minimum length of 0.5m and maximum of
1.5m.
•
Sample weights range between 1.5-5kg
RC Drilling.
•
Sample recovery is noted in the field for
each individual sample and weighed at
the laboratory during sample preparation.
Sample is collected via a cyclone and
splitter attached to the drill rig, which is
considered standard for RC sampling.
•
No relationship between sample recovery
and grade has been yet observed and no
sample bias is believed to have occurred.
•
Investigation of grade variabililty between
RC and DD sample will be conducted
when core assays are received.
DD Drilling.
Sample recovery is noted in the field for
each individual sample and weighed at the
laboratory during sample preparation.
•
No relationship between sample recovery
and grade has been yet observed and no
sample bias is believed to have occurred.
Future Battery Minerals Limited (FBM):
•
Drill chips and core are lithologically
logged by Geologists in the field;
•
Logging is qualitative, recording rock type
and mineral abundance; and
•
Logging of RC chips is conducted on a
1.5 metre sample size.
Future Battery Minerals Ltd
info@futurebatteryminerals.com.au
Suite 10, 38 Colin St, West Perth WA 6005
+61 8 6383 7817
ABN 91 148 966 545
futurebatteryminerals.com.au
ASX: FBM
Follow Us
11
CRITERIA
EXPLANATION
●
Sub-sampling
techniques and
sample
preparation
●
●
●
●
●
Quality of assay
data and
laboratory tests
●
●
●
Verification of
sampling and
assaying
●
●
●
●
Location of data
points
●
●
●
channel, etc) photography.
The total length and percentage of the
relevant intersections logged.
COMMENTARY
•
Logging of core is conducted on
lithological breaks.
If non-core, whether riffled, tube sampled,
rotary split, etc and whether sampled wet
or dry.
For all sample types, the nature, quality
and appropriateness of the sample
preparation technique.
Quality control procedures adopted for all
sub-sampling stages to maximise
representivity of samples.
Measures taken to ensure that the
sampling is representative of the in-situ
material collected, including for instance
results for field duplicate/second-half
sampling.
Whether sample sizes are appropriate to
the grain size of the material being
sampled.
RC Chip Samples
•
1.5m RC percussion, sample is split via a
cyclone and splitter attached to the drill
rig to produce a bagged 3-5kg sample.
•
Certified reference material and blank
material are inserted every 20 samples as
per company QA/QC procedure for RC.
•
Field duplicates collected from the
Cyclone and cone splitter are inserted
every 60 samples
•
No further sub sampling has been
conducted
DD Core Samples
•
Core samples are marked and cut in the
field producing half core samples.
•
Certified reference material and blank
material are inserted every 20 samples as
per company QA/QC procedure for DD.
•
No further sub sampling has been
conducted
The nature, quality and appropriateness of
the assaying and laboratory procedures
used and whether the technique is
considered partial or total.
For geophysical tools, spectrometers,
handheld XRF instruments, etc, the
parameters used in determining the
analysis including instrument make and
model, reading times, calibrations factors
applied and their derivation, etc.
Nature of quality control procedures
adopted (eg standards, blanks, duplicates,
external laboratory checks) and whether
acceptable levels of accuracy (i.e. lack of
bias) and precision have been established.
The verification of significant intersections
by either independent or alternative
company personnel.
The use of twinned holes.
Documentation of primary data, data entry
procedures, data verification, data storage
(physical and electronic) protocols.
Discuss any adjustment to assay data.
●
Accuracy and quality of surveys used to
locate drill-holes (collar and down-hole
surveys), trenches, mine workings and
other locations used in Mineral Resource
estimation.
Specification of the grid system used.
Quality and adequacy of topographic
control.
ALS Minerals, multi element analysis
method ME-MS63 utilised for all samples,
consisting of 4-acid digestion with ICP-MS
and ICP-AES analysis.
● No duplicates or blanks were submitted in
the sampling procedure.
● QC Laboratory Blanks and Standards
were inserted at a ratio 1:10.
•
•
•
•
•
A CP conducted a site visit during drilling
activities. Mineralisation is not visible in
hand sample.
Samples have not been duplicated.
All primary paper data is held at the FBM
Tonopah office; digitised data is entered
into a secured database
No adjustments to assays have occurred.
Drill collars were surveyed in UTM
coordinates, NAD83 UTM zone 11N datum,
by handheld GPS
Future Battery Minerals Ltd
info@futurebatteryminerals.com.au
Suite 10, 38 Colin St, West Perth WA 6005
+61 8 6383 7817
ABN 91 148 966 545
futurebatteryminerals.com.au
ASX: FBM
Follow Us
12
CRITERIA
Data spacing and
distribution
EXPLANATION
COMMENTARY
●
●
Drill Holes were designed with
consideration to accessibility and to test
stratigraphy across select portions of the
prospects. Drilling was not at this stage
designed for resource estimation
purposes.
Whether the orientation of sampling
achieves unbiased sampling of possible
structures and the extent to which this is
known, considering the deposit type.
If the relationship between the drilling
orientation and the orientation of key
mineralised structures is considered to
have introduced a sampling bias, this
should be assessed and reported if
material.
The measures taken to ensure sample
security.
•
Drill Holes: Stratigraphic units are
considered to be relatively flat laying
hence drilling has been conducted
vertically.
•
Drill Holes: Samples collected in marked
calico bags and immediately stored in
sealed bulka bags for transport to ALS
assay Lab in Reno NV post drill hole.
The results of any audits or reviews of
sampling techniques and data.
●
No independent audit or review has been
undertaken.
●
●
Orientation of
data in relation to
geological
structure
Sample security
Audits or reviews
●
●
●
●
Data spacing for reporting of Exploration
Results.
Whether the data spacing and distribution
is sufficient to establish the degree of
geological and grade continuity
appropriate for the Mineral Resource and
Ore Reserve estimation procedure(s) and
classifications applied.
Whether sample compositing has been
applied.
Future Battery Minerals Ltd
info@futurebatteryminerals.com.au
Suite 10, 38 Colin St, West Perth WA 6005
+61 8 6383 7817
ABN 91 148 966 545
futurebatteryminerals.com.au
ASX: FBM
Follow Us
13
Section 2: Reporting of Exploration Results
CRITERIA
Mineral tenement
and land tenure
status
EXPLANATION
●
●
Exploration done
by other parties
Geology
Drill-hole
Information
●
Acknowledgment and appraisal of
exploration by other parties.
●
Deposit type, geological setting and style
of mineralisation.
●
A summary of all information material to
the understanding of the exploration
results including a tabulation of the
following information for all Material drillholes:
● easting and northing of the drill-hole
collar
● elevation or RL (Reduced Level –
elevation above sea level in metres)
of the drill-hole collar
● dip and azimuth of the hole
● down hole length and interception
depth
● hole length.
If the exclusion of this information is
justified on the basis that the information
is not Material and this exclusion does
not detract from the understanding of the
report, the Competent Person should
clearly explain why this is the case.
In reporting Exploration Results,
weighting averaging techniques,
maximum and/or minimum grade
truncations (e.g. cutting of high grades)
and cut-off grades are usually Material
and should be stated.
Where aggregate intercepts incorporate
●
Data aggregation
methods
COMMENTARY
Type, reference name/number, location
and ownership including agreements or
material issues with third parties such as
joint ventures, partnerships, overriding
royalties, native title interests, historical
sites, wilderness or national park and
environmental settings.
The security of the tenure held at the time
of reporting along with any known
impediments to obtaining a licence to
operate in the area.
●
●
FBM owns 80% of the Nevada Lithium
Project (NLP). All mining claims are filed as
BLM claims. The Project is made up of the
following unpatented BLM mining claims:
● Lone Mountain Prospect consists of
242 filed lode claims
● San Antone Prospect consists of 243
filed lode claims
● Traction Prospect consists of 204 filed
lode claims
● There are no known issues with regard
to access or environment.
● The lode claims are in good standing
and no known encumbrances exist.
● Western Flats consists of 253 filed lode
claims
● At all four prospects, previous work has
been conducted by NV Resources and
its consultants, being the vendors of the
NLP to FBM.
● Data collected by this entity has been
reviewed in detail by FBM.
● Lone Mountain, San Antone, Western
Flats and Traction Prospects are
considered prospective for lithium clay
mineralisation.
● Lithium anomalism/mineralisation is
hosted in weakly indurated Tertiary
lacustrine claystone & ashfall units, in
the Basin and Range Province of
Nevada, USA
● Relevant historical drill-hole information
is included in this announcement
however data is limited.
● All location data from FBM recently
completed drilling has been provided in
Table 1.
●
●
No data aggregation used
Metal equivalent values have not been
used.
Future Battery Minerals Ltd
info@futurebatteryminerals.com.au
Suite 10, 38 Colin St, West Perth WA 6005
+61 8 6383 7817
ABN 91 148 966 545
futurebatteryminerals.com.au
ASX: FBM
Follow Us
14
CRITERIA
EXPLANATION
●
Relationship
between
mineralisation
widths and
intercept lengths
●
●
●
Diagrams
Balanced
reporting
Other substantive
exploration data
Further work
●
●
●
●
●
COMMENTARY
short lengths of high-grade results and
longer lengths of low grade results, the
procedure used for such aggregation
should be stated and some typical
examples of such aggregations should be
shown in detail.
The assumptions used for any reporting
of metal equivalent values should be
clearly stated.
These relationships are particularly
important in the reporting of Exploration
Results.
If the geometry of the mineralisation with
respect to the drill-hole angle is known,
its nature should be reported.
If it is not known and only the down hole
lengths are reported, there should be a
clear statement to this effect (e.g. ‘down
hole length, true width not known’).
Appropriate maps and sections (with
scales) and tabulations of intercepts
should be included for any significant
discovery being reported These should
include, but not be limited to a plan view
of drill-hole collar locations and
appropriate sectional views.
Where comprehensive reporting of all
Exploration Results is not practicable,
representative reporting of both low and
high grades and/or widths should be
practiced to avoid misleading reporting of
Exploration Results.
Other exploration data, if meaningful and
material, should be reported including
(but not limited to): geological
observations; geophysical survey results;
geochemical survey results; bulk samples
– size and method of treatment;
metallurgical test results; bulk density,
groundwater, geotechnical and rock
characteristics; potential deleterious or
contaminating substances.
The nature and scale of planned further
work (e.g. tests for lateral extensions or
depth extensions or large-scale step-out
drilling).
Diagrams clearly highlighting the areas of
possible extensions, including the main
geological interpretations and future
drilling areas, provided this information is
not commercially sensitive.
●
●
●
Reported results are down hole
intercepts only
Geological interpretation of the unit
assumes a flat lying lithology
Further drilling will be required to
confirm this.
●
Relevant diagrams have been included
within the announcement.
●
All results from the programme have
been reported in Table 1.
●
No other substantive data exists.
●
Following the receipt of further RC
drilling assays a maiden Mineral
Resource Estimate is scheduled for Q1
2024.
Future Battery Minerals Ltd
info@futurebatteryminerals.com.au
Suite 10, 38 Colin St, West Perth WA 6005
+61 8 6383 7817
ABN 91 148 966 545
futurebatteryminerals.com.au
ASX: FBM
Follow Us
15
Share your feedback
Discover