Highlights
Geophysical review of the Miriam Project identifies 13 new pegmatite targets across the 6kilometre tenement strike.
Targets include five discrete structures coincident with 1.6-kilometre soil anomaly and
outcropping spodumene-bearing pegmatite.
Structures are interpreted to be analogous to the Big Red pegmatite at KHLP, approximately
2 kilometres south, which returned 31m at 1.13% Li2O from 86m (KHRC116) 1
Follow-up surface sampling is set to commence to refine target generation with results
expected in October 2024 ahead of an initial drilling programme.
Application submitted for a Western Australian Government Exploration Incentive Scheme
(EIS) grant to co-fund the initial drill programme at Miriam.
Outcome of EIS application expected in October 2024 ahead of the commencement of drilling
scheduled for H1 CY2025.
Future Battery Minerals Ltd (ASX: FBM) (FBM or the Company) is pleased to announce outcomes from a
review and reinterpretation of geophysical data from its Miriam Lithium Project (Miriam, or the Miriam Project)
located immediately north of the Kangaroo Hills Lithium Project (KHLP).
FBM Managing Director and CEO, Nick Rathjen, commented:
“Armed with existing geological knowledge of our adjacent Kangaroo Hills Project, we were able to kick off
analysis and target-generation activities at the Miriam Project prior to acquisition completion. Southern
Geoscience’s review is now complete and has delivered promising results, with 13 new pegmatite targets
identified across the tenement area. Particularly noteworthy are the five discrete structures coinciding with a
significant soil anomaly and an outcropping spodumene-bearing pegmatite, which bear striking similarities to
the Big Red pegmatite at KHLP.
These targets have us excited for the considerable lithium potential of the Miriam Project, and we are eager to
commence follow-up surface sampling to further refine our targets. We are currently conducting a wide-spaced
extensional soil sampling programme to test for potential blind, subsurface pegmatites, including in the
northern area of the tenure. Once this is complete and following successfully acceptance of our EIS application
for co-funding for the initial drilling programme at Miriam, we plan to commence drilling in the first half of
CY2024.”
1 Refer to FBM ASX announcement 15 May 2024, “Big Red Extended with Best Intercept to Date and New Potoroo Discovery”.
Future Battery Minerals Ltd
info@futurebatteryminerals.com.au
Suite 10, 38 Colin St, West Perth WA 6005
+61 8 6383 7817
ABN 91 148 966 545
futurebatteryminerals.com.au
ASX: FBM
Follow Us
1
Background
FBM’s strategic acquisition of an 85% interest in the Miriam Project was completed in May 2024, expanding
its regional position to the north of the KHLP 2. Historic rock chip sampling on the tenement had returned up to
1.85% Li2O, with further rock-chip sampling of the original reported spodumene-bearing outcrop returning 2.0%
Li2O 3,4.
A subsequent detailed geochemical soil sampling programme revealing a primary lithium target of
approximately 1.6 kilometres in strike length, along with a second trend spanning approximately 600 metres,
linking the main pegmatite trend 5. This large lithium soil anomaly, extending from the weathered (depleted)
outcrop of spodumene-rich pegmatite, suggests a further potential trend of spodumene-bearing pegmatites
under cover.
In May 2024, Southern Geoscience was engaged to undertake a detailed review and reinterpretation of the
existing airborne magnetic and radiometric data over the Miriam Project. The review has enabled the
development of a new litho-magnetic interpretation of bedrock geology at a detailed 1:10,000 scale.
Outcomes
The review has identified 13 discrete targets characterised by significant east-west structures that crosscut the
underlying greenstone lithologies. These structures have been found to be analogous to the Big Red pegmatite
at KHLP, approximately 2 kilometres south, and are associated with coincident resistivity and gravity low
anomalies. Notably, five of these structures have aligned with a 1.6 kilometre north-south strike soil anomaly
and outcropping spodumene-bearing pegmatite, suggesting potential for an extensive shallow pegmatite
system at the southern end of Miriam.
2 Refer to FBM ASX announcement 24 May 2024, “Completion of Miriam Li Project Acquisition and Placement”.
3 Refer to Corazon ASX announcement 17 January 2023, “High Grade Lithium at Miriam Project Western Australia”.
4 Refer to FBM ASX announcement dated 23 April 2024, “Key Target Generation Advancing at Miriam Lithium Project”.
5 Refer to Corazon ASX announcement 29 March 2023, “Corazon Expands Lithium Footprint at Miriam Project in Western Australia”.
Future Battery Minerals Ltd
info@futurebatteryminerals.com.au
Suite 10, 38 Colin St, West Perth WA 6005
+61 8 6383 7817
ABN 91 148 966 545
futurebatteryminerals.com.au
ASX: FBM
Follow Us
2
Figure 1: Miriam Project reinterpreted geology and target areas
Future Battery Minerals Ltd
info@futurebatteryminerals.com.au
Suite 10, 38 Colin St, West Perth WA 6005
+61 8 6383 7817
ABN 91 148 966 545
futurebatteryminerals.com.au
ASX: FBM
Follow Us
3
The presence of these host structures in the northern part of the project area has indicated further exploration
potential, particularly in regions where limited geochemical data has existed. The geophysical review has
reprocessed existing public-domain airborne magnetic and radiometric data (50 metre spacing), identifying
demagnetisation or breaks in the serpentinised basalt and ultra-mafic lithologies where pegmatites, which have
a lower magnetic response, may have intruded. This approach has previously been successful in the KHLP
project and has the potential to yield similar results at Miriam.
Figure 2: Miriam Project magnetics with soil targets and high-grade rock chip sample results
Future Battery Minerals Ltd
info@futurebatteryminerals.com.au
Suite 10, 38 Colin St, West Perth WA 6005
+61 8 6383 7817
ABN 91 148 966 545
futurebatteryminerals.com.au
ASX: FBM
Follow Us
4
Next steps
The Company intends to further advance exploration at Miriam with an extended soil sampling programme in
the northern half of the tenement area, where, to date, no LCT surface geochemistry has been obtained. Soil
sampling is a low cost and rapid method of defining broad geochemical anomalies for immediate drill testing
or further target refinement. It is particularly effective in terrains such as the Kangaroo Hills and Miriam Projects,
where there is substantial in-situ regolith and little-to-no transported alluvium, producing a more dependable
surface geochemical data set. Results returned from soil sampling will be used to guide the geophysical
surveys, allowing for better allocation of costs and target refinement. Outcomes from the programme are
expected to be available in October 2024.
Ground gravity surveys may then be trialled on new or existing geochemical targets, with the results integrated
with current geophysical data to prioritise exploration targets.
FBM has applied for Western Australian Government support for the initial drill programme at Miriam via the
EIS, which offers up to a 50% refund for innovative exploration drilling projects. The EIS aims to stimulate
greenfield resource exploration to increase knowledge of Western Australia’s geology and resources, boost
employment opportunities, and generate new mineral and energy discoveries to meet the demand for critical
minerals. The absence of historic drilling for lithium at the Miriam Project positions it well for a successful
funding application. The Company is targeting Miriam’s initial drill programme in H1 CY2025, contingent on
the successful acceptance of the EIS application.
This announcement has been authorised for release by the Board of Directors of the Company.
-ENDFor further information visit www.futurebatteryminerals.com or contact:
Nicholas Rathjen
Robin Cox
CEO & Managing Director
Technical Director
E: nrathjen@futurebatteryminerals.com.au
E: rcox@futurebatteryminerals.com.au
Competent Persons Statement
The information in this announcement that relates to exploration results is based on and fairly represents information
compiled by Mr Robin Cox BSc (E.Geol), a Competent Person, who is a Member of the Australian Institute of Mining and
Metallurgy. Mr Cox is the Company’s Chief Geologist and has sufficient experience that is relevant to the style of
mineralisation and type of deposit under consideration and to the activity being undertaken to qualify as a Competent
Person as defined in the 2012 Edition of the Australasian Code for Reporting of Exploration Results, Mineral Resources
and Ore Reserves. Mr Cox consents to the inclusion in this announcement of the matters based on his information in the
form and context in which it appears.
The information in this announcement that relates to Geophysical Results is based on and fairly represents information
compiled by Mr Matthew Hutchens (BSc. Hons. (Geophysics) Principal Geophysicist at Southern Geoscience, a
Competent Person, who is a Member of the Australian Society of Economic Geophysicists (ASEG). Mr Hutchens is a
consultant to the company and has sufficient experience that is relevant to the style of mineralisation and type of deposit
under consideration and to the activity being undertaken to qualify as a Competent Person as defined in the 2012 Edition
of the Australasian Code for Reporting of Exploration Results, Mineral resources and Ore Reserves. Mr Hutchens
consents to the inclusion in this announcement of the matters based on his information in the form and context in which it
appears.
Forward-Looking Statements
This document may include forward-looking statements. Forward-looking statements include, but are not limited to,
statements concerning Future Battery Minerals Limited’s planned exploration programme and other statements that are
not historical facts. When used in this document, the words such as "could," "plan," "estimate," "expect," "intend," "may”,
"potential", "should," and similar expressions are forward-looking statements. Although Future Battery Minerals Limited
believes that its expectations reflected in these forward-looking statements are reasonable, such statements involve risks
and uncertainties and no assurance can be given that actual results will be consistent with these forward-looking
statements.
Future Battery Minerals Ltd
info@futurebatteryminerals.com.au
Suite 10, 38 Colin St, West Perth WA 6005
+61 8 6383 7817
ABN 91 148 966 545
futurebatteryminerals.com.au
ASX: FBM
Follow Us
5
Previously Reported Results
The information in this announcement that relates to Exploration Results is extracted from the ASX announcements
(Original Announcements), as referenced, which are available at www.futurebatteryminerals.com.au. FBM confirms that it
is not aware of any new information or data that materially affects the information included in the Original Announcements
and, that all material assumptions and technical parameters underpinning the estimates in the Original Announcements
continue to apply and have not materially changed. FBM confirms that the form and context in which the Competent
Persons’ findings are presented have not been materially modified from the original announcement.
Future Battery Minerals Ltd
info@futurebatteryminerals.com.au
Suite 10, 38 Colin St, West Perth WA 6005
+61 8 6383 7817
ABN 91 148 966 545
futurebatteryminerals.com.au
ASX: FBM
Follow Us
6
About Future Battery Minerals (ASX: FBM)
Future Battery Minerals (ASX: FBM) is a future-facing minerals exploration and development company focused
on rapidly advancing its two new world-class lithium discoveries.
Our flagship asset is the 100%-owned Kangaroo Hills Lithium Project (KHLP). The KHLP is located in the
Goldfields of Western Australia, approximately 17km south of the major township of Coolgardie, and hosts the
exciting Big Red, Rocky and Potoroo hard rock lithium discoveries. Immediately north and contiguous to the
KHLP is the Miriam Project, the recent acquisition of which doubled our regional footprint. Miriam is located
immediately along strike from the KHLP and holds a large historic lithium soil anomaly extending from an
outcropping spodumene-rich pegmatite, providing a significant opportunity for future discovery success. These
project areas are being rapidly advanced in parallel by FBM’s experienced team, focusing on resource growth,
metallurgical test work and development readiness.
The Goldfields are a lithium endowed province of Western Australia, with numerous operating and developing
Lithium projects. Notably, the KHLP is only 30km’s west of the Mt Marrion Lithium Mine operated by Mineral
Resources Ltd (ASX: MIN). KHLP and Miriam are accessible via a sealed road leading south from Coolgardie,
ensuring the Company has continuous access all year-round.
Our other key portfolio asset is the Nevada Lithium Project (NLP). A large-scale, high-grade maiden lithium
claystone Mineral Resource Estimate (MRE) was recently declared for the Lone Mountain deposit within the
NLP, with this MRE being delivered less than 12 months from discovery. The business is evaluating a range
of potential commercialisation routes for the NLP.
About Lithium
Lithium is a soft silvery-white metal which is highly reactive and does not occur in nature in its elemental form.
In nature it occurs as compounds within hard rock deposits, salt brines and claystone. Lithium and its chemical
compounds have a wide range of industrial applications resulting in numerous chemical and technical uses.
Lithium has the highest electrochemical potential of all metals, a key property in its role in lithium-ion batteries.
Future Battery Minerals Ltd
info@futurebatteryminerals.com.au
Suite 10, 38 Colin St, West Perth WA 6005
+61 8 6383 7817
ABN 91 148 966 545
futurebatteryminerals.com.au
ASX: FBM
Follow Us
7
JORC Code, 2012 Edition, Table 1 (Kangaroo Hills Lithium Project)
Section 1: Sampling Techniques and Data
CRITERIA
Sampling techniques
Drilling techniques
Drill sample
recovery
EXPLANATION
● Nature and quality of sampling (eg cut
channels, random chips, or specific
specialised industry standard
measurement tools appropriate to the
minerals under investigation, such as
down hole gamma sondes, or handheld
XRF instruments, etc). These examples
should not be taken as limiting the broad
meaning of sampling.
● Include reference to measures taken to
ensure sample representivity and the
appropriate calibration of any
measurement tools or systems used.
● Aspects of the determination of
mineralisation that are Material to the
Public Report. In cases where ‘industry
standard’ work has been done this would
be relatively simple (eg ‘reverse circulation
drilling was used to obtain 1m samples
from which 3kg was pulverised to produce
a 30g charge for fire assay’). In other
cases more explanation may be required,
such as where there is coarse gold that
has inherent sampling problems. Unusual
commodities or mineralisation types (eg
submarine nodules) may warrant
disclosure of detailed information.
●
●
●
●
Logging
●
●
●
Drill type (eg core, reverse circulation,
open-hole hammer, rotary air blast, auger,
Bangka, sonic, etc) and details (eg core
diameter, triple or standard tube, depth of
diamond tails, face- sampling bit or other
type, whether core is oriented and if so, by
what method, etc).
Method of recording and assessing core
and chip sample recoveries and results
assessed.
Measures taken to maximise sample
recovery and ensure representative nature
of the samples.
Whether a relationship exists between
sample recovery and grade and whether
sample bias may have occurred due to
preferential loss/gain of fine/coarse
material.
Whether core and chip samples have been
geologically and geotechnically logged to a
level of detail to support appropriate
Mineral Resource estimation, mining
studies and metallurgical studies.
Whether logging is qualitative or
quantitative in nature. Core (or costean,
channel, etc) photography.
The total length and percentage of the
relevant intersections logged.
COMMENTARY
●
●
●
●
●
●
●
●
●
FBM - Rock Chip samples are collected
from out crop, sub crop and mullock piles
in the field.
Spodumene observations were
determined by competent geologists and
examined with ultraviolet light for mineral
fluorescence and identification
Only geochemical assay results are
considered a definitive indication of grade
Corazon Rock and Soil Sampling –
A total of 636 soil samples were collected
Soil sampling was conducted on a
100mx40m grid
Results of the Corazon soil programme
were announced by Corazon Mining on
29th of March 2023
Results of the Corazon rock chips were
announced on the 17th of January 2023
●
N/A
●
N/A
●
Rock chips are lithologically logged by
Geologists in the field
Logging is qualitative, recording rock type
and mineral species.
●
Future Battery Minerals Ltd
info@futurebatteryminerals.com.au
Suite 10, 38 Colin St, West Perth WA 6005
+61 8 6383 7817
ABN 91 148 966 545
futurebatteryminerals.com.au
ASX: FBM
Follow Us
8
CRITERIA
Sub-sampling
techniques and
sample preparation
Quality of assay
data and laboratory
tests
Verification of
sampling and
assaying
Location of data
points
EXPLANATION
● If core, whether cut or sawn and whether
quarter, half or all core taken.
● If non-core, whether riffled, tube sampled,
rotary split, etc and whether sampled wet
or dry.
● For all sample types, the nature, quality
and appropriateness of the sample
preparation technique.
● Quality control procedures adopted for all
sub-sampling stages to maximise
representivity of samples.
● Measures taken to ensure that the
sampling is representative of the in-situ
material collected, including for instance
results for field duplicate/second-half
sampling.
● Whether sample sizes are appropriate to
the grain size of the material being
sampled.
● The nature, quality and appropriateness of
the assaying and laboratory procedures
used and whether the technique is
considered partial or total.
● For geophysical tools, spectrometers,
handheld XRF instruments, etc, the
parameters used in determining the
analysis including instrument make and
model, reading times, calibrations factors
applied and their derivation, etc.
● Nature of quality control procedures
adopted (eg standards, blanks, duplicates,
external laboratory checks) and whether
acceptable levels of accuracy (i.e. lack of
bias) and precision have been established.
● The verification of significant intersections
by either independent or alternative
company personnel.
● The use of twinned holes.
● Documentation of primary data, data entry
procedures, data verification, data storage
(physical and electronic) protocols.
● Discuss any adjustment to assay data.
●
●
●
Data spacing and
distribution
●
●
●
Accuracy and quality of surveys used to
locate drill holes (collar and down-hole
surveys), trenches, mine workings and
other locations used in Mineral Resource
estimation.
Specification of the grid system used.
Quality and adequacy of topographic
control.
Data spacing for reporting of Exploration
Results.
Whether the data spacing and distribution
is sufficient to establish the degree of
geological and grade continuity
appropriate for the Mineral Resource and
Ore Reserve estimation procedure(s) and
classifications applied.
Whether sample compositing has been
COMMENTARY
● N/A
●
●
●
●
Rock Chip samples for Lithium
Investigation have been fused with Na2O2
and digested in hydrochloric acid, the
solution is analysed by ICP by ALS
Minerals Laboratories ME-MS81 ICP-AES,
ME-MS91. The method is considered a
whole rock analysis.
A stoichiometric conversion of Li to Li2O is
applied consisting of a factor 2.153.
All primary paper data is held on site,
digitised data is held in a managed
database off site.
No adjustments to assays have occurred.
●
All location data and maps are
represented in UTM GDA94 Zone 51
●
N/A
Future Battery Minerals Ltd
info@futurebatteryminerals.com.au
Suite 10, 38 Colin St, West Perth WA 6005
+61 8 6383 7817
ABN 91 148 966 545
futurebatteryminerals.com.au
ASX: FBM
Follow Us
9
CRITERIA
Orientation of data
in relation to
geological structure
Sample security
Audits or reviews
EXPLANATION
applied.
● Whether the orientation of sampling
achieves unbiased sampling of possible
structures and the extent to which this is
known, considering the deposit type.
● If the relationship between the drilling
orientation and the orientation of key
mineralised structures is considered to
have introduced a sampling bias, this
should be assessed and reported if
material.
● The measures taken to ensure sample
security.
● The results of any audits or reviews of
sampling techniques and data.
Section 2: Reporting of Exploration Results
CRITERIA
Mineral tenement
and land tenure
status
Exploration done by
other parties
EXPLANATION
● Type, reference name/number, location
and ownership including agreements or
material issues with third parties such as
joint ventures, partnerships, overriding
royalties, native title interests, historical
sites, wilderness or national park and
environmental settings.
● The security of the tenure held at the time
of reporting along with any known
impediments to obtaining a licence to
operate in the area.
●
Acknowledgment and appraisal of
exploration by other parties.
COMMENTARY
●
N/A
●
N/A
●
No independent audit or review has been
undertaken.
COMMENTARY
● The Miriam Project consists of 5
prospecting leases.
● Granted leases are P15/6136,
P15/6137, P156138 andP15/6139.
P15/6135 remains in application
● Leases P15/6136-6139 are held by
Coolgardie Nickel Pty Ltd,now a 100%
subsidiary of Future Battery Minerals
Ltd. P15/6135 is held by Limelight
Industries Pty Ltd until time of grant
● A 2% NSR is held by Limelight
Industries Pty Ltd over all Miriam
tenure.
● The tenements are located in the
Kangaroo Hills Timber Reserve, an
approved Conservation Management
Plan provides conditional access to the
tenure and exploration work including
drilling
● The tenements are in good standing
and no known impediments exist.
● The Kangaroo Hill Lithium Project
consists of 8 prospecting leases.
● P15/5740, P15/5741, P15/5742,
P15/5743, P15/5749, P15/5750,
P15/5963, P15/5965, M15/1887 (in
application), P15/6681 (in application),
P15/6813 (in application)
● All KHLP leases are held by Eastern
Coolgardie Goldfields Pty Ltd (ECG), a
100% subsidiary of FBM
● No known royalties exist on the leases.
● There are no material issues with
regard to access.
● The tenement is in good standing and
no known impediments exist.
● Soil and Rock chip sampling have been
conducted by Corazon Mining, FBM
has reviewed the results and sample
procedures which are inline with current
industry standards
Future Battery Minerals Ltd
info@futurebatteryminerals.com.au
Suite 10, 38 Colin St, West Perth WA 6005
+61 8 6383 7817
ABN 91 148 966 545
futurebatteryminerals.com.au
ASX: FBM
Follow Us
10
CRITERIA
Geology
Drill hole Information
EXPLANATION
● Deposit type, geological setting and style
of mineralisation.
●
●
Data aggregation
methods
●
●
●
Relationship between
mineralisation widths
and intercept lengths
●
●
●
Diagrams
Balanced reporting
●
●
A summary of all information material to
the understanding of the exploration
results including a tabulation of the
following information for all Material drill
holes:
● easting and northing of the drill hole
collar
● elevation or RL (Reduced Level –
elevation above sea level in metres)
of the drill hole collar
● dip and azimuth of the hole
● down hole length and interception
depth
● hole length.
If the exclusion of this information is
justified on the basis that the information
is not Material and this exclusion does
not detract from the understanding of the
report, the Competent Person should
clearly explain why this is the case.
In reporting Exploration Results,
weighting averaging techniques,
maximum and/or minimum grade
truncations (eg cutting of high grades)
and cut-off grades are usually Material
and should be stated.
Where aggregate intercepts incorporate
short lengths of high-grade results and
longer lengths of low-grade results, the
procedure used for such aggregation
should be stated and some typical
examples of such aggregations should be
shown in detail.
The assumptions used for any reporting
of metal equivalent values should be
clearly stated.
These relationships are particularly
important in the reporting of Exploration
Results.
If the geometry of the mineralisation with
respect to the drill hole angle is known,
its nature should be reported.
If it is not known and only the down hole
lengths are reported, there should be a
clear statement to this effect (eg ‘down
hole length, true width not known’).
Appropriate maps and sections (with
scales) and tabulations of intercepts
should be included for any significant
discovery being reported These should
include, but not be limited to a plan view
of drill hole collar locations and
appropriate sectional views.
Where comprehensive reporting of all
Exploration Results is not practicable,
representative reporting of both low and
high grades and/or widths should be
COMMENTARY
● Miriam Lithium Project is regarded as a
Lithium Caesium Tantalum enriched
pegmatite which intrudes older Archaen
aged greenstone lithologies.
● N/A
●
N/A
●
N/A
●
Relevant diagrams have been included
within the announcement.
●
All results related to mineralisation at
Miriam have been previously reported
Future Battery Minerals Ltd
info@futurebatteryminerals.com.au
Suite 10, 38 Colin St, West Perth WA 6005
+61 8 6383 7817
ABN 91 148 966 545
futurebatteryminerals.com.au
ASX: FBM
Follow Us
11
CRITERIA
Other substantive
exploration data
EXPLANATION
practiced to avoid misleading reporting of
Exploration Results.
● Other exploration data, if meaningful and
material, should be reported including
(but not limited to): geological
observations; geophysical survey results;
geochemical survey results; bulk samples
– size and method of treatment;
metallurgical test results; bulk density,
groundwater, geotechnical and rock
characteristics; potential deleterious or
contaminating substances.
COMMENTARY
●
●
●
●
Further work
●
●
The nature and scale of planned further
work (eg tests for lateral extensions or
depth extensions or large-scale step-out
drilling).
Diagrams clearly highlighting the areas of
possible extensions, including the main
geological interpretations and future
drilling areas, provided this information is
not commercially sensitive.
●
●
●
Geophysical data from Londonderry
airborne magnetic survey flown in 1996
by UTS Geophysics for Gold Mines of
Coolgardie on 30m spaced east-west
lines at ground clearance of 22m.
Survey used magnetic base station for
magnetic diurnal removal, GPS for
location control and tie lines for
magnetic levelling.
Geophysical data from Bouchers
airborne magnetic and radiometric
survey flown in 2000 by TAG for
Spinifex Nickel Pty Ltd on 40m spaced
east-west lines at a ground clearance of
35m. Survey used magnetic base
station for magnetic diurnal removal,
GPS for location control and tie lines for
magnetic levelling, calibrated
spectrometer and standard windows for
radioelement ground concentrations.
Lithostructural interpretation of
geophysical data by Southern
Geoscience Consultants is qualitative
in nature and based primarily on
magnetic and radiometric survey data
with input from various other supporting
datasets including geological mapping
and soil sampling. The interpretation
has been performed at a scale of 1:10
000
Geophysical targets are qualitative in
nature and are generated based on the
following criteria: interpretation of
structural disruption from magnetic
survey data, muted local magnetic field
strength from magnetic survey data,
mapped pegmatite outcrop from
geological mapping, soil anomalism
from soil sampling, potassium
anomalism from radiometric survey
data
Future Battery is currently reviewing the
new targets with the aim of planning
drill hole locations. If it is determined
that drilling is required, the Company
will announce such plans in due course.
Further surface sampling is planned.
Additional geophysical survey will be
considered as part of future exploration
programs.
Future Battery Minerals Ltd
info@futurebatteryminerals.com.au
Suite 10, 38 Colin St, West Perth WA 6005
+61 8 6383 7817
ABN 91 148 966 545
futurebatteryminerals.com.au
ASX: FBM
Follow Us
12
Share your feedback
Discover