Miriam Phase 3 Assays Expand the Gold System at Forrest
Released
Released
Announcement PDF
ASX Announcement
20 January 2026
ASX: OR3
Follow Us
E. info@oreresources.com.au
P. +618 6383 7817
oreresources.com.au
ORE Resources
Suite 10, 38 Colin St, West Perth WA 6005
MIRIAM PHASE 3 ASSAYS FURTHER EXPAND THE
EMERGING GOLD SYSTEM AT FORREST
Ore Resources Ltd (ASX: OR3) (Ore or the Company) is pleased to announce receipt of assay results from the
recent gold-focused Phase 3 Reverse Circulation (RC) drilling programme at its 100%-owned Miriam Project
(Miriam) located in the W.A. Goldfields region of Western Australia.
HIGHLIGHTS
• Assay results received for all 16 holes (approx. 3,000m) from Phase 3 RC drilling at Forrest prospect.
• Results confirm multiple extensions to previously identified fresh rock gold lodes, with mineralisation
remaining open in multiple directions:
o Stand-out intercept at hole FGRC047 extends two previous Phase 2 drill holes, returning 20m @
2.27 g/t Au from 183m (+50m down dip extension of hole FGRC024), and 12m @ 1.23 g/t Au from
108m (~90m down dip extension of hole FGRC025)
o 18m @ 2.25 g/t Au from 66m (FGRC043) including 6m @ 5.05 g/t Au from 72m
o 25m @ 1.20 g/t Au from 123m (FGRC045) including 4m @ 3.57 g/t Au from 123m
o 10m @ 2.17 g/t Au from 124m (FGRC046)
• Holes FGRC043 and FGRC046 represent the southernmost drill holes at Forrest, extending the strike of
Forrest by a further 100m and indicating that the system remains open along strike and at depth.
• Key oxide extension of hole FGRC004 (previously intersected 33m @ 2.80 g/t Au from 35m) identified
50m to the south and remains open:
o 25m @ 3.01 g/t Au from 36m (FGRC038) including 3m @ 8.45 g/t Au from 57m
• Several new fresh rock gold lodes identified at depth, with notable results including:
o 4m @ 2.92 g/t Au from 213m (FGRC047)
o 4m @ 2.12 g/t Au from 74m (FGRC036)
o 4m @ 3.05 g/t Au from 115m (FGRC037)
• Drilling to recommence at Miriam in February 2026 with its 3,000m Phase 4 RC drilling programme
targeting further oxide and fresh rock extensions at Forrest.
• Soil sampling results over Miriam’s regional prospects expected in the coming weeks.
• Ore to commence Aircore (AC) drilling of prospective drill ready regional prospects late March 2026.
• Ore is well funded to advance all planned exploration programmes at its Coolgardie and Randalls
Projects in 2026, with a pro-forma cash balance of approx. A$10.69M0F
1
.
1 Pro-forma cash balance is based on the current cash position including proceeds received from completion of Tranche 1 Placement (unaudited).
oreresources.com.au 2
Ore Resources’ Managing Director and CEO, Nick Rathjen, commented:
“Our Phase 3 RC drilling programme at Miriam has once again delivered on all fronts, returning exceptional gold
intercepts that reinforce the scale and growth potential of the emerging multi-lode gold system at Forrest.
“Phase 3 has confirmed multiple new extensions to previously defined fresh rock gold lodes, including standout
hole FGRC047, which extended two Phase 2 intercepts and uncovered new fresh rock mineralisation at depth.
The significant shallow oxide trend first identified in Phase 1 has also been extended by more than 50m to the
southwest into currently untested ground at Forrest, suggesting greater oxide mineralisation growth potential.
Importantly, Phase 3 has also identified several new fresh rock gold lodes highlighting meaningful upside still to
be unlocked across the broader Forrest tenure.
“Looking ahead, our primary goal for 2026 is to continue building value at our Coolgardie Gold Project. Drilling
is set to recommence at Miriam in February 2026 with a 3,000m Phase 4 RC drilling programme targeting further
extensions to both new and existing high-grade gold lodes within the Forrest system. In parallel, we are
advancing a substantial regional exploration programme at Coolgardie, incorporating magnetic geophysics,
geochemical sampling and close-spaced gravity work across Miriam and Burbanks East, ahead of the of AC
drilling at priority regional targets in late March 2026.”
Phase 3 RC Drilling Programme Overview
Since mid-2025, Ore has achieved significant exploration success at Miriam with its Phase 1 and Phase 2 RC
drilling programmes returning both shallow oxide and high-grade primary fresh rock gold lodes, demonstrating
an emerging multi-lode gold mineralised system at Forrest. The Phase 3 RC drilling programme was designed to
further evaluate and expand on these highly encouraging results.
Phase 3 drilling was completed in late December 2025, comprising 16 holes for approximately 3,000m drilled.1F
2
Several holes were designed to follow-up and extend key Phase 2 fresh rock intercepts in FGRC024, FGRC025,
and FGRC027. This drilling was conducted in a grid layout to delineate the strike and dip direction of these lodes
(Figure 1) ahead of future targeted drilling.
These Phase 2 drill holes previously returned significant gold intercepts, including:2F
3
• 12m @ 12.18 g/t Au from 48m (FGRC027)
• 25m @ 3.28 g/t Au from 119m to EOH (FGRC024), including 6m @ 10.76g/t Au from 131m
• 12m @ 1.25 g/t Au from 117m (FGRC025) and 14m @ 1.09 g/t Au from 16m
Additionally, a fence line of drill holes (FGRC036–FGRC038) tested the extension of shallow oxide
mineralization previously intersected in Phase 1 drill hole FGRC004, which returned 33m @ 2.80 g/t Au from
35m.3F
4,
4F
5
All Phase 3 assay results have now been received, returning outstanding new gold intercepts.
2 Refer to OR3 ASX release dated 17 December 2025, “Completion of Miriam Phase 3 Gold Drilling”
3 Refer to OR3 ASX release dated 10 November 2025, “New Thick High-Grade Gold Lodes and Extensions at Forrest”
4 Refer to OR3 ASX release dated 2 September 2025, “Thick, High-Grade Gold Intersected at Forrest”
5 Refer to OR3 ASX release dated 20 October 2025, “Single-Metre Assays Enhance High-Grade Gold Potential at Miriam”
oreresources.com.au 3
Figure 1: Forrest Plan View with significant Phase 3 drill results
The stand-out Phase 3 result was returned from hole FGRC047, which successfully produced down-dip
mineralised extensions to two Phase 2 drill holes at FGRC024 and FGRC025. Hole FGRC047 delivered an
extension of more than 50m to hole FGRC024, returning 20m @ 2.27 g/t Au from 183m, and extended hole
FGRC025 by more than 90m, returning 12m @ 1.23g/t Au from 119m.
oreresources.com.au 4
Figure 2: Cross section – Hole FGRC047 representing a high-grade down-dip extension
Additionally, hole FGRC045 intercepted 25m @ 1.20 g/t Au from 123m representing an approximate 80m strike
and dip extension to the previously reported Phase 2 drill hole FGRC027 (which returned the previous stand-out
intercept of 12m @ 12.18g/t Au from 48m).
It remains uncertain whether FGRC045 has adequately tested the geometry and high-grade portion of this lode.
The new intercept however provides an important marker for further testing of this thick high-grade lode and
follow-up testing is scheduled to commence during the upcoming Phase 4 RC drilling programme.
Lastly, the final line in this Phase 3 grid drilling delivered a significant strike extension of over 100m in fresh rock,
with drill holes FGRC043 and FGRC046 intercepting 18m @ 2.25 g/t Au from 66m and 10m @ 2.17 g/t Au from
124m, respectively. These results confirm continued strike continuity, indicating that the Forrest gold system
remains open to the south.
oreresources.com.au 5
Figure 3: Cross section – Hole FGRC043 and new gold lodes in the west of Forrest
Phase 3 drilling has also successfully extended the strike extension of the key shallow oxide gold lode previously
identified with Phase 1 drill hole FGRC004 with the fence line consisting of holes FGRC036-038 all returning
significant intercepts. Notably, hole FGRC038 confirmed a strike extension of over 50m to this key oxide lode,
returning 25m @ 3.01 g/t Au from 36m.
With these new results, this lode is now interpreted to project in a south-westerly (SW) direction into an
untested area of the Forrest tenure. This structural orientation highlights potential for further shallow, high-
grade oxide gold mineralization growth at Forrest.
oreresources.com.au 6
Figure 4: Cross section – Hole FGRC038 oxide extension & New Lode Discovery
Importantly, Ore has also identified several new gold lodes at depth. In addition to the extensions of fresh rock
lodes, Hole FGRC047 also intersected a new fresh rock lode, returning 4m @ 2.92 g/t Au from 213m. To the
west, scout drill holes FGRC049-051 each intercepted gold grades of > 1g/t over 4m intervals.
Additionally, holes FGRC036-037 intercepted a new, continuous, high-grade zone of 4m @ 3.05 g/t from 115m
(FGRC037) and 4m @ 2.12 g/t Au from 74m (FGRC036) adjacent to the extended shallow oxide trend.
Refer to Appendix 1 for all drill hole collar locations and assay results.
oreresources.com.au 7
Next steps
With the receipt of all Phase 3 results, Ore intends to commence its Phase 4 RC drilling programme in early
February 2026 with 3,000m of RC drilling targeting further oxide and fresh rock extensions at Forrest. Much of
the currently identified 850m mineralized strike at Forrest remains undertested and Ore will target further strike
and dip extensions to the system.
Figure 5: Forrest Schematic Long Section
An expansive regional exploration programme has also been planned at Miriam for 2026, targeting new and
underexplored regional prospects adjacent to and surrounding the growing gold system at Forrest. Importantly,
Ore plans to drill over 30,000m in 2026 at the Coolgardie Project, consisting of a combination of regional AC,
targeted RC and Diamond core. The multi-phase programme will aim to further expand the Forrest footprint
and produce new discoveries in the Coolgardie tenure.
The results from the previously completed soil sampling programme are expected in January 2026, covering the
vast majority of the northern part of Miriam, previously never sampled. Additionally, close-spaced ground
gravity surveying is underway at the Forrest, Burbanks Monarch, Jungle and Goroke prospects, with results
expected to be returned by late February 2026.
Historical wide spaced drilling conducted at Jungle, Burbanks Monarch and Goroke intercepted prospective
mineralised zones. Only limited drilling has tested these occurrences and more work is required to better
evaluate their potential. Following the completion of these target generative activities, Ore intends to
commence its first phase of AC drilling at regional prospects from late-March 2026.
oreresources.com.au 8
Key intercepts include5F
6
:
4m @ 3.77g/t Au from 94m (FGC001) Jungle
10m @ 0.62g/t from 30m (DPR022) Jungle
5m @ 2.3 g/t Au from surface (MID014) Goroke
12m @ 1.04g/t Au from 15m (FGA059) Goroke
5m @ 1.94g/t Au from 25m (FGA073) Burbanks Monarch
10m @ 0.90g/t from 30m (FGA050) Burbanks Monarch
Figure 5: Miriam Project Map
6 Refer to OR3 ASX release dated 27 May 2025, “Key Gold Prospects Identified at Miriam”
oreresources.com.au 9
Table 1 –Drill Hole Significant Intercepts >0.3g/t
(Intervals represented as down dole length)
Hole ID From To Interval
Grade Au
(g/t) Intercept
Gram X
M
FGRC036 74 78 4 2.12 4.00m @ 2.12 g/t 8.48
FGRC037 24 36 12 0.56 12.00m @ 0.56 g/t 6.72
FGRC037 115 119 4 3.05 4.00m @ 3.05 g/t 12.2
FGRC038 36 61 25 3.01 25.00m @ 3.01 g/t 75.25
including 57 60 3 8.45 3m @ 8.45g/t57m 25.35
FGRC038 73 74 1 0.42 1.00m @ 0.42 g/t 0.42
FGRC039 125 141 16 0.85 16.00m @ 0.85 g/t 13.6
including 125 129 4 1.52 4m @ 1.52g/t125m 6.08
FGRC040 46 48 2 0.5 2.00m @ 0.50 g/t 1
FGRC040 52 53 1 0.74 1.00m @ 0.74 g/t 0.74
FGRC040 80 85 5 0.91 5.00m @ 0.91 g/t 4.55
FGRC040 133 141 8 0.81 8.00m @ 0.81 g/t 6.48
FGRC040 145 153 8 0.47 8.00m @ 0.47 g/t 3.76
FGRC041 80 96 16 0.77 16.00m @ 0.77 g/t 12.32
FGRC041 106 116 10 0.44 10.00m @ 0.44 g/t 4.4
FGRC041 121 122 1 1.01 1.00m @ 1.01 g/t 1.01
FGRC041 130 131 1 1.39 1.00m @ 1.39 g/t 1.39
FGRC042 124 129 5 1.05 5.00m @ 1.05 g/t 5.25
FGRC042 137 138 1 0.64 1.00m @ 0.64 g/t 0.64
FGRC042 179 183 4 2.18 4.00m @ 2.18 g/t 8.72
FGRC043 53 54 1 0.42 1.00m @ 0.42 g/t 0.42
FGRC043 66 84 18 2.25 18.00m @ 2.25 g/t 40.5
including 72 78 6 5.05 6m @ 5.05g/t 30.3
FGRC044 69 71 2 0.84 2.00m @ 0.84 g/t 1.68
FGRC044 118 119 1 0.38 1.00m @ 0.38 g/t 0.38
FGRC044 144 148 4 0.56 4.00m @ 0.56 g/t 2.24
FGRC044 173 174 1 0.55 1.00m @ 0.55 g/t 0.55
FGRC045 123 144 25 1.2 25.00m @ 1.20 g/t 30
including 123 127 4 3.57 4.00m @ 3.57 g/t 14.28
FGRC046 40 44 4 0.47 4.00m @ 0.47 g/t 1.88
FGRC046 124 134 10 2.17 10.00m @ 2.17 g/t 21.7
FGRC047 24 28 4 0.7 4.00m @ 0.7 g/t 2.8
FGRC047 108 120 12 1.23 12.00m @ 1.23 g/t 14.76
FGRC047 183 203 20 2.27 20.00m @ 2.27 g/t 45.4
FGRC047 213 217 4 2.92 4.00m @ 2.92 g/t 11.68
FGRC048 28 36 8 0.5 8.00m @ 0.50 g/t 4
FGRC048 117 123 6 0.71 6.00m @ 0.71 g/t 4.26
FGRC049 96 100 4 1.15 4.00m @ 1.15 g/t 4.6
FGRC049 122 127 5 0.52 5.00m @ 0.52 g/t 2.6
oreresources.com.au 10
FGRC050 68 72 4 0.32 4.00m @ 0.32 g/t 1.28
FGRC050 90 91 1 7.13 1.00m @ 7.13 g/t 7.13
FGRC050 120 124 4 1.16 4.00m @ 1.16 g/t 4.64
FGRC051 152 156 4 1.02 4.00m @ 1.02 g/t 4.08
Table 2 – Drill Hole Location Information
(UTM MGA 94 Zone 51)
Hole ID
Hole
Type Depth Easting Northing RL
FGRC036 RC 108 319722.9 6562883 405.187
FGRC037 RC 150 319744 6562885 405.907
FGRC038 RC 180 319769.4 6562883 405.229
FGRC039 RC 204 319679.4 6562807 402.705
FGRC040 RC 186 319705.6 6562761 402.309
FGRC041 RC 180 319709.4 6562740 401.76
FGRC042 RC 186 319686.1 6562704 401.14
FGRC043 RC 180 319728.9 6562662 400.847
FGRC044 RC 180 319665.2 6562764 401.735
FGRC045 RC 186 319670.8 6562738 401.591
FGRC046 RC 192 319690.2 6562661 401.123
FGRC047 RC 222 319837.6 6562818 407.765
FGRC048 RC 222 319816.5 6562746 404.789
FGRC049 RC 180 319601.5 6562716 401.586
FGRC050 RC 180 319618.2 6562660 401.31
FGRC051 RC 204 319587.4 6562659 402.016
This announcement has been authorised for release by the Board of Directors of the Company.
For further information, visit http://www.oreresources.com.au/ or contact:
Nicholas Rathjen Robin Cox
CEO & Managing Director Technical Director
E: nrathjen@oreresources.com.au E: rcox@oreresources.com.au
oreresources.com.au 11
Competent Persons Statement
The information in this announcement that relates to exploration results is based on and fairly represents information compiled
by Mr Robin Cox BSc (E.Geol), a Competent Person, who is a Member of the Australian Institute of Mining and Metallurgy.
Mr Cox is the Company’s Chief Geologist and has sufficient experience that is relevant to the style of mineralisation and type
of deposit under consideration and to the activity being undertaken to qualify as a Competent Person as defined in the 2012
Edition of the Australasian Code for Reporting of Exploration Results, Mineral Resources and Ore Reserves. Mr Cox consents
to the inclusion in this announcement of the matters based on his information in the form and context in which it appears.
Forward-Looking Statements
This document may include forward-looking statements. Forward-looking statements include, but are not limited to, statements
concerning Ore Resource Limited’s planned exploration programme and other statements that are not historical facts. When
used in this document, the words such as “could,” “plan,” “estimate,” “expect,” “intend,” “may”, “potential”, “should,” and similar
expressions are forward-looking statements. Although Ore Resources Limited believes that its expectations reflected in these
forward-looking statements are reasonable, such statements involve risks and uncertainties, and no assurance can be given
that actual results will be consistent with these forward-looking statements.
Previously Reported Results
The information in this announcement that relates to Exploration Results is extracted from the ASX announcements (Original
Announcements), as referenced, which are available at www.oreresources.com.au. Ore confirms that it is not aware of any
new information or data that materially affects the information included in the Original Announcements and, that all material
assumptions and technical parameters underpinning the estimates in the Original Announcements continue to apply and have
not materially changed. Ore confirms that the form and context in which the Competent Persons’ findings are presented have
not been materially modified from the original announcement.
oreresources.com.au 12
About Ore Resources Ltd (ASX:OR3)
THE BUSINESS: Gold and lithium exploration and development
Ore Resources (ASX: OR3) is an exploration and development company focused on rapidly advancing its 100%
owned Coolgardie and Randalls Gold and Lithium Projects in the Eastern Goldfields of Western Australia.
THE LOCATION: Infrastructure-rich project setting
The Eastern W.A. Goldfields is an
outstanding location in which to explore for,
build, and operate gold and lithium mines. It
is a long-established mining province with all
the accompanying benefits, including all-
year land access, skilled labour, mining
services and infrastructure.
The Projects are positioned within 50km of
the mining hub of Kalgoorlie (via sealed and
access roads), approximately 370km to the
port of Esperance and approximately 550km
to Perth via road and rail. We are proximal to
multiple gold and lithium mining and
processing operations and development
projects of substantial scale.
This available range of potential
commercialisation options, including
standalone development, positions us well
to monetise current and future success.
THE TEAM: Proven value generators
Our carefully assembled team has an extensive track record of exploration success, project stewardship,
development expertise and operating excellence that has repeatedly resulted in the delivery of substantial
shareholder value: Nick Rathjen (MD), Robin Cox (Technical Director), Nev Power (Chairman), Rob Waugh (NED).
THE CAPACITY: Balance sheet strength and runway
We are a business and team that is resolutely focussed on the stewardship of our shareholders’ capital and the
astute application of this capital for maximal return. We are well-funded to undertake our extensive planned
exploration and evaluation work programs throughout 2026 and beyond.
oreresources.com.au 13
JORC Code, 2012 Edition, Table 1
Section 1: Sampling Techniques and Data
CRITERIA EXPLANATION COMMENTARY
Sampling
techniques
• Nature and quality of sampling (eg cut
channels, random chips, or specific
specialised industry standard
measurement tools appropriate to the
minerals under investigation, such as
down hole gamma sondes, or handheld
XRF instruments, etc). These examples
should not be taken as limiting the broad
meaning of sampling.
• Include reference to measures taken to
ensure sample representivity and the
appropriate calibration of any
measurement tools or systems used.
• Aspects of the determination of
mineralisation that are Material to the
Public Report. In cases where ‘industry
standard’ work has been done this would
be relatively simple (eg ‘reverse
circulation drilling was used to obtain 1m
samples from which 3kg was pulverised
to produce a 30g charge for fire assay’).
In other cases more explanation may be
required, such as where there is coarse
gold that has inherent sampling
problems. Unusual commodities or
mineralisation types (eg submarine
nodules) may warrant disclosure of
detailed information.
• Reverse Circulation drilling collects a 1m
bulk sample. A 2-3kg sample is cone split
from the drill rig and collected in a pre-
marked calico bag. 4m composites
samples are collected proportionally via
spear from the 1m bulk sample. Both 1
metre and 4 metre composites are
selected for fire assay purpose producing
a 50g homogenised split for assay. When
anomalous 4m composite samples
intercepts >0.1g/t Au are received the
corresponding zone is then sub assayed
to their 1m sample.
• Certified reference material, including
known standards and blank material are
inserted at a rate of 1 in 20 for primary
samples, field duplicates are collected at
1 in 30.
• Analysis of QA/QC results is undertaken
by the company to ensure sampling
accuracy.
• Laboratory (ALS) also perform internal
Qa/Qc sampling at a rate of 1 to 25.
Drilling
techniques
• Drill type (eg core, reverse circulation,
open-hole hammer, rotary air blast,
auger, Bangka, sonic, etc) and details
(eg core diameter, triple or standard
tube, depth of diamond tails, face-
sampling bit or other type, whether core
is oriented and if so, by what method,
etc).
• Reverse Circulation uses 5.5 inch
pneumatic hammer to pulverise oxidised
and fresh rock which is then delivered to
the cyclone and cone splitter via
compressed air.
Drill sample
recovery
• Method of recording and assessing core
and chip sample recoveries and results
assessed.
• Measures taken to maximise sample
recovery and ensure representative
nature of the samples.
• Whether a relationship exists between
sample recovery and grade and
whether sample bias may have
occurred due to preferential loss/gain of
fine/coarse material.
• All 1m samples and 4m composite
samples are weighed and recorded in the
Ore database.
• Bulk sample recovery was
measured/commented in sample logs.
• No sample bias relationship has been
identified.
Logging • Whether core and chip samples have
been geologically and geotechnically
logged to a level of detail to support
appropriate Mineral Resource
estimation, mining studies and
metallurgical studies.
• Drill holes have been geologically logged
by geologists in the field, recording
lithology, oxidation, weathering, texture,
structure and mineralogy
oreresources.com.au 14
• Whether logging is qualitative or
quantitative in nature. Core (or costean,
channel, etc) photography.
• The total length and percentage of the
relevant intersections logged.
• Geological data has been recorded on
Ore database. Logging is a qualitative
nature.
Sub-sampling
techniques and
sample
preparation
• If core, whether cut or sawn and
whether quarter, half or all core taken.
• If non-core, whether riffled, tube
sampled, rotary split, etc and whether
sampled wet or dry.
• For all sample types, the nature, quality
and appropriateness of the sample
preparation technique
• Quality control procedures adopted for
all sub-sampling stages to maximise
representivity of samples.
• Measures taken to ensure that the
sampling is representative of the in-situ
material collected, including for instance
results for field duplicate/second-half
sampling.
• Whether sample sizes are appropriate
to the grain size of the material being
sampled.
• Sampling of drill chips included
compositing by spear sample on 4m
composites.
• Single metre samples were cone split to
obtain an approximate 2-3kg sample.
• Certified reference material, including
known standards and blank material are
inserted at a rate of 1 in 20 for primary
samples, field duplicates are collected at
1 in 30.
• Analysis of QA/QC results is undertaken
by the company and external consultants
to ensure sampling accuracy.
• Laboratory (ALS) also perform internal
Qa/Qc sampling at a rate of 1 to 25.
Quality of assay
data and
laboratory tests
• The nature, quality and appropriateness
of the assaying and laboratory
procedures used and whether the
technique is considered partial or total.
• For geophysical tools, spectrometers,
handheld XRF instruments, etc, the
parameters used in determining the
analysis including instrument make and
model, reading times, calibrations
factors applied and their derivation, etc.
• Nature of quality control procedures
adopted (eg standards, blanks,
duplicates, external laboratory checks)
and whether acceptable levels of
accuracy (i.e. lack of bias) and precision
have been established.
• All samples were prepared and assayed
by ALS in Perth
• Samples preparation included weighing,
pulverising and splitting.
• A 50g split was then assayed via Fire
Assay and Atomic Absorption
Spectrometer under ALS code Au-AA26
• The methodology is considered an
industry standard in determining gold
grades in known gold bearing systems.
• Internal laboratory Qa/Qc processes
were conducted including the insertion of
Certified reference material, blanks and
duplicates.
• Qa/Qc results are acceptable
Verification of
sampling and
assaying
• The verification of significant
intersections by either independent or
alternative company personnel.
• The use of twinned holes.
• Documentation of primary data, data
entry procedures, data verification, data
storage (physical and electronic)
protocols.
• Discuss any adjustment to assay data.
• Significant intercepts are calculated by
database algorithm and verified by Ore
staff and Database contractors.
• All field data is imported to the Ore
geochemistry database utilising industry
data logging software LogChief. This is
uploaded to sequel server database
hosted on Maxwell Geoservices
proprietry software and managed for Ore
by an external database company
Mitchell River Group Pty Ltd.
• No adjustments are made to assay data
• Gold significant intercepts are calculated
using a 0.3g/t lower cut off.
• Grade by metre calculations are a simple
multiplication of the gold grade by the
width of the intercept and this is used to
weight the significance of an intercept.
oreresources.com.au 15
• Ore twinned selective historic drill holes
of identified lodes to determine accuracy
of historic results.
Location of data
points
• Accuracy and quality of surveys used to
locate drill holes (collar and down-hole
surveys), trenches, mine workings and
other locations used in Mineral
Resource estimation.
• Specification of the grid system used.
• Quality and adequacy of topographic
control.
• Drill Holes were surveyed utilising a
Differential GPS with sub 1cm accuracy
including elevation
• All drill hole collar information has been
supplied and projected to UTM MGA 94
Zone 51
Data spacing
and distribution
• Data spacing for reporting of
Exploration Results.
• Whether the data spacing and
distribution is sufficient to establish the
degree of geological and grade
continuity appropriate for the Mineral
Resource and Ore Reserve estimation
procedure(s) and classifications
applied.
• Whether sample compositing has been
applied.
• At Forrest, holes were drilled on 30m
spacing, 60m line spacing.
• Data spacing is appropriate for identifying
continuous and non-continuous
geochemical anomalies and future
Mineral Resource estimates.
Orientation of
data in relation
to geological
structure
• Whether the orientation of sampling
achieves unbiased sampling of possible
structures and the extent to which this is
known, considering the deposit type.
• If the relationship between the drilling
orientation and the orientation of key
mineralised structures is considered to
have introduced a sampling bias, this
should be assessed and reported if
material.
• Drilling has been conducted on E-W grid
lines. Geological units in the region have
a dominantly N-S to NE-SW strike. As
such the E-W drilling provides relative
oblique interceptions.
• Drilling intercepted both oxide/supergene
mineralisation and fresh bedrock
intercepts. More drilling is required to
better determine the dip and direction of
the fresh bedrock gold mineralisation.
a.
Sample security • The measures taken to ensure sample
security.
• All samples are collected in the field on
the day of drilling and transported directly
to an ALS laboratory located 40km’s
away in Kalgoorlie
• Samples are delivered daily to the
Kalgoorlie ALS laboratory
• ALS transport the samples to a Perth
laboratory for analysis.
• All calico sample bags are stored within
prelabelled polly weave bags and zip tied
for transportation.
Audits or
reviews
• The results of any audits or reviews of
sampling techniques and data.
No independent audit or review has been
undertaken.
Section 2: Reporting of Exploration Results
CRITERIA EXPLANATION COMMENTARY
Mineral tenement
and land tenure
status
• Type, reference name/number, location
and ownership including agreements or
material issues with third parties such
The Miriam Project consists of 5
prospecting leases.
oreresources.com.au 16
as joint ventures, partnerships,
overriding royalties, native title
interests, historical sites, wilderness or
national park and environmental
settings.
• The security of the tenure held at the
time of reporting along with any known
impediments to obtaining a licence to
operate in the area.
• Granted leases are P15/6136,
P15/6137, P156138 and P15/6139.
P15/6135 remains in application
• Leases P15/6136-6139 are held by
Coolgardie Nickel Pty Ltd, now an
100% subsidiary of Future Battery
Minerals Ltd. P15/6135 is held by
Limelight Industries Pty Ltd until
time of grant
• The tenements are located in the
Kangaroo Hills Timber Reserve, an
approved Conservation
Management Plan permits
conditional access and exploration
of the tenure.
• The tenements are in good standing
and no known impediments exist.
Exploration done
by other parties
Acknowledgment and appraisal of
exploration by other parties.
The Historic data represented in this
announcement was culminated from the
exploration work conducted the following
parties.
• Mt Kersey Mining conducted Reverse
Circulation drilling in 1996 consisting
of 9 holes. Samples were assayed via
Fire Assay for gold and aqua regia
digest for other elements at AAL
Kalgoorlie
• Crest Mining conducted Reverse
Circulation drilling in 1996 and 1997
consisting of 38 holes. Samples were
assayed via PM203 at ALS
laboratories
• Barminco conducted Reverse
Circulation drilling in 1997 consisting
of 6 holes. Samples were assayed via
Fire Assay FA1 at Amdel
laboratories.
• Spinifex Resources conducted 3
diamond core holes targeting the
Miriam Nickel prospect in 2000.
Samples containing gold were
assayed via fire assay at Analabs
• Berkeley Resources conducted 3
diamond core and 1 RC hole
targeting the Miriam Nickel prospect
in 2004. Samples containing gold
were assayed via fire assay at
Analabs.
• Sipa Resources conducted Air Core
(73 holes), RAB (63 holes) and RC (8
holes) drilling between 2005 and
2007. Samples were assayed by
Ultratrace laboratories utili
Share your feedback
Discover