New Lithium Drilling Extends Big Red and Potoroo
Released
Released
Announcement PDF
ASX Announcement
23 June 2026
ASX: OR3
Follow Us
E. info@oreresources.com.au
P. +618 6383 7817
oreresources.com.au
ORE Resources
Suite 10, 38 Colin St, West Perth WA 6005
NEW LITHIUM DRILLING EXTENDS BIG RED & POTOROO
Ore Resources Ltd (ASX: OR3) (Ore or the Company) is pleased to announce assay results from the Reverse
Circulation (RC) drilling programme completed at its 100%-owned Kangaroo Hills Lithium Project (Kangaroo
Hills), part of the broader Coolgardie Lithium Projects, located in the Goldfields region of Western Australia.
HIGHLIGHTS
• Twenty (20) RC holes for 3,300m completed at Kangaroo Hills across April and May 2026, with the
programme having both step-out and infill objectives.
• Successful new extensions defined at both the Big Red and Potoroo pegmatite systems.
• Key intercepts included:
o 34m @ 1.11% Li2O from 77m including 14m @ 1.63% Li2O from 96m (KHRC214) (Big Red infill)
o 18m @ 1.03 % Li2O from 103m including 10m @ 1.49% Li2O from 103m (KHRC211) (Big Red
infill)
o 28m @ 0.89% Li2O from 68m including 12m @ 1.01 % Li2O from 82m and 9m @ 1.06% Li2O from
68m (KHRC209) (Big Red infill)
o 12m @ 1.05% Li2O from 147m (KHRC216) (Big Red extension)
o 10m @ 1.02% Li2O from 145m (KHRC200) (Big Red extension)
o 11m @ 1.05% Li2O from 111m and 5m @ 1.09% Li2O from 158m (KHRC199) (Potoroo infill)
o 8m @ 1.08% Li2O from 130m (KHRC201) (Potoroo extension)
• Infill drilling at Big Red confirmed consistent grades and widths over a 500m NE-SW strike, with further
work required to better define higher-grade zones and thickening mineralisation to the north.
• Potoroo remains open and continues to exhibit a N-S strike, highlighting its further growth potential.
• Assessment of near-term project development and commercialisation options for Kangaroo Hills in
progress, including potential export Direct Shipped Ore (DSO) or domestic ore sales.
• Further lithium-focussed activities in planning for H2 2026, including additional drilling of Big Red and
Potoroo, testing of regional targets at Kangaroo Hills, follow-up metallurgical test work, and initial
lithium drilling at Miriam. Update to be provided in coming weeks.
• Ore is well funded and strongly positioned to advance all planned exploration at its Coolgardie and
Kal East Lithium and Gold Projects, with A$9.6 million cash and zero debt (as at 31 March 2026).
oreresources.com.au 2
Ore Resources’ Managing Director and CEO, Nick Rathjen, commented:
“Our recent RC drilling programme at Kangaroo Hills builds directly on the success of our 2024 exploration
programmes, combining both step-out and infill drilling to expand the existing mineralised footprint, improve
geological confidence and support future project development. This programme has delivered on all fronts,
including defining new, material strike extensions at both the Big Red and Potoroo pegmatites.”
“The results of this programme provide increased confidence in the scale and continuity potential of Kangaroo
Hills. In line with improving lithium market conditions and increasing activity in the region surrounding our
Coolgardie projects, we are assessing several near-term project development and commercialisation pathways
aimed at unlocking significant value at Kangaroo Hills. Options under consideration include the clear potential
for export direct shipped ore or domestic ore sales. Kangaroo Hills is one of the few remaining lithium projects in
Australia either not in development, production or subject to existing offtake arrangements.”
“Follow-up exploration is also under consideration across our broader Coolgardie Lithium Projects portfolio.
Potential lithium-focussed activities in H2 2026 include additional drilling at Big Red and Potoroo, testing of
regional targets at Kangaroo Hills, follow-up metallurgical test work at Kangaroo Hills, along with initial drilling
at the Miriam Lithium Project. A further Lithium update to be provided in the coming weeks”
Overview
Between April and May 2026, Ore completed an RC drilling programme at the Coolgardie Lithium Projects aimed
at expanding the known mineralised footprint at Kangaroo Hills. The programme comprised 20 holes for a total
of over 3,300 metres drilled, including strategic step-out drilling targeting extensions to the Big Red and Potoroo
pegmatites, along with limited infill drilling to support potential future resource delineation and project
advancement.
Drilling at Kangaroo Hills to date has primarily focused on Big Red, a near-surface, shallow dipping pegmatite
system characterised by thick, laterally continuous mineralisation and consistently strong lithium grades. Big
Red is interpreted to form part of a large, coherent lithium-caesium-tantalum (LCT) pegmatite system,
highlighting the broader prospectivity of Kangaroo Hills and the wider Coolgardie Lithium Projects.
The recent RC drilling programme was designed to further extend the Big Red pegmatite system, which remains
open along-strike to the north and down-dip. Targeted follow-up drilling was also undertaken at the highly
prospective and underexplored Potoroo pegmatite system. Potoroo represents a priority target, with strong
potential to host additional regional-scale mineralisation. It is located immediately north of, and is
complementary to, the Big Red system.
oreresources.com.au 3
Figure 1: Kangaroo Hills Plan View
RC drilling further expands Kangaroo Hills lithium mineralisation
The RC drilling programme successfully achieved its goal of defining infill and significant strike extensions to both
the Big Red and Potoroo pegmatite systems.
Big Red
Infill drilling at Big Red successfully demonstrated consistent grades and thickness through drill holes KHRC214,
KHRC211 and KHRC209. These drill holes intercepted:
• 34m @ 1.11% Li2O from 77m including 14m @ 1.63% Li2O from 96m (KHRC214)
• 18m @ 1.03 % Li2O from 103m including 10m @ 1.49% Li2O from 103m (KHRC211)
• 28m @ 0.89% Li2O from 68m including 12m @ 1.01 % Li2O from 82m and 9m @ 1.06% Li2O from 68m
(KHRC209)
oreresources.com.au 4
Figure 2: Cross Section – KHRC214
At Big Red, step-out drilling north of the 2024 drill lines successfully intersected lithium mineralisation, returning
encouraging widths and grades. This includes a 60m northern extension of Phase 4B drill hole KHRC194
(previously returned 20m @ 0.81% Li2O)0F0F
1
confirmed by drill holes KHRC216 and KHRC200. These holes returned:
• 12m @ 1.05% Li2O from 147m (KHRC216).
• 10m @ 1.02% Li2O from 145m (KHRC200).
A single drill hole approximately 150m north of KHRC194 intersected spodumene-bearing pegmatites in
KHRC204, which returned 10m @ 0.58% Li2O from 142m. While this intercept confirms continuation of the Big
Red system, it did not fully test the thickest or most mineralised zone of the pegmatite. The higher-grade zone
is currently interpreted to deviate further to the northeast and remains open. Follow-up drilling will be required
to test these northern extensions to better define the high-grade trend and controls on the pegmatite system.
Importantly, these results increase confidence in the continuity of mineralisation across the central and
southern zones of Big Red, now demonstrated to extend over a 500m strike length.
Potoroo
At Potoroo, drilling successfully extended the pegmatite a further 50m north through KHRC201, which
intercepted 8m @ 1.08% Li2O from 130m. To the west, KHRC213 successfully defined continuity of
mineralisation with a 90m western extension, returning 4m @ 1.01% Li2O from 113m.
Importantly, Potoroo continues to exhibit a north-south (N-S) strike of mineralisation, highlighting significant
opportunity for further growth within the Kangaroo Hills tenure footprint.
1 Refer to OR3 ASX release dated 9 July 2024, “Drilling Extends Big Red Pegmatite”
oreresources.com.au 5
Figure 3: Cross Section – KHRC201 - KHRC208
Figure 4: Kangaroo Hills – Schematic Long Section
oreresources.com.au 6
Next steps
The results of this drilling programme are highly encouraging, highlighting immediate potential for further
extensions to Big Red and Potoroo further north. Ore is currently considering follow-up exploration activities at
its Coolgardie Lithium Projects in H2 2026. This includes additional drilling at both Big Red and Potoroo, potential
first-pass drill testing of regional targets, as well as initial drilling at the Miriam Lithium Project. Additional
metallurgical testwork at Kangaroo Hills is also under consideration to support further project advancement.
Ore is currently evaluating near-term development and commercialisation pathways for Kangaroo Hills,
including potential export Direct Shipped Ore (DSO) or domestic ore sales. This strongly aligned with improving
lithium market conditions and increasing activity from neighbouring developers and producers.
Figure 5: Kangaroo Hills and Miriam Lithium Projects – Plan View
oreresources.com.au 7
Figure 6: Coolgardie Lithium Project – Regional Map
This announcement has been authorised for release by the Board of Directors of the Company.
For further information, visit http://www.oreresources.com.au/ or contact:
Nicholas Rathjen Robin Cox
CEO & Managing Director Technical Director
E: nrathjen@oreresources.com.au E: rcox@oreresources.com.au
https://oreresources.com.au/link/Pw7pAP
oreresources.com.au 8
Competent Persons Statement
The information in this announcement that relates to exploration results is based on and fairly represents information compiled
by Mr Robin Cox BSc (E.Geol), a Competent Person, who is a Member of the Australian Institute of Mining and Metallurgy.
Mr Cox is the Company’s Chief Geologist and has sufficient experience that is relevant to the style of mineralisation and type
of deposit under consideration and to the activity being undertaken to qualify as a Competent Person as defined in the 2012
Edition of the Australasian Code for Reporting of Exploration Results, Mineral Resources and Ore Reserves. Mr Cox consents
to the inclusion in this announcement of the matters based on his information in the form and context in which it appears.
Forward-Looking Statements
This document may include forward-looking statements. Forward-looking statements include, but are not limited to, statements
concerning Ore Resource Limited’s planned exploration programme and other statements that are not historical facts. When
used in this document, the words such as “could,” “plan,” “estimate,” “expect,” “intend,” “may”, “potential”, “should,” and similar
expressions are forward-looking statements. Although Ore Resources Limited believes that its expectations reflected in these
forward-looking statements are reasonable, such statements involve risks and uncertainties, and no assurance can be given
that actual results will be consistent with these forward-looking statements.
Previously Reported Results
The information in this announcement that relates to Exploration Results is extracted from the ASX announcements (Original
Announcements), as referenced, which are available at www.oreresources.com.au. Ore confirms that it is not aware of any
new information or data that materially affects the information included in the Original Announcements and, that all material
assumptions and technical parameters underpinning the estimates in the Original Announcements continue to apply and have
not materially changed. Ore confirms that the form and context in which the Competent Persons’ findings are presented have
not been materially modified from the original announcement.
oreresources.com.au 9
About Ore Resources Ltd (ASX: OR3)
THE BUSINESS: Gold and lithium exploration and development
Ore Resources (ASX: OR3) is an exploration and development company focused on rapidly advancing its 100%
owned Coolgardie and Kal East Gold and Lithium Projects in the Eastern Goldfields of Western Australia.
THE LOCATION: Infrastructure-rich project setting
The Eastern W.A. Goldfields is an
outstanding location in which to explore for,
build, and operate gold and lithium mines. It
is a long-established mining province with all
the accompanying benefits, including all-
year land access, skilled labour, mining
services and infrastructure.
The Projects are positioned within 50km of
the mining hub of Kalgoorlie (via sealed and
access roads), approximately 370km to the
port of Esperance and approximately 550km
to Perth via road and rail. We are proximal to
multiple gold and lithium mining and
processing operations and development
projects of substantial scale.
This available range of potential
commercialisation options, including
standalone development, positions us well
to monetise current and future success.
THE TEAM: Proven value generators
Our carefully assembled team has an extensive track record of exploration success, project stewardship,
development expertise and operating excellence that has repeatedly resulted in the delivery of substantial
shareholder value: Nick Rathjen (MD), Robin Cox (Technical Director), Nev Power (Chairman), Rob Waugh (NED).
THE CAPACITY: Balance sheet strength and runway
We are a business and team that is resolutely focussed on the stewardship of our shareholders’ capital and the
astute application of this capital for maximal return. We are well-funded to undertake our extensive planned
exploration and evaluation work programs throughout 2026 and beyond.
oreresources.com.au 10
Table 1 –Drill Hole Significant Intercepts >0.3% Li2O
(Intervals represented as down dole length)
Hole ID
Depth From
(m)
Depth
To (m)
Interval Width
(m)
Grade
Li2O% Intercept Description
KHRC198 115 117 2 1.28 2m @ 1.28 % fr 115
KHRC199 111 122 11 1.05 11m @ 1.05 % fr 111
KHRC199 158 163 5 1.09 5m @ 1.09 % fr 158
KHRC200 105 106 1 0.34 1m @ 0.34 % fr 105
KHRC200 132 134 2 0.62 2m @ 0.62 % fr 132
KHRC200 138 142 4 0.5 4m @ 0.50 % fr 138
KHRC200 145 155 10 1.03 10m @ 1.03 % fr 145
KHRC201 130 138 8 1.09 8m @ 1.09 % fr 130
KHRC202 115 118 3 0.87 3m @ 0.87 % fr 115
KHRC203 123 124 1 0.39 1m @ 0.39 % fr 123
KHRC203 127 129 2 0.5 2m @ 0.50 % fr 127
KHRC203 137 141 4 0.45 4m @ 0.45 % fr 137
KHRC204 140 150 10 0.59 10m @ 0.59 % fr 140
KHRC207 116 117 1 0.31 1m @ 0.31 % fr 116
KHRC207 149 150 1 0.74 1m @ 0.74 % fr 149
KHRC208 136 147 11 0.71 11m @ 0.71 % fr 136
incl 141 145 4 1 4m @ 1.00 % fr 141
KHRC208 155 156 1 0.36 1m @ 0.36 % fr 155
KHRC209 68 96 28 0.89 28m @ 0.89% fr 68
incl 68 77 9 1.06 9m @ 1.06 % fr 68
and incl 82 94 12 1.01 12m @ 1.01 % fr 82
KHRC210 50 51 1 0.33 1m @ 0.33 % fr 50
KHRC211 81 82 1 0.3 1m @ 0.30 % fr 81
KHRC211 103 121 18 1.03 18m @ 1.03 % fr 103
incl 103 113 10 1.49 10m @ 1.49 % fr 103
KHRC212 141 144 3 0.71 3m @ 0.71 % fr 141
KHRC212 147 151 4 0.34 4m @ 0.34 % fr 147
KHRC213 113 117 4 1.01 4m @ 1.01 % fr 113
KHRC214 77 111 34 1.11 34m @ 1.11 % fr 77
incl 96 110 14 1.63 14m @1.63 % fr 96
KHRC215 113 119 6 0.44 6m @ 0.44 % fr 113
KHRC215 128 130 2 0.34 2m @ 0.34 % fr 128
KHRC215 133 135 2 0.83 2m @ 0.83 % fr 133
KHRC216 133 138 5 0.35 5m @ 0.35 % fr 133
KHRC216 147 159 12 1.05 12m @ 1.05 % fr 147
KHRC216 165 167 2 0.53 2m @ 0.53 % fr 2
KHRC217 NSI
oreresources.com.au 11
Table 2 – Drill Hole Location Information
(UTM MGA 94 Zone 51)
Hole ID
Hole
Type
Max Depth
(m) Easting Northing RL Azimuth Dip
KHRC198 RC 150 317968.4 6558480 396.684 90 -75
KHRC199 RC 180 317949.5 6558588 397.708 270 -60
KHRC200 RC 198 317976 6558637 397.887 90 -60
KHRC201 RC 174 317968.3 6558642 398.447 270 -60
KHRC202 RC 150 318123 6558627 392.172 0 -90
KHRC203 RC 149 318123.7 6558629 392.416 270 -60
KHRC204 RC 166 318093.6 6558699 392.433 0 -90
KHRC205 RC 216 318091.9 6558699 392.469 270 -60
KHRC206 RC 192 318097.9 6558705 392.207 90 -60
KHRC207 RC 162 317984 6558699 394.851 0 -90
KHRC208 RC 162 318120.9 6558626 392.565 270 -60
KHRC209 RC 114 317896.4 6558344 405.543 65 -60
KHRC210 RC 150 318021.4 6558399 397.097 0 -90
KHRC211 RC 198 318004.9 6558436 397.065 290 -60
KHRC212 RC 158 318113.6 6558586 393.422 300 -60
KHRC213 RC 168 317742 6558595 399.346 90 -60
KHRC214 RC 150 318028.3 6558403 396.87 280 -60
KHRC215 RC 198 317957.6 6558584 397.53 115 -60
KHRC216 RC 198 317951.9 6558589 397.528 70 -60
KHRC217 RC 150 318194.3 6558504 396.674 90 -60
oreresources.com.au 12
JORC Code, 2012 Edition, Table 1
Section 1: Sampling Techniques and Data
CRITERIA EXPLANATION COMMENTARY
Sampling
techniques
● Nature and quality of sampling (eg cut
channels, random chips, or specific
specialised industry standard
measurement tools appropriate to the
minerals under investigation, such as down
hole gamma sondes, or handheld XRF
instruments, etc). These examples should
not be taken as limiting the broad meaning
of sampling.
● Include reference to measures taken to
ensure sample representivity and the
appropriate calibration of any
measurement tools or systems used.
● Aspects of the determination of
mineralisation that are Material to the
Public Report. In cases where ‘industry
standard’ work has been done this would
be relatively simple (eg ‘reverse circulation
drilling was used to obtain 1m samples
from which 3kg was pulverised to produce
a 30g charge for fire assay’). In other
cases more explanation may be required,
such as where there is coarse gold that
has inherent sampling problems. Unusual
commodities or mineralisation types (eg
submarine nodules) may warrant
disclosure of detailed information.
Drilling
● Lithium-Caesium-Tantalum (LCT)
mineralisation at the Kangaroo Hills
Lithium Project (KHLP) has been sampled
from the following drilling techniques.
● Reverse circulation (RC) drilling creates
1m samples of pulverised chips,
approximately 3kg’s is collected in
individual calico bags
● Diamond core drilling (DD) reported
sampling is conducted on quarter core
inorder to preserve bulk sample for
metallurgical test work.
● Rock Chip samples are collected from out
crop, sub crop in the field.
Drilling
techniques
● Drill type (eg core, reverse circulation,
open-hole hammer, rotary air blast, auger,
Bangka, sonic, etc) and details (eg core
diameter, triple or standard tube, depth of
diamond tails, face- sampling bit or other
type, whether core is oriented and if so, by
what method, etc).
• RC drilling was conducted on reported
results in this announcement
• HQ Diamond Core drilling results have
previously been reported.
Drill sample
recovery
● Method of recording and assessing core
and chip sample recoveries and results
assessed.
● Measures taken to maximise sample
recovery and ensure representative nature
of the samples.
● Whether a relationship exists between
sample recovery and grade and whether
sample bias may have occurred due to
preferential loss/gain of fine/coarse
material.
• Sample recovery is noted in the field for
each individual sample. Sample is
collected via a cyclone and cone splitter
attached to the drill rig, which is
considered standard for RC sampling.
• Diamond core recovery is recorded by
both the drilling contractors and
measured by FBM geologists
• No relationship between sample recovery
and grade has been yet observed and no
sample bias is believed to have occurred.
Logging
● Whether core and chip samples have been
geologically and geotechnically logged to a
level of detail to support appropriate
Mineral Resource estimation, mining
studies and metallurgical studies.
• Drill chips are lithologically logged by
Geologists in the field
• Logging is qualitative, recording rock type
and mineral abundance
oreresources.com.au 13
● Whether logging is qualitative or
quantitative in nature. Core (or costean,
channel, etc) photography.
● The total length and percentage of the
relevant intersections logged.
• Logging of RC chips is conducted on a 1
metre sample size.
• Core is logged lithologically by Geologists
in the field.
• Natural changes in mineral abundance
are recorded
Sub-sampling
techniques and
sample
preparation
● If core, whether cut or sawn and whether
quarter, half or all core taken.
● If non-core, whether riffled, tube sampled,
rotary split, etc and whether sampled wet
or dry.
● For all sample types, the nature, quality
and appropriateness of the sample
preparation technique.
● Quality control procedures adopted for all
sub-sampling stages to maximise
representivity of samples.
● Measures taken to ensure that the
sampling is representative of the in-situ
material collected, including for instance
results for field duplicate/second-half
sampling.
● Whether sample sizes are appropriate to
the grain size of the material being
sampled.
● 1m RC percussion, sample is split via a
cyclone and cone splitter attached to the
drill rig to produce a bagged 3kg sample.
● Certified reference material and blank
material are inserted every 20 samples as
per company QA/QC procedure for both
DD & RC.
● Field duplicates collected from the Cyclone
and cone splitter are inserted every 60
samples
● Sample weights per metre range between
1-3kg.
● Diamond core sampling will consist of cut
core with quarter core utilised for
geochemical assay.
oreresources.com.au 14
Quality of assay
data and
laboratory tests
● The nature, quality and appropriateness of
the assaying and laboratory procedures
used and whether the technique is
considered partial or total.
● For geophysical tools, spectrometers,
handheld XRF instruments, etc, the
parameters used in determining the
analysis including instrument make and
model, reading times, calibrations factors
applied and their derivation, etc.
● Nature of quality control procedures
adopted (eg standards, blanks, duplicates,
external laboratory checks) and whether
acceptable levels of accuracy (i.e. lack of
bias) and precision have been established.
● ALS Minerals, Lithium samples have been
fused with Na2O2 and digested in
hydrochloric acid, the solution is analysed
by ICP; laboratory package code ME-
MS81 ICP-AES, ME-MS91. The method is
considered a whole rock analysis.
● A stoichiometric conversion of Li to Li2O is
applied consisting of a factor 2.153.
● Certified Reference Material (CRM’s) and
quartz blank (Blanks) samples are inserted
1:20 for DD & RC and 1:30 for AC as part
of Future Battery’s QA/QC procedure.
Accuracy and performance of CRM’s and
Blanks are considered after results are
received.
● Field duplicates collected from the Cyclone
and cone splitter are inserted every 30
samples
● Rock Chip samples for Lithium
Investigation have been fused with Na2O2
and digested in hydrochloric acid, the
solution is analysed by ICP ALS Minerals
Laboratories ME-MS81 ICP-AES, ME-
MS91. The method is considered a whole
rock analysis.
X-Ray Diffraction
● Semi Quantitative X-Ray Diffraction was
caried out on rock chip samples by ALS
Laboratories.
● The analysis provides both a qualitative
assessment of the mineralogy and a
quantitative result.
Verification of
sampling and
assaying
● The verification of significant intersections
by either independent or alternative
company personnel.
● The use of twinned holes.
● Documentation of primary data, data entry
procedures, data verification, data storage
(physical and electronic) protocols.
● Discuss any adjustment to assay data.
• No third-party verification has been
completed to date
• Drill holes have not been twinned
• All primary paper data is held on site,
digitised data is held in a managed
database off site.
• No adjustments to assays have occurred.
Location of data
points
● Accuracy and quality of surveys used to
locate drill holes (collar and down-hole
surveys), trenches, mine workings and
other locations used in Mineral Resource
estimation.
● Specification of the grid system used.
● Quality and adequacy of topographic
control.
• Drill collars were surveyed in
GDA94/MGA Zone 51 datum by handheld
GPS +-5m accuracy
• At completion of programme drill collars
will be surveyed using a Differential GPS
+- 0.1m accuracy.
• Rock Chip samples are recoded with
handheld GPS.
oreresources.com.au 15
Data spacing and
distribution
● Data spacing for reporting of Exploration
Results.
● Whether the data spacing and distribution
is sufficient to establish the degree of
geological and grade continuity appropriate
for the Mineral Resource and Ore Reserve
estimation procedure(s) and classifications
applied.
● Whether sample compositing has been
applied.
• Drill data spacing is sufficient to establish
the degree of geological and grade
continuity appropriate for this stage of
exploration and understanding of
mineralisation
Orientation of
data in relation to
geological
structure
● Whether the orientation of sampling
achieves unbiased sampling of possible
structures and the extent to which this is
known, considering the deposit type.
● If the relationship between the drilling
orientation and the orientation of key
mineralised structures is considered to
have introduced a sampling bias, this
should be assessed and reported if
material.
• Drill holes azimuths are commonly
planned perpendicular to stratigraphic
strike where practicable.
• Drill hole dip is regarded suitable for
subvertical stratigraphy and provides a
near too true width intersection to
minimise orientation bias.
● The geometry of drill holes relative to the
mineralised zones achieves unbiased
sampling of this deposit type.
● No orientation-based sampling bias has
been identified.
Sample security
● The measures taken to ensure sample
security. • Drill samples are collected in labelled
polyweave bags and closed with tight zip
ties.
• Samples are transported within 1-2days
of hole completion by field staff directly to
ALS laboratories.
Audits or reviews
● The results of any audits or reviews of
sampling techniques and data.
● No independent audit or review has been
undertaken.
Section 2: Reporting of Exploration Results
CRITERIA EXPLANATION COMMENTARY
Mineral tenement
and land tenure
status
● Type, reference name/number, location
and ownership including agreements or
material issues with third parties such as
joint ventures, partnerships, overriding
royalties, native title interests, historical
sites, wilderness or national park and
environmental settings.
● The security of the tenure held at the
time of reporting along with any known
impediments to obtaining a licence to
operate in the area.
● The Kangaroo Hill Lithium Project
consists of 8 prospecting leases.
● P15/5740, P15/5741, P15/5742,
P15/5743, P15/5749, P15/5750,
P15/5963, P15/5965, M15/1887 (in
application), M15/1905 (in application),
P15/6681 (in application), P15/6813 (in
application)
● All leases are held by Eastern
Coolgardie Goldfields Pty Ltd (ECG), a
subsidiary of Future Battery Minerals
Ltd
● Tenements P15/5741, P15/5963 and
P15/5965 overlap the Kangaroo Hills
Timber Reserve, a C class multi-
purpose reserve
● FBM operated under an approved
Conservation Management Plan within
the reserve.
oreresources.com.au 16
● No known royalties exist on the KHLP
leases.
● There are no material issues with regard
to access.
● The tenements are in good standing
and no known impediments exist.
The Miriam Project consists of 5
prospecting leases.
Granted leases are P15/6136,
P15/6137, P156138 and P15/6139.
P15/6135 remains in application
Leases P15/6136-6139 are held by
Coolgardie Nickel Pty Ltd, now an 85%
subsidiary of Future Battery Minerals
Ltd. P15/6135 is held by Limelight
Industries Pty Ltd until time of grant
The tenements are located in the
Kangaroo Hills Timber Reserve, an
approved Conservation Management
Plan provides conditional access to the
tenure.
The tenements are in good standing
and no known impediments exist.
a.
Exploration done by
other parties
● Acknowledgment and appraisal of
exploration by other parties.
● Focus Minerals owned the project
between 2007-2020.
● Data collected by these entities has
been reviewed in detail by FBM.
Geology
● Deposit type, geological setting and style
of mineralisation.
● The Kangaroo Hills Lithium Project is
regarded as a Lithium Caesium
Tantalum (LCT) enriched pegmatite
which intrudes older Archaean aged
greenstone lithologies.
Drill hole Information
● A summary of all information material to
the understanding of the exploration
results including a tabulation of the
following information for all Material drill
holes:
● easting and northing of the drill hole
collar
● elevation or RL (Reduced Level –
elevation above sea level in metres)
of the drill hole collar
● dip and azimuth of the hole
● down hole length and interception
depth
● hole length.
● If the exclusion of this information is
justified on the basis that the information
is not Material and this exclusion does
not detract from the understanding of the
report, the Competent Person should
clearly explain why this is the case.
● Drill hole location tables has been
included in this announcement.
● Previous results have been supplied in
past cross-referenced announcements.
Data aggregation
methods
● In reporting Exploration Results,
weighting averaging techniques,
maximum and/or minimum grade
truncations (eg cutting of high grades)
and cut-off grades are usually Material
and should be stated.
● Exploration Results were reported by
using the weighted average of each
sample result by its corresponding
interval length, as is industry standard
practice.
● Grades >0.3% Li2O are considered
significant for mineralisation purposes.
oreresources.com.au 17
● Where aggregate intercepts incorporate
short lengths of high-grade results and
longer lengths of low-grade results, the
procedure used for such aggregation
should be stated and some typical
examples of such aggregations should
be shown in detail.
● The assumptions used for any reporting
of metal equivalent values should be
clearly stated.
● A lower cut-off grade of 0.3% Li2O has
been used to report the Exploration
results. Top-cuts were deemed not
applicable.
● Metal equivalent values have not been
used.
Relationship
between
mineralisation
widths and intercept
lengths
● These relationships are particularly
important in the reporting of Exploration
Results.
● If the geometry of the mineralisation with
respect to the drill hole angle is known,
its nature should be reported.
● If it is not known and only the down hole
lengths are reported, there shoul
Share your feedback
Discover