Quarterly Activities/Appendix 5B Cash Flow Report
Released
Released
Announcement PDF
29 April 2024
QUARTERLY ACTIVITIES REPORT
For the period ending 31 March 2024
Future Battery Minerals Limited (ASX: FBM) (FBM or the Company) is pleased to provide the following report
on its activities during the March 2024 quarter. The Company’s primary focus during the reporting period was
progressing exploration activities at its Kangaroo Hills Lithium Project (KHLP) (100%) in Western Australia
and Nevada Lithium Project (NLP) (80%) in Nevada, USA.
HIGHLIGHTS
Kangaroo Hills Lithium Project (KHLP), WA (100%)
•
Final assays received from Phase 3 reverse circulation (RC) and diamond drilling (DD) program including
15 holes of grid spaced step out drilling at Rocky Prospect (Rocky) and regional prospects, Wallaroo and
Eastern Grey. 1
•
Results from Rocky drilling indicate it is expected to form an integral part of any future development given
its continuity and proximity to both surface and the Big Red Prospect (Big Red).
•
Outstanding metallurgical results confirm spodumene is the predominant lithium mineral in Big Red and
demonstrate it is amenable to conventional Dense Media Separation (DMS) and Froth Flotation separation
techniques 2.
•
New conservation management plan (CMP) approved for KHLP, enabling the Company to recommence
exploration activities in northern KHLP 3 area.
•
Phase 4A drilling (consisting of approximately 3,000m RC) commenced in the northern KHLP, initially
focused on testing the interpreted northern continuity of the shallow, thick, gently dipping and high-grade
mineralisation at Big Red 4.
•
Other key northern targets also tested in Phase 4A drilling (which was completed post quarter end) include
high-potential optimised resistivity anomaly targets at Quokka and Western Grey.
•
Traditional Owner Surveys prior to Phase 4A drilling, providing work area clearance for the key northern
targets.
Nevada Lithium Project (NLP), USA (80%)
•
Assay results for all three (3) DD holes returned thick intervals and successfully extended host stratigraphy
and high-grade mineralisation at depth (up to a further 37m downhole) 5.
•
Phase 3 RC drilling of six (6) holes for 1,177m substantially extended the delineated strike extent of the
thick Lone Mountain mineralisation by an additional 1.7 km, with it now stretching to over 3.0 km 6.
•
Post quarter end, FBM declared a large-scale initial Mineral Resource Estimate (MRE) at NLP of 1.5 Bt
@ 783ppm Li for 6.2 Mt LCE at Lone Mountain 7
1
Refer to ASX Announcement dated 30 January 2024 – Final Assays from Phase 3 Drilling at Kangaroo Hills
Refer to ASX Announcement dated 5 February 2024 – Outstanding Metallurgical Results from Kangaroo Hills
Refer to ASX Announcement dated 28 February 2024 – New Conservation Management Plan for Kangaroo Hills Approved
4
Refer to ASX Announcement dated 11 March 2024 – Phase 4 Kangaroo Hills Drilling Commenced
5
Refer to ASX Announcement dated 22 January 2024 – Thick, High-Grade Intervals Confirm Significant Extension of Mineralisation at NLP
6
Refer to ASX Announcement dated 7 March 2024 – Large-Scale Strike Extension Delivered at NLP
7
Refer to ASX Announcement dated 15 April 2024 – Outstanding Maiden Mineral Resource Estimate for 80%-owned Nevada Lithium Project
2
3
Future Battery Minerals Ltd
info@futurebatteryminerals.com.au
Suite 10, 38 Colin St, West Perth WA 6005
+61 8 6383 7817
ABN 91 148 966 545
futurebatteryminerals.com.au
ASX:FBM
Follow Us
1
Miriam Lithium Project (85%)
•
Binding purchase agreement signed to acquire 85% interest in Miriam Lithium Project (Miriam) from
Corazon Mining Limited (ASX:CZN) 8; completion subject to satisfaction of residual conditions precedent.
•
Located immediately north of the KHLP, Miriam is a strategic acquisition that consolidates FBM’s
landholding in the region.
•
Miriam hosts high grade spodumene bearing pegmatites with rock chip samples up to 1.85% Li2O located
3.5km north of Big Red discovery.
•
Additional sampling of the known spodumene-bearing outcrop previously identified by Corazon has
generated a further 2.0% Li2O rock chip assay.
•
Significantly, FBM identified an additional spodumene-bearing outcrop, approx. 250m west of the known
spodumene-bearing outcrop, which returned a rock chip assay of 1.23% Li2O.
•
Post quarter end, preliminary mapping work identified 11 discrete pegmatite units across the southern area
of the Miriam tenure. 9
Corporate
•
Appointment of Non-Executive Director, Neville Power, to the role of Non-Executive Chairman
•
Prior Chairman, Michael Edwards, transitioned to Non-Executive Director role.
•
Successful bookbuild for $6 million placement to raise funds for Miriam acquisition and lithium exploration
programs 10.
•
Cash balance at 31 March 2024 of $1.34 million and zero debt (excluding typical trade creditors).
•
Initial cash consideration for Miriam transaction ($250,000 deposit) was paid before quarter end.
•
Approximately $215,000 of the placement first tranche was received during the quarter, with the residual
first tranche gross proceeds (approximately $5.54 million) received post quarter end.
June 2024 Quarter Planned Activity
Upcoming work programs and expected results for FBM include:
KHLP
•
Phase 4A drilling program – assays expected to be returned in mid-May.
•
Further drilling of key new northern resistivity target areas and extension of the Big Red mineralised
pegmatite.
NLP
•
Evaluation of potential commercialisation options.
Miriam
•
Transaction completion pending satisfaction of all conditions precedent anticipated in late May.
•
Detailed target generative field exploration activities, including further soil sampling and geophysical
surveying and review.
•
Maiden drilling targeted from Q3 2024.
8
Refer to ASX Announcement dated 25 March 2024 – FBM Consolidates Strategic Position with Acquisition of an 85% Interest in the Miriam Lithium
Project
9
Refer to ASX Announcement dated 23 April 2024 – Key Target Generation Advancing at Miriam Lithium Project
10
Refer to ASX Announcement dated 27 March 2024 – A$6M Placement to Fund Miriam Project Acquisition and Aggressive Lithium Exploration Programs
Future Battery Minerals Ltd
info@futurebatteryminerals.com.au
Suite 10, 38 Colin St, West Perth WA 6005
+61 8 6383 7817
ABN 91 148 966 545
futurebatteryminerals.com.au
ASX: FBM
Follow Us
2
FBM Managing Director, Nicholas Rathjen, commented:
“It has been a highly productive start to 2024.”
“Final results from last year’s KHLP Phase 3 program have meaningfully extended the Big Red/Rocky
pegmatite system. The shallow, thick, high-grade lithium mineralisation at Big Red remains wide open to the
north and is coincident with a significant resistivity anomaly, now referred to collectively as the Big Red
Extension.”
“The receipt of ministerial approval for the KHLP CMP was a significant milestone in the ongoing exploration
of the region. The submission of the POW led to the commencement of the eagerly awaited Phase 4A drilling
program at KHLP. Initial drilling has prioritised testing Big Red Extension plus a series of high-potential
resistivity anomaly targets in the northern KHLP area – assays are expected to be returned from this program
around mid-May.”
“In addition to the advancement of the KHLP through exploration, we also received the maiden metallurgical
testwork program results. This program was focussed on process de-risking by testing Big Red’s amenability
to conventional spodumene separation process techniques, namely Dense Media Separation and Fines Froth
Flotation. The results confirmed spodumene as the predominant lithium mineral and that a hybrid flowsheet
utilising both DMS and Fines Flotation can produce a high-grade, marketable spodumene concentrate with
low levels of contaminants.”
“In Nevada, the Phase 3 drilling program concluded with DD and RC results extending the high-grade
mineralisation at depth and to the south at Lone Mountain. Our work at the NLP culminated in the declaration
of a large-scale maiden Mineral Resource Estimate post-quarter end. This is a significant milestone for the
NLP, which is located within a highly active lithium mining and exploration province, and a promising start in
the next chapter for this high value lithium exploration asset.”
“In addition to our activities at the KHLP and NLP, we have made a meaningful expansion to our existing
tenement position in WA with the execution of a binding agreement with Corazon for acquisition of an 85%
interest in the Miriam Lithium Project. Given our strong belief in the KHLP, this acquisition represents an
opportunistic and logical move to further consolidate our landholding and aggressive exploration strategy in
the region. The Miriam Project offers a highly prospective, drill-ready opportunity with confirmed spodumenebearing pegmatite outcrops. We look forward to completing this transaction and commencing maiden drilling
at Miriam from Q3 2024.”
“The Miriam transaction was achieved through a successful and strongly demanded equity raise. It provided
validation of our existing portfolio strategy as well as the acquisition of the strategically located and highly
prospective Miriam tenure. As part of the raising, we were pleased to welcome a number of new, high-quality
institutional shareholders to our register. We were also greatly appreciative of the support received from
existing institutional and sophisticated investors, including our major shareholder, Hancock Prospecting. We
look forward to communicating with shareholders as our exploration programs at both KHLP and Miriam
advance throughout this year.”
Lithium Projects – Western Australia
Kangaroo Hills Lithium Project (KHLP) (100%)
During the quarter, FBM continued to rapidly advance exploration activities across the KHLP, whilst also
unlocking process knowledge through minerology and metallurgical testwork.
Phase 3 drilling
FBM commenced the Phase 3 drilling program at the KHLP during the September 2023 quarter, which initially
consisted of 5,000m of RC infilling at Big Red and testing of the regional targets at Rocky, Eastern Grey,
Wallaroo and Pademelon. Due to early successes from RC drilling at Rocky, the program was increased by a
further 6,000m in late August 2023 to further expand Rocky as well as additional regional target testing.
Future Battery Minerals Ltd
info@futurebatteryminerals.com.au
Suite 10, 38 Colin St, West Perth WA 6005
+61 8 6383 7817
ABN 91 148 966 545
futurebatteryminerals.com.au
ASX: FBM
Follow Us
3
The initial target generative work successfully identified the targets, Rocky and Eastern Grey, which both host
confirmed pegmatites. The presence of a lithium-bearing pegmatite at Rocky was confirmed through the
proximal result of 5m @ 1.12% Li2O from 104m in KHRC0037.
Initial holes completed at Rocky intercepted multiple new pegmatites in close proximity to Big Red, which were
interpreted as a larger stacked system and continues to remain open in all directions. FBM previously received
two batches of assay results from this program during the December 2023 Quarter.
On 30 January 2024, assays were received for the final 15 holes from the Phase 3 RC and DD program. These
drill holes were predominantly focussed on grid drilling of Rocky and wide-spaced scout drilling to east of Big
Red and regional targets Eastern Grey (south-east of Big Red) and Wallaroo (southern regional).
Drilling at Rocky previously identified numerous pegmatites semi-parallel to and dipping below the Big Red
pegmatite. The visual observations of spodumene within these pegmatites at Rocky led FBM to significantly
expand the Phase 3 RC and DD drilling programme.
These results further increased the scale of the mineralised system, which remains open along strike to the
north and at depth. At Rocky, drilling and recent modelling of the pegmatites has demonstrated a highly
continuous mineralised system commencing at shallow depths, albeit thinner and of lower average grade than
the standout neighbouring Big Red pegmatite.
The proximity of Rocky to both surface and Big Red means that it is expected to form a significant part of any
future development at Kangaroo Hills.
The shallow, thick, high-grade lithium system at Big Red remains completely open to the north and at depth.
As shown in Figure 2 and Figure 3, there is a clear increase and consistency in grade and thickness of the
pegmatites to the north of Big Red.
Figure 1: KHLP Long Section - Big Red and Rocky Pegmatite System
Future Battery Minerals Ltd
info@futurebatteryminerals.com.au
Suite 10, 38 Colin St, West Perth WA 6005
+61 8 6383 7817
ABN 91 148 966 545
futurebatteryminerals.com.au
ASX: FBM
Follow Us
4
Conservation Management Plan receives ministerial approval for northern targets
On 28 February 2024, FBM received ministerial approval for its new Conservation Management Plan (CMP)
over the northern area of the KHLP. This represented a key milestone for FBM’s ongoing and planned
exploration of the KHLP.
Select drilling in the northern KHLP area under the previously defined CMP had been undertaken by the
Company over 2023. Following the discovery of Big Red immediately to the south and upon FBM’s subsequent
application to conduct further drilling in this area (which covers the interpreted extension of Big Red to the
north, following the dip and strike extent of the pegmatite), the Department of Biodiversity, Conservation and
Attractions (DBCA) required FBM to develop a new CMP reflecting evolved circumstances.
During the period required to develop and progress to approval of this new CMP, FBM was not able to
undertake any drilling activities on these highly prospective northern KHLP areas. However, it did not restrict
the Company from undertaking non-ground disturbing activities across this part of its tenure. This work, which
included further target generative geophysical programmes, soil sampling, field mapping, and rock chip
sampling resulted in excellent and critical target refinement.
Phase 4A drilling program commenced
During the quarter, FBM advanced key workstreams for the commencement of the KHLP Phase 4A RC drilling
program. Following the receipt of ministerial approval for the CMP, FBM immediately submitted its POW to
DEMIRS. A heritage survey with the Marlinyu Ghoorlie (traditional owners) was also completed to advance
exploration activities within these prospective areas.
In March 2024, drilling commenced with the RC drilling of key northern targets. The Phase 4A program
comprises approximately 3,000m of drilling and initially focussed on testing the interpreted northern continuity
(Big Red Extension) of the shallow, thick, gently dipping, and high-grade lithium mineralisation intersected at
Big Red which includes:
29m @ 1.36% Li2O from 38m (KHRC011) 11
27m @ 1.32% Li2O from 64m (KHRC017) 12
23m @ 1.03% Li2O from 53m (KHRC031) 13
23m @ 1.19% Li2O from 44m (KHDD001)1
22m @ 1.24% Li2O from 23m (KHDD006) 14
Drilling then focused on preliminary testing of high-potential optimised resistivity anomaly targets at Quokka,
Western Grey and Big Red West. Subsequent to the end of the quarter, the program was completed with
assays expected to be returned around mid-May.
11
Refer to ASX Announcement dated 20 March 2023 – “LCT-Pegmatite Discovery Confirmed at Kangaroo Hills”.
12
Refer to ASX Announcement dated 3 May 2023 – “Multiple Thick High-Grade Results Extend Lithium Discovery”.
Refer to ASX Announcement dated 22 June 2023 – “Further High-Grade Lithium Assays at Big Red Discovery, New Pegmatite
Uncovered at The Rocky Prospect”.
13
14
Refer to ASX Announcement dated 17 October 2023 – “Kangaroo Hills High-Grade Lithium System Continues to Grow”.
Future Battery Minerals Ltd
info@futurebatteryminerals.com.au
Suite 10, 38 Colin St, West Perth WA 6005
+61 8 6383 7817
ABN 91 148 966 545
futurebatteryminerals.com.au
ASX: FBM
Follow Us
5
Figure 2: RC rig drilling at the Big Red Extension target
Figure 3: KHLP – Resistivity survey area and prospective anomalies
Future Battery Minerals Ltd
info@futurebatteryminerals.com.au
Suite 10, 38 Colin St, West Perth WA 6005
+61 8 6383 7817
ABN 91 148 966 545
futurebatteryminerals.com.au
ASX: FBM
Follow Us
6
Outstanding metallurgical results for Big Red
Nagrom Laboratories, Perth (Nagrom) were engaged to conduct a testwork program on mineralised material
from the Big Red pegmatite at the KHLP. The results were then independently reviewed and interpreted by
MinSol Engineering Pty Ltd (MinSol).
The purpose of the program was to assess the amenability of the Big Red mineralisation to conventional
spodumene separation process techniques, namely Dense Media Separation (DMS) and Fines Froth Flotation.
Five (5) DD samples were selected for the program based on their central proximity within the identified
mineralised zones at grades aligning with typical drilling assay results to date from the Big Red lithiummineralised pegmatite.
Composite samples #1 to #4 were used initially to undertake preliminary liberation testwork to determine Heavy
Liquid Separation (HLS) performance at alternate crush sizes as well as to develop a preliminary flotation
reagent regime and define the deslime and magnetic separation requirements for the fine fractions.
Composite #5 was then processed through HLS at a single size fraction, followed by a Whole of Ore (WOO)
Fines Flotation test program based on the refined parameters set by the prior testing. The testwork processing
method for Composite #5 comprised the following steps:
1. Sample Preparation
•
Stage crushing to P100 3.35mm.
•
Sample split for HLS tests and WOO flotation tests.
2. Heavy Liquid Separation (HLS)
•
Wet screening at 0.85mm.
•
HLS densiometric sequential testing and analysis on the -3.35mm +0.85mm fraction at Specific
Gravity (SG) of 2.70, 2.80, 2.85, 2.90 and 2.96.
3. WOO Fines Flotation
•
Grind establishment on 3 x 1kg charges.
•
Grinding of individual -3.35mm feed samples to P80 of 150µm.
•
Flotation feed de-sliming at 38µm.
•
Removal of iron bearing minerals by magnetic separation at +3000 Gauss.
•
Sighter flotation tests (rougher, scavenger, cleaner, re-cleaner) on the non-magnetic fraction.
XRD data for Composite #5 suggested that approximately 90% of the Li2O is present as spodumene. A detailed
description of each test program is provided below for Composite #5.
The results indicated that a hybrid flowsheet utilising both DMS and Fines Flotation can produce a high-grade,
marketable spodumene concentrate with low levels of contaminants. A high-level summary of the results is
included below:
•
DMS: Heavy Liquid Separation (HLS) undertaken on -3.35mm +850um fraction produced spodumene
concentrate grading 5.56% Li2O with a stage recovery of 52.9%.
•
Froth Flotation: Whole-of-Ore (WOO) Fines Flotation produced a spodumene concentrate with a
grade of 5.50% Li2O at a global recovery of 76.9%.
Future Battery Minerals Ltd
info@futurebatteryminerals.com.au
Suite 10, 38 Colin St, West Perth WA 6005
+61 8 6383 7817
ABN 91 148 966 545
futurebatteryminerals.com.au
ASX: FBM
Follow Us
7
The HLS process screened the -3.35mm crushed Composite #5 at 0.85mm resulted in a mass yield of 58.27%
to the oversize and 41.73% to the undersize.
The -3.35mm +0.85mm fraction was then subjected to HLS at the SGs noted above, with key results
summarised in Table 2 (for SG 2.85) and Figure 3 (all SGs). While the tests were undertaken at sequential
densiometric intervals, the results have been simplified to show a single product (sinks) and waste / re-treat
fraction (floats).
Table 1 - Composite #5 HLS results – SG 2.85
Sample
Wt.%
Calc Head
Assays (%)
Recovery (%)
Li2O
Fe2O3
Li2O
Fe2O3
100.00
1.48
0.35
-
-
2.85 Floats
86.63
0.76
0.29
47.10
69.81
2.85 Sinks (product)
13.37
5.56
0.80
52.90
30.19
Figure 4 - Sequential HLS Stage Results
As per these results, at a HLS conducted at SG 2.90 the expected sinks concentrate yield would be 9.59%
with a grade of 6.14% Li2O and recovery of 41.89%. HLS at SG 2.85 yielded a spodumene concentrate grading
5.56% Li2O and recovery of 52.90%.
Future Battery Minerals Ltd
info@futurebatteryminerals.com.au
Suite 10, 38 Colin St, West Perth WA 6005
+61 8 6383 7817
ABN 91 148 966 545
futurebatteryminerals.com.au
ASX: FBM
Follow Us
8
Figure 5 - HLS concentrate fractions grading ~6.0% Li2O (left) and ~5.5% Li2O (right)
The combined screening and HLS results are provided in Table 1 to show global recoveries to various target
concentrate grades.
Table 2 - Global recoveries for HLS testwork – Composite #5
-0.85mm
HLS Floats
HLS Sinks
Target
Product
Grade
(% Li2O)
Grade (%
Li2O)
Global Li2O
Recovery (%)
Grade (%
Li2O)
Global Li2O
Recovery (%)
Grade (%
Li2O)
Global Li2O
Recovery (%)
6.00
1.30
38.51
0.87
34.14
6.00
27.35
5.50
1.30
38.51
0.75
28.29
5.50
33.20
5.00
1.30
38.51
0.64
22.66
5.00
38.83
The high-grade product produced indicates that a hybrid processing flowsheet incorporating both DMS and
fines flotation could be utilised to maximise process outcomes at marketable product grades.
The WOO fines flotation process utilised the -3.35mm crushed product and first underwent grinding to target
a product P80 of 150µm. The ground feed was deslimed by wet screening at 38µm before the +38µm material
was submitted to magnetic separation to remove typical iron bearing minerals that are found in spodumene
bearing pegmatites. The non-magnetics were then tested by three flotation tests utilising common industry
practise regimes and reagents. Results from the Composite #5 WOO Fines Flotation tests are presented in
Table 2 and Figure 6.
Table 3 - WOO Fines Flotation stage test results
Stage
Grade (%)
Stage Recovery (%)
Li2O
Fe2O3
Li2O
Fe2O3
Re-Cleaner Con
5.87
1.06
90.27
78.91
Cleaner Con
5.54
1.03
92.21
82.83
Rougher Con
4.34
0.84
95.45
89.03
Rougher Tail
0.10
0.05
4.55
10.97
Forecast
6.00
1.07
82.81
71.49
Forecast
5.50
1.03
92.31
83.02
Forecast
5.00
0.94
93.66
85.60
Future Battery Minerals Ltd
info@futurebatteryminerals.com.au
Suite 10, 38 Colin St, West Perth WA 6005
+61 8 6383 7817
ABN 91 148 966 545
futurebatteryminerals.com.au
ASX: FBM
Follow Us
9
Figure 1 - WOO Fines Flotation grade / recovery stage results
The combined deslime, magnetic separation and WOO Fines Flotation results are provided below to show
global recoveries for various target concentrate grades.
Table 4 - WOO Fines Flotation process grade / recovery global results
Slimes
Grade
(Li2O)
1.09
Recovery
(% Li2O)
14.92
Global Flotation Concentrate Recovery
(% Li2O)
Mags
Grade
(Li2O)
2.27
Recovery
(% Li2O)
1.72
@ 6.0% Li2O
@ 5.5% Li2O
@ 5.0% Li2O
69.03
76.94
78.07
The testwork conducted was at a preliminary stage with the application of only first-principles processing
methodologies and minimal optimisation work. This leaves potential for significant further improvement in
lithium recovery and concentrate product parameters with subsequent, more advanced testwork programs
detailed below.
The outcomes of this initial program have led to the following recommendations for the next stage of
metallurgical evaluations following the Phase 4 drilling program at the KHLP:
•
Optimisation of DMS flowsheet, including:
o
More detailed liberation analysis.
o
Options for single- and two-stage DMS flowsheets to target improved recoveries.
o
Options for processing multiple DMS size fractions.
Future Battery Minerals Ltd
info@futurebatteryminerals.com.au
Suite 10, 38 Colin St, West Perth WA 6005
+61 8 6383 7817
ABN 91 148 966 545
futurebatteryminerals.com.au
ASX: FBM
Follow Us
10
•
Combined hybrid flowsheets to define global recoveries for DMS integration with Fines Froth Flotation.
•
Optimisation of grind size and desliming requirements for Fines Froth Flotation.
•
Optimisation of flotation parameters and reagent selection.
Miriam Lithium Project (85%) acquisition
In late March 2024, FBM executed a binding purchase agreement to acquire 85% of the issued capital of
Coolgardie Nickel Pty Ltd, a wholly owned subsidiary of Corazon Mining Limited (ASX: CZN) (Corazon), which
holds tenements that comprise the Miriam Lithium Project (Miriam or Miriam Project). The transaction
remains subject to conditions precedent and is anticipated to complete in or around mid-May 2024.
The Miriam Project covers an area of approximately 6 kilometres by 1.5 kilometres and comprises four
Prospecting Licences (P15/61356 to P15/6139 inclusive) and one Prospecting Licence application (P15/6135).
It is located approximately 10 kilometres south-southwest of Coolgardie and immediately north and contiguous
to KHLP.
In December 2022, Corazon announced the discovery of spodumene bearing outcrop on the Miriam Project
with high grade rock chip samples returning up to 1.85% Li2O. During 2023, detailed geochemical soil sampling
revealed a primary lithium target of approximately 1.6 kilometres in strike, and a second trend spanning
approximately 600 metres, that links into the main pegmatite trend. The large lithium soil anomaly, extended
from the weathered (depleted) outcrop of spodumene-rich pegmatite, highlighting a potential trend of further
lithium bearing pegmatites to be present on undercover on the Miriam Project.
The absence of historic drilling for lithium at the Miriam Project provides a significant opportunity for future
discovery. FBM expects to be able to commence drilling at the Miriam Project during Q3 2024, pending
completion of the acquisition.
Future Battery Minerals Ltd
info@futurebatteryminerals.com.au
Suite 10, 38 Colin St, West Perth WA 6005
+61 8 6383 7817
ABN 91 148 966 545
futurebatteryminerals.com.au
ASX: FBM
Follow Us
11
Figure 7: Location of Miriam Project
Transaction terms
The total consideration for the acquisition is as follows:
•
$250,000 cash deposit on execution of the agreement;
•
$750,000 in cash at completion;
•
16,129,033 fully paid ordinary shares in FBM (FBM Shares) at completion; and
•
120,967,744 performance rights (Performance Rights) at completion with the following vesting conditions:
─ 8,064,517 Performance Rights will vest upon the achievement of a drillhole intercept of at least
+15 metres at +1% Li2O at the Miriam Lithium Project;
Future Battery Minerals Ltd
info@futurebatteryminerals.com.au
Suite 10, 38 Colin St, West Perth WA 6005
+61 8 6383 7817
ABN 91 148 966 545
futurebatteryminerals.com.au
ASX: FBM
Follow Us
12
─
─
32,258,065 Performance Rights will vest upon the definition of a Mineral Resource estimate of
greater than 10Mt at +1% Li2O at the Miriam Lithium Project; and
80,645,162 Performance Rights will vest the definition of a Mineral Resource estimate of greater
than 20Mt at +1% Li2O at the Miriam Lithium Project.
Corazon will retain 100% of the base and precious metals rights in respect of the Miriam Project.
Completion of the acquisition is subject to (amongst other matters) FBM obtaining shareholder approval to
issue the FBM Shares and Performance Rights. The acquisition is anticipated to complete in or around midMay 2024.
For a detailed summary of the acquisition, including the material terms of the agreement and conditions
precedent, refer to ASX announcement dated 25 March 2024, “FBM Consolidates Strategic Position with
Acquisition of an 85% Interest in the Miriam Lithium Project”.
Key mapping and geophysical targeting work
FBM has subsequently undertaken field mapping activities which successfully identified 11 discrete pegmatite
units across the southern area of Miriam Project tenure. Most of these outcropping pegmatites are located
proximate to the previously identified existing spodumene outcroppings.
The returned rock chip assays correlate with the soil sampling previously undertaken by Corazon. Utilising
both the rock chip and soil sampling geochemical data, plus the mapping outcomes, four (4) distinct target
zones have become apparent.
These target zones vary from 350m to 1.6km in strike length, and are characterised by elevated lithium,
tantalum and tin values, including a lower-level lithium anomaly observed developing at the north-eastern
boundary of the tenement and which remains open due to the limited footprint of the current soil sample area.
To complement the existing targets defined at Miriam to date. FBM has commenced a target-generative
geophysical review of the Miriam tenure. This comprises litho-magnetic structural interpretation of the entire
tenement package and low-cost non-ground disturbing geophysical surveys including ground gravity and
passive seismic.
These low-cost geophysical review and survey methods were previously successfully implemented at the
KHLP. Significantly, the litho-magnetic structural interpretation successfully identified thick blind pegmatites
up to 56m and 43m downhole at the Wallaroo and Pademelon targets respectively.
In the knowledge that outcrop is limited at the Miriam Project, geophysics and geochemistry are expected to
be highly complementary in generating high-priority drill targets.
Future Battery Minerals Ltd
info@futurebatteryminerals.com.au
Suite 10, 38 Colin St, West Perth WA 6005
+61 8 6383 7817
ABN 91 148 966 545
futurebatteryminerals.com.au
ASX: FBM
Follow Us
13
Figure 8: Location of identified pegmatite rock chip samples from FBM’s recent field mapping activities
Future Battery Minerals Ltd
info@futurebatteryminerals.com.au
Suite 10, 38 Colin St, West Perth WA 6005
+61 8 6383 7817
ABN 91 148 966 545
futurebatteryminerals.com.au
ASX: FBM
Follow Us
14
Lithium Projects – Nevada, USA
Nevada Lithium Project (NLP) (80%)
Phase 3 drilling
On 3 October 2023, FBM commenced the Phase 3 drilling program at the NLP comprising both DD and RC
drilling. The results of this program were intended to inform the delivery of a maiden Mineral Resource Estimate
(MRE) at the NLP.
Figure 9: NLP location map including neighbouring deposi