New Stacked Spodumene Bearing Pegmatites Confirmed at KHLP
Released
Released
Announcement PDF
24 August 2023
ASX ANNOUNCEMENT
MULTIPLE NEW STACKED SPODUMENE BEARING
PEGMATITES CONFIRMED AT KANGAROO HILLS
Highlights
•
Phase 3 reverse circulation (RC) and diamond drilling (DD) programmes at the Rocky Prospect have
identified multiple new stacked spodumene bearing pegmatites semi parallel to the Big Red
lithium pegmatite (Big Red).
•
The new intersections have seen a significant increase in the scale of the pegmatite swarm and
potential tonnage at Kangaroo Hills, which is now confirmed over a 1.2 x 1.5km area and remains
open in all directions.
•
~4,800m of RC drilling completed to date with assays pending for all drill core samples.
•
Due to the outstanding results, the Phase 3 RC drill programme has been expanded with a further
6,000m to be drilled at the Rocky and other priority neighbouring prospects, Wallaroo and Eastern
Grey.
•
Expanded drilling programme will aim to further delineate the Rocky pegmatites, testing strike
extensions for further thickening of the pegmatite as seen at the Big Red (29m @ 1.36% Li2O from
38m KHRC0111)
•
A 1,500m DD programme is also currently underway at both the Big Red and Rocky prospects.
•
Target generative geophysical surveys including Resistivity and ground gravity are to commence in
the coming fortnight, targeting Big Red North and regions currently awaiting drill permitting.
Future Battery Minerals Limited (ASX: FBM) (FBM or the Company) is pleased to announce outstanding
initial results from the Phase 3 drilling programme at the 100% owned Kangaroo Hills Lithium Project
(KHLP) in Western Australia (WA, which has discovered multiple new stacked spodumene bearing
pegmatites. These findings indicate a far greater lithium-bearing system at the Rocky and Big Red
Prospects than originally anticipated.
FBM Technical Director Robin Cox commented:
“The initial geological results of the Phase 3 drilling programme are a game changer for the scale and potential
tonnage of the Kangaroo Hills project. Our interpretation of the intercepted pegmatites at the Rocky Prospect
illustrate a stacked system with multiple spodumene bearing pegmatites now intercepted and which remains
open in all directions. Given these very encouraging visual results, the Company has moved quickly to expand
the current drilling programme with a further 6,000m of RC drilling being added. In addition, a diamond drill rig
was recently mobilised to site to further test the Rocky Prospect and to provide much needed structural data
of this promising system that remains open in all directions. Work to date at the KHLP has successfully
discovered shallow high grade spodumene bearing pegmatites at Big Red, which has now been identified as
a larger system with the addition of the successful Rocky drilling. The RC programme will further test the
exciting nearby regional prospects at Eastern Grey, Wallaroo and Pademelon which have all intercepted
pegmatites, highlighting the success of the Company’s target generative work to date.”
1
Refer to ASX announcement dated 20 March 2023 – LCT-PEGMATITE DISCOVERY CONFIRMED AT KANGAROO HILLS
Future Battery Minerals Ltd
info@futurebatteryminerals.com.au
Suite 10, 38 Colin St, West Perth WA 6005
+61 8 6383 7817
ABN 91 148 966 545
futurebatteryminerals.com.au
ASX: FBM
Follow Us
1
Figure 1: Rocky and Big Red LCT-Pegmatite Prospects Long Section
Note: results and grades are reported as metres over % grade Li2O2
Geological Results
The Phase 3 drilling programme initially planned for 5,000m of RC targeting the Big Red Prospect (Big Red)
and regional prospects Rocky, Eastern Grey, Wallaroo and Pademelon. Drilling at the Rocky Prospect aimed
to further test the outcropping pegmatites and the previous intercept of 5m @ 1.12% Li2O from 104m in
KHRC0037. Holes completed to date have intercepted multiple new pegmatites within close proximity
to Big Red, which have been interpreted as a larger stacked system and which remains open in all
directions. Multiple intercepts have visible spodumene within the pegmatites and are currently
awaiting assay results. Currently, the pegmatites show a semi-parallel structure to Big Red, which is
characterised by a gentle -20 degree northerly dip. The spodumene pegmatites intercepted exhibit a maximum
thickness of 10m (down hole width). However, there is strong potential to intercept thickened zones with similar
widths to Big Red (29m @ 1.36% Li2O from 38m KHRC0112) given the pinch and swell nature of the KHLP
pegmatites. Importantly, the pegmatites at Rocky remain open in all directions and the Rocky Prospect
has the potential to significantly add to the scale and tonnage of lithium mineralisation as exploration
drilling at KHLP continues.
Cautionary Statement – Visual estimates of spodumene should not be considered a proxy or substitute for
laboratory analysis, which are required to determine the widths and grade of mineralisation. Assays will be
received in the coming 6-8 weeks.
2
Refer to ASX announcement dated 18 July 2023 - FURTHER HIGH-GRADE LITHIUM RESULTS AT KANGAROO HILLS
Future Battery Minerals Ltd
info@futurebatteryminerals.com.au
Suite 10, 38 Colin St, West Perth WA 6005
+61 8 6383 7817
ABN 91 148 966 545
futurebatteryminerals.com.au
ASX: FBM
Follow Us
2
Drilling Programmes
These outstanding results have materially increased the potential scale of the KHLP. Consequently,
the Company is now expanding the current drill programme with an additional 6,000m of RC drilling.
This expansion aims to further test additional extensions at Big Red and Rocky, as well as assess the
regional prospects at Eastern Grey, Wallaroo and Pademelon. To date, drilling at Rocky has only tested
the western margin of the pegmatites on a wide spaced grid. The expanded programme will continue to test
the pegmatites towards the east and south directions, employing more closely spaced drilling technique that
are suitable for the completion of a Mineral Resource Estimation (MRE).
Additionally, a diamond core rig has recently been mobilised to site to provide core samples from the newly
intercepted pegmatites and to provide structural data to assess the geometry of the pegmatites. The DD
programme will consist of up to 1,500m and will supply additional core samples for metallurgical test work.
Figure 2: Plan view of the Rocky and Big Red Prospects and drilling locations
Discussion of Results
Given the proximity of Big Red and the previous discovery of mineralised pegmatites, the Rocky Prospect was
considered a high priority target. Drilling in the Phase 2 drill programme intercepted 5m @ 1.12% Li2O from
104m in drill hole KHRC037. The focus of the Phase 3 drill programme was to step out from this intercept on
a wide spaced 160m x 160m grid to evaluate the continuity of the pegmatite. Importantly, the wide spaced
drilling has now intercepted a number of pegmatite units with visible spodumene modelled as
continuous and semi parallel to the mineralised Big Red pegmatite. This demonstrates the potential of a
larger stacked system comprising both the Big Red and Rocky prospects. To date, drilling at Rocky has
been on a wide spaced scale, therefore the widths of the intercepted pegmatites are extremely
encouraging and the Geological team believes there is potential to intercept swell points within the
system with thicknesses similar to Big Red (29m @ 1.36% Li2O from 38m). Drilling is now to be undertaken
on a tighter grid spacing to test this potential.
Future Battery Minerals Ltd
info@futurebatteryminerals.com.au
Suite 10, 38 Colin St, West Perth WA 6005
+61 8 6383 7817
ABN 91 148 966 545
futurebatteryminerals.com.au
ASX: FBM
Follow Us
3
Selective diamond core drilling is now being utilised to better understand the geometry of the pegmatites at
Rocky and to collect metallurgical sample for the Company’s ongoing KHLP metallurgical test work.
To date, the Phase 3 drill programme has consisted of over 4,800m of RC and 500m of diamond core drilling.
Drilling at Big Red commenced with infilling drill lines where mineralised pegmatites were identified. These
multiple pegmatites with visible spodumene were intercepted in drill holes KHRC043-KHRC045 with
thicknesses up to 10m (downhole width).
Due to weather and access conditions, drilling then shifted to the Pademelon Prospect which aimed to test a
structural feature identified in the magnetic data north of the historic Londonderry mine, which hosts lithiumcaesium-tantaum (LCT) pegmatites and was historically mined for tantalum and beryl but was known to host
lithium mineralisation. Drilling successfully intercepted a continuous pegmatite across the east-west
fence line which ranged in thickness from 5-43m (downhole thickness). This shows a potential
continuation of the Londonderry pegmatite to the north. With assay results still pending, the discovery of
thick, continuous pegmatites at Pademelon is highly encouraging and the geochemistry will assist in
vectoring to further lithium mineralisation.
At Eastern Grey, five holes have been completed to date. Thin lenses of pegmatite have been intercepted, but
further drilling has been planned to the northwest as drilling to date has intercepted the contact between
greenstone lithologies and granite. Eastern Grey remains highly prospective with further drilling required
to evaluate the target.
Ground preparation work is currently underway to accommodate the expanded programme.
Figure 3: KHLP – Seismic Drilling Australia’s Diamond Rig at Rocky (August 2023)
Future Battery Minerals Ltd
info@futurebatteryminerals.com.au
Suite 10, 38 Colin St, West Perth WA 6005
+61 8 6383 7817
ABN 91 148 966 545
futurebatteryminerals.com.au
ASX: FBM
Follow Us
4
Target Generative Geophysics
As part of the on-going target generative exercise at KHLP, a close spaced resistivity survey is scheduled to
commence during the next two weeks. Resistivity has proven successful in identifying pegmatites at the KHLP,
with the Big Red pegmatite hosting a correlative resistivity anomaly with a northwest trending strike length of
over 1km. The geophysical survey is a quick, low cost effective, and non-ground disturbing method of testing
large areas of the KHLP tenure for shallow thick pegmatites. This approach facilitates more targeted drilling
with the potential of increasing the exploration success rate.
Ground gravity surveys have also been expanded at the KHLP. Data from the surveys completed to date is
currently being analysed to detect shallow pegmatites with no surface expression.
Figure 4: KHLP – Location Map of Prospects and Regional Targets
Future Battery Minerals Ltd
info@futurebatteryminerals.com.au
Suite 10, 38 Colin St, West Perth WA 6005
+61 8 6383 7817
ABN 91 148 966 545
futurebatteryminerals.com.au
ASX: FBM
Follow Us
5
FBM Planned Works and Updates
FBM planned works and update across the KHLP and Nevada Lithium Project (NLP) are as follows:
KHLP (100%)
•
Phase 3 RC drilling – underway ~4800m completed to date;
•
DD testing of the Big Red and Rocky Prospects – underway;
•
Metallurgical and mineralogical assessment – underway;
•
Target generative geophysics:
o Ground Gravity – completed, interpretation underway
o Expanded Resistivity Survey – to commence in late August;
•
Spring environmental surveys – to commence in October.
(NLP) (80%)
•
Phase 3 drill planning/permitting – Underway to commence in mid- September.
This announcement has been authorised for release by the Board of Directors of the Company.
-ENDFor further information visit www.futurebatteryminerals.com or contact:
Robin Cox
Mike Edwards
Executive Chairman
Technical Director
E: rcox@futurebatteryminerals.com
E: mike.edwards@futurebatteryminerals.com
Future Battery Minerals Ltd
info@futurebatteryminerals.com.au
Suite 10, 38 Colin St, West Perth WA 6005
+61 8 6383 7817
ABN 91 148 966 545
futurebatteryminerals.com.au
ASX: FBM
Follow Us
6
About Kangaroo Hills Lithium Project (KHLP) – 100%
The 100% owned KHLP is a recent and exciting hard rock Lithium discovery located in the Goldfields of
Western Australia (WA) only 17kms south of the township of Coolgardie. Spodumene mineralisation within
Lithium-Caesium-Tantalum (LCT) pegmatites was discovered during regional exploration drilling of the
Nepean Nickel Project in late 2022. Exploration efforts to date have significantly expanded on these initial
results, as the Company has now conducted two rounds of drilling totalling 47 holes and over 6,000m. To date,
drilling has identified the Big Red Prospect as an outcropping shallow north dipping pegmatite with peak
intercepts of 29m @ 1.36% Li2O from 38m with the economic lithium mineral spodumene noted as the
dominant mineral. Through the implementation of regional target generative work, which involved mapping,
geophysics and geochemistry, six additional high priority prospects have been identified. These high priority
prospects have the potential to host further LCT pegmatites (as highlighted in this announcement).
The location of the Project provides significant advantages to FBM. Located on the doorstep of a premier
mining district, the Goldfields of WA and specifically Kalgoorlie (50km East of KHLP) host a professional mining
and exploration workforce. This provides the Company with access to skilled labour and infrastructure critical
to the development of any future mining project. The WA Goldfields are also a Lithium endowed province of
Western Australia, with numerous operating and developing Lithium projects. Notably the KHLP is only 30kms
west of the Mt Marrion Lithium Mine operated by Mineral Resources Ltd (ASX: MRL). In addition, the site is
accessible via a sealed road leading south from Coolgardie, ensuring the Company has continuous access all
year-round.
Figure 3 – KHLP Location
Future Battery Minerals Ltd
info@futurebatteryminerals.com.au
Suite 10, 38 Colin St, West Perth WA 6005
+61 8 6383 7817
ABN 91 148 966 545
futurebatteryminerals.com.au
ASX: FBM
Follow Us
7
Competent Persons Statement
The information in this announcement that relates to exploration results is based on and fairly represents information
compiled by Mr Robin Cox BSc (E.Geol), a Competent Person, who is a Member of the Australian Institute of Mining and
Metallurgy. Mr Cox is the Company’s Chief Geologist and has sufficient experience that is relevant to the style of
mineralisation and type of deposit under consideration and to the activity being undertaken to qualify as a Competent
Person as defined in the 2012 Edition of the Australasian Code for Reporting of Exploration Results, Mineral Resources
and Ore Reserves. Mr Cox consents to the inclusion in this announcement of the matters based on his information in the
form and context in which it appears.
Forward-Looking Statements
This document may include forward-looking statements. Forward-looking statements include, but are not limited to,
statements concerning Future Battery Minerals Limited’s planned exploration program and other statements that are not
historical facts. When used in this document, the words such as "could," "plan," "estimate," "expect," "intend," "may”,
"potential", "should," and similar expressions are forward-looking statements. Although Future Battery Minerals Limited
believes that its expectations reflected in these forward-looking statements are reasonable, such statements involve risks
and uncertainties and no assurance can be given that actual results will be consistent with these forward-looking
statements.
Previously Reported Results
There is information in this announcement relating to exploration results which were previously announced on 20 March
2023 and 18 July 2023. Other than those disclosed in the announcement, the Company confirms that it is not aware of any
new information or data that materially affects the information included in the original market announcement.
Future Battery Minerals Ltd
info@futurebatteryminerals.com.au
Suite 10, 38 Colin St, West Perth WA 6005
+61 8 6383 7817
ABN 91 148 966 545
futurebatteryminerals.com.au
ASX: FBM
Follow Us
8
Table 1 – Drill Hole Collars
UTM – MGA94 Zone 51
Hole ID
EASTING
(m)
NORTHING
(m)
RL (m)
Azimuth
(degrees)
Dip
(degrees)
End of
hole
Depth (m)
Prospect ID
KHRC042
KHRC043
KHRC044
KHRC045
KHRC046
KHRC047
KHRC048
KHRC049
KHRC050
KHRC051
KHRC052
KHRC053
KHRC054
KHRC055
KHRC056
KHRC057
KHRC058
KHRC059
KHRC060
KHRC061
KHRC062
KHRC063
KHRC064
KHRC065
KHRC066
KHRC067
KHRC068
KHDD006
KHRC044D
KHDD007
KHDD008
317750
317790
317710
317390
318430
317150
316910
316670
316430
316032
318270
318350
318190
318310
317550
317710
317550
317390
317390
317550
317710
317790
317870
317810
317949
317870
317383
317906.9
317714
318026
317800
6558300
6558230
6558230
6558070
6557480
6556710
6556710
6556710
6556710
6556710
6557670
6557670
6557750
6557750
6558070
6558070
6557910
6557910
6557830
6557830
6557830
6557830
6557830
6557904
6557828
6557915
6557683
6558262
6558235
6558299
6558265
408
410
410
396
374
381
398
418
394
379
377
377
379
378
394
400
393
388
387
396
392
387
386
392
384
389
387
399
217
398
409
270
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
90
0
270
270
-60
-90
-90
-90
-90
-90
-90
-90
-90
-90
-90
-90
-90
-90
-90
-90
-90
-90
-90
-90
-90
-90
-90
-90
-90
-90
-90
-85
-90
-70
-85
150
186
198
204
150
198
204
198
210
204
204
173
182
144
186
156
198
176
223
156
150
150
150
150
168
150
174
72
228.8
70
In progress
Big Red
Big Red
Big Red
Rocky
Eastern Grey
Pademelon
Pademelon
Pademelon
Pademelon
Pademelon
Eastern Grey
Eastern Grey
Eastern Grey
Eastern Grey
Rocky
Rocky
Rocky
Rocky
Rocky
Rocky
Rocky
Rocky
Rocky
Rocky
Rocky
Rocky
Rocky
Big Red
Big Red
Big Red
Big Red
Future Battery Minerals Ltd
info@futurebatteryminerals.com.au
Suite 10, 38 Colin St, West Perth WA 6005
+61 8 6383 7817
ABN 91 148 966 545
futurebatteryminerals.com.au
ASX: FBM
Follow Us
9
Table 2 – Geological logging Pegmatite and Spodumene Percentage
Hole ID
Pegmatite
intercept from (m)
Pegmatite intercept
to (m)
Interval width
(m)
Visible spodumene
percentage
KHRC042
KHRC042
KHRC042
KHRC042
KHRC042
KHRC043
KHRC043
KHRC043
KHRC043
KHRC043
KHRC043
KHRC043
KHRC043
KHRC044
KHRC044
KHRC044
KHRC044
KHRC044
KHRC044
KHRC045
KHRC045
KHRC045
KHRC045
KHRC045
KHRC045
KHRC045
KHRC047
KHRC048
KHRC049
KHRC049
KHRC050
KHRC051
KHRC054
KHRC056
KHRC056
KHRC056
KHRC056
KHRC056
KHRC057
KHRC057
KHRC057
37
43
112
126
137
5
12
19
21
44
50
101
147
22
58
68
78
103
116
12
40
63
72
85
87
94
98
91
107
121
170
61
49
12
24
31
33
136
0
9
38
40
45
113
127
138
10
13
20
26
46
52
103
157
26
60
69
80
104
117
16
44
64
81
86
89
95
117
134
114
155
202
66
50
14
29
32
39
142
3
10
48
3
2
1
1
1
5
1
1
5
2
2
2
10
4
2
1
2
1
1
4
4
1
9
1
2
1
19
43
7
34
32
5
1
2
5
1
6
6
3
1
10
5%
5%
15%
15%
20%
5%
20%
Future Battery Minerals Ltd
info@futurebatteryminerals.com.au
Suite 10, 38 Colin St, West Perth WA 6005
+61 8 6383 7817
ABN 91 148 966 545
futurebatteryminerals.com.au
ASX: FBM
Follow Us
10
KHRC057
KHRC058
KHRC058
KHRC058
KHRC058
KHRC058
KHRC059
KHRC059
KHRC059
KHRC060
KHRC060
KHRC060
KHRC060
KHRC061
KHRC061
KHRC062
KHRC062
KHRC064
KHRC068
KHRC068
KHRC068
KHRC068
KHRC068
KHDD006
KHRC044D
KHDD007
66
0
6
15
67
70
2
10
36
22
29
74
88
2
46
5
67
26
7
14
35
44
49
21.75
207.29
46.78
67
1
8
19
68
71
6
12
40
26
33
76
90
4
53
6
72
27
11
23
36
45
57
45.1
217.32
49.64
1
1
2
4
1
1
4
2
4
4
4
2
2
2
7
1
5
1
4
9
1
1
8
23.35
10.03
2.86
Future Battery Minerals Ltd
info@futurebatteryminerals.com.au
Suite 10, 38 Colin St, West Perth WA 6005
+61 8 6383 7817
ABN 91 148 966 545
futurebatteryminerals.com.au
25%
20%
5%
ASX: FBM
Follow Us
11
JORC Code, 2012 Edition, Table 1 (Kangaroo Hills Lithium Project)
Section 1: Sampling Techniques and Data
CRITERIA
Sampling
techniques
EXPLANATION
COMMENTARY
●
Drilling
Future Battery Minerals Limited (FBM):
● Lithium-Caesium-Tantalum (LCT)
mineralisation at the Kangaroo Hills Lithium
Project (KHLP) has been sampled from the
following drilling techniques.
● Reverse circulation (RC) drilling creates
1m samples of pulverised chips,
approximately 3kg’s is collected in
individual calico bags
● Diamond core drilling (DD) reported is yet
to be sampled. Sampling will be conducted
on quarter core in order to preserve bulk
sample for metallurgical test work.
● Rock Chip samples are collected from out
crop, sub crop in the field.
●
●
Nature and quality of sampling (eg cut
channels, random chips, or specific
specialised industry standard
measurement tools appropriate to the
minerals under investigation, such as
down hole gamma sondes, or handheld
XRF instruments, etc). These examples
should not be taken as limiting the broad
meaning of sampling.
Include reference to measures taken to
ensure sample representivity and the
appropriate calibration of any
measurement tools or systems used.
Aspects of the determination of
mineralisation that are Material to the
Public Report. In cases where ‘industry
standard’ work has been done this would
be relatively simple (eg ‘reverse circulation
drilling was used to obtain 1m samples
from which 3kg was pulverised to produce
a 30g charge for fire assay’). In other
cases more explanation may be required,
such as where there is coarse gold that
has inherent sampling problems. Unusual
commodities or mineralisation types (eg
submarine nodules) may warrant
disclosure of detailed information.
Air Magnetic Survey
Contractor: UTS
Client: St Francis Mining Ltd
Year: 1996
Aircraft: Fletcher
Instrumentation: Cesium Vapour
Sample Interval: ~5m
Flight Line Spacing: 50 and 100m
Flight Line Direction: 068o-248o, 158o-338o,
090o-270o
Tie Line Spacing: 500m and 1000m
Mean Terrain Clearance: 25m
Navigation: Differential GPS
IP Parameters
Contractor: Vortex Geophysics
Receiver: 1-2x GDD 16 channel IP Receiver
Transmitter: Vortex VIP-30 transmitter system
rated at 1500V, 30A and 15KVA
Configuration: Dipole-Dipole
Line Spacing: 200m
Dipole spacing: 100m
Domain/Cycle: Time domain – 2 seconds or
0.125Hz
Drilling
techniques
Drill sample
recovery
●
●
●
●
Drill type (eg core, reverse circulation,
open-hole hammer, rotary air blast, auger,
Bangka, sonic, etc) and details (eg core
diameter, triple or standard tube, depth of
diamond tails, face- sampling bit or other
type, whether core is oriented and if so, by
what method, etc).
Method of recording and assessing core
and chip sample recoveries and results
assessed.
Measures taken to maximise sample
recovery and ensure representative nature
of the samples.
Whether a relationship exists between
sample recovery and grade and whether
FBM:
•
RC drilling was conducted on reported
results in this announcement
•
HQ Diamond Core drilling is reported in this
announcement.
FBM.
•
Sample recovery is noted in the field for
each individual sample. Sample is
collected via a cyclone and cone splitter
attached to the drill rig, which is
considered standard for RC sampling.
•
Diamond core recovery is recorded by
both the drilling contractors and
Future Battery Minerals Ltd
info@futurebatteryminerals.com.au
Suite 10, 38 Colin St, West Perth WA 6005
+61 8 6383 7817
ABN 91 148 966 545
futurebatteryminerals.com.au
ASX: FBM
Follow Us
12
CRITERIA
EXPLANATION
COMMENTARY
sample bias may have occurred due to
preferential loss/gain of fine/coarse
material.
Logging
●
●
●
Sub-sampling
techniques and
sample
preparation
●
●
●
●
●
●
Quality of assay
data and
laboratory tests
●
●
●
•
measured by FBM geologists
No relationship between sample recovery
and grade has been yet observed and no
sample bias is believed to have occurred.
Whether core and chip samples have
been geologically and geotechnically
logged to a level of detail to support
appropriate Mineral Resource estimation,
mining studies and metallurgical studies.
Whether logging is qualitative or
quantitative in nature. Core (or costean,
channel, etc) photography.
The total length and percentage of the
relevant intersections logged.
FBM:
•
Drill chips are lithologically logged by
Geologists in the field
•
Logging is qualitative, recording rock type
and mineral abundance
•
Logging of RC chips is conducted on a 1
metre sample size.
•
Core is logged lithologically by Geologists
in the field.
•
Natural changes in mineral abundance
are recorded
If core, whether cut or sawn and whether
quarter, half or all core taken.
If non-core, whether riffled, tube sampled,
rotary split, etc and whether sampled wet
or dry.
For all sample types, the nature, quality
and appropriateness of the sample
preparation technique.
Quality control procedures adopted for all
sub-sampling stages to maximise
representivity of samples.
Measures taken to ensure that the
sampling is representative of the in-situ
material collected, including for instance
results for field duplicate/second-half
sampling.
Whether sample sizes are appropriate to
the grain size of the material being
sampled.
The nature, quality and appropriateness of
the assaying and laboratory procedures
used and whether the technique is
considered partial or total.
For geophysical tools, spectrometers,
handheld XRF instruments, etc, the
parameters used in determining the
analysis including instrument make and
model, reading times, calibrations factors
applied and their derivation, etc.
Nature of quality control procedures
adopted (eg standards, blanks, duplicates,
external laboratory checks) and whether
acceptable levels of accuracy (i.e. lack of
bias) and precision have been established.
FBM:
● 1m RC percussion, sample is split via a
cyclone and cone splitter attached to the
drill rig to produce a bagged 3kg sample.
● Certified reference material and blank
material are inserted every 20 samples as
per company QA/QC procedure for both
DD & RC.
● Field duplicates collected from the
Cyclone and cone splitter are inserted
every 60 samples
● Sample weights per metre range between
1-3kg.
● Diamond core sampling will consist of cut
core with quarter core utilised for
geochemical assay.
FBM:
● ALS Minerals, multi element analysis
method ME-ICP61 utilised for all samples,
consisting of multi acid digestion with HF and
ICP-AES analysis. Over limit method NiOG62H for ore grade Ni consisting of four
acid digestion with ICP-AES analysis. PGMICP23 fire assay ICP-AES finish method
used selectively for samples considered to
contain Pt, Pd & Au. All methods are
considered suitable for the style of
mineralisation targeted.
● Certified Reference Material (CRM’s)and
quartz blank (Blanks) samples are inserted
1:20 for DD & RC and 1:30 for AC as part
of Future Battery’s QA/QC procedure.
Accuracy and performance of CRM’s and
Blanks are considered after results are
received.
● Field duplicates collected from the
Cyclone and cone splitter are inserted
Future Battery Minerals Ltd
info@futurebatteryminerals.com.au
Suite 10, 38 Colin St, West Perth WA 6005
+61 8 6383 7817
ABN 91 148 966 545
futurebatteryminerals.com.au
ASX: FBM
Follow Us
13
CRITERIA
EXPLANATION
COMMENTARY
●
●
every 60 samples
Rock Chip samples and RC pulps for
Lithium Investigation have been fused with
Na2O2 and digested in hydrochloric acid,
the solution is analysed by ICP by Nagrom
Mineral Processors ICP004&ICP005 &
ALS Minerals Laboratories ME-MS81 ICPAES, ME-MS91. The method is
considered a whole rock analysis.
A stoichiometric conversion of Li to Li2O is
applied consisting of a factor 2.153.
X-Ray Difraction
● Semi Quantitative X-Ray Difraction was
caried out on rock chip samples by ALS
Laboratories.
● The analysis provides both a qualitative
assessment of the mineralogy and a
quantitative result.
Raman Spectrometer
•
Bruker Raman Spectrometer was utilised
on all pegmatite RC chip samples from
with returned laboratory assays.
•
Raman spectroscopy is a spectroscopic
tool that enables rapid raw material
identification. With the aid of custom-built
reference libraries, it can be used to verify
or identify unknown materials in a matter
of minutes. It is a non-destructive
technique that requires limited to no
sample preparation in order to perform
analysis.
•
Qualitative mineralogical identification
•
Laser excitation wavelength 700-100nm
Verification of
sampling and
assaying
●
●
●
●
Location of data
points
●
●
●
Data spacing and
distribution
●
●
The verification of significant intersections
by either independent or alternative
company personnel.
The use of twinned holes.
Documentation of primary data, data entry
procedures, data verification, data storage
(physical and electronic) protocols.
Discuss any adjustment to assay data.
FBM:
•
No third-party verification has been
completed to date
•
Drill holes have not been twinned
•
All primary paper data is held on site,
digitised data is held in a managed
database off site.
•
No adjustments to assays have occurred.
Accuracy and quality of surveys used to
locate drill holes (collar and down-hole
surveys), trenches, mine workings and
other locations used in Mineral Resource
estimation.
Specification of the grid system used.
Quality and adequacy of topographic
control.
FBM:
•
Drill collars were surveyed in GDA94/MGA
Zone 51 datum by handheld GPS +-5m
accuracy
•
At completion of programme drill collars will
be surveyed using a Differential GPS +0.1m accuracy.
•
Rock Chip samples are recoded with
handheld GPS.
Data spacing for reporting of Exploration
Results.
Whether the data spacing and distribution
FBM:
•
Drill data spacing is sufficient to establish
the degree of geological and grade
Future Battery Minerals Ltd
info@futurebatteryminerals.com.au
Suite 10, 38 Colin St, West Perth WA 6005
+61 8 6383 7817
ABN 91 148 966 545
futurebatteryminerals.com.au
ASX: FBM
Follow Us
14
CRITERIA
EXPLANATION
●
Orientation of
data in relation to
geological
structure
Sample security
Audits or reviews
COMMENTARY
is sufficient to establish the degree of
geological and grade continuity
appropriate for the Mineral Resource and
Ore Reserve estimation procedure(s) and
classifications applied.
Whether sample compositing has
Share your feedback
Discover