Kangaroo Hills Lithium DSO Study Presentation
Released
Released
Announcement PDF
August 2026
DSO Study Fast-Tracks Kangaroo Hills
Lithium Cash Flow
A LOW COST, RAPID-
DEPLOYMENT LITHIUM
DEVELOPMENT OPPORTUNITY
ORERESOURCES.COM.AU
2
Forward Looking Statements
This presentation contains a series of forward-looking statements. Forward-looking statements include, but are not limited to, statements concerning Ore’s planned exploration and development activities and other
statements that are not historical facts. When used in this document, the words such as “could,” “plan,” “estimate,” “expect,” “intend,” “may”, “potential”, “should,” and similar expressions are forward-looking statements.
Although Ore believes that its expectations reflected in these forward-looking statements are reasonable, such statements involve risks and uncertainties, and no assurance can be given that actual results will be
consistent with these forward-looking statements.
Ore has concluded that it has a reasonable basis for providing these forward-looking statements and the forecast financial information included in this presentation. This includes a reasonable basis to expect that it will be
able to fund the development of the Kangaroo Hills Lithium Project upon successful delivery of the requisite development milestones, when required. The reasons for these conclusions are outlined throughout this ASX
release. While Ore considers all of the material assumptions to be based on reasonable grounds, there is no certainty that the Company will be able to successfully finance, construct or operate the Project. There is no
certainty that the Company will be able to convert Mineral Resources to Ore Reserves, secure all necessary approvals, obtain required financing, establish commercial offtake arrangements or achieve the operational
performance assumed in the Study.
Competent Persons Statement
The exploration targets or conceptual exploration targets in this presentation or expressed during the course of this presentation are subject to completion of the necessary feasibility studies, permitting and execution of
all necessary infrastructure agreements. In relation to any statements pertaining to future exploration targets or conceptual exploration targets, the nature of the exploration target means that the potential quantity and
grade is conceptual in nature. This presentation and information, opinions or conclusions expressed in the course of this presentation should be read in conjunction with Ore’s other periodic and continuous disclosure
announcements lodged with the ASX, which will be available on the Future Battery Minerals website.
The information in this report that relates to Exploration Results is based on information compiled by Mr Robin Cox and represents an accurate representation of the available data. Mr Cox (Member of the Australian
Institute of Mining and Metallurgy) is the Company’s Chief Geologist and has sufficient experience that is relevant to the style of mineralisation and type of deposit under consideration and to the activity being undertaken
to qualify as a Competent Person as defined in the JORC Code 2012. Mr Cox consents to the disclosure of this information in this report in the form and context in which it appears.
The information in this report that relates to Mineral Resources is based on and fairly represents information and supporting documentation compiled by Mr Robin Cox (the Company’s Technical Director) and Mr Lauritz
Barnes, (Consultant with Trepanier). Mr Barnes is a independent consultant. Mr Cox is a Member of the Australian Institute of Mining and Metallurgy and Mr Barnes is a member of both the Australasian Institute of Mining
and Metallurgy and the Australasian Institute of Geoscientists. Both Mr Cox and Mr Barnes have sufficient experience of relevance to the styles of mineralisation and types of deposits under consideration, and to the
activities undertaken to qualify as Competent Persons as defined in the 2012 Edition of the Joint Ore Reserves Committee (JORC) Australasian Code for Reporting of Exploration Results, Mineral Resources and Ore
Reserves. Specifically, Mr Cox is the Competent Person for the database (including all drilling information), for the site visits plus the geological and mineralisation models. Mr Barnes is the Competent Person for the
geological and mineralisation models, construction of the 3-D model plus the estimation. Mr Cox and Mr Barnes approve the inclusion in this report of the matters based on information in the form and context in which they
appear.
The information in this report that relates to Mine design and Mine Schedule is based on and fairly represents information and supporting documentation compiled by Mr Paul O’Callaghan, (Consultant with On the Crest
Mine Planning). Mr O’Callaghan is an independent consultant. Mr O’Callaghan is a member of the Australasian Institute of Mining and Metallurgy. Mr O’Callaghan has sufficient experience of relevance to the styles of
mineralisation and types of deposits under consideration, and to the activities undertaken to qualify as Competent Persons as defined in the 2012 Edition of the Joint Ore Reserves Committee (JORC) Australasian Code for
Reporting of Exploration Results, Mineral Resources and Ore Reserves. Mr O’Callaghan approves the inclusion in this report of the matters based on information in the form and context in which they appear.
ASX Listing Rule Information
The Company confirms that it is not aware of any new information or data that materially affects the information included in the original market announcements and, in the case of estimates of Mineral Resources, that all
material assumptions and technical parameters underpinning the estimates in the original market announcements continue to apply and have not materially changed. The Company confirms that the form and context in
which the competent persons findings have not been materially modified from the original announcement.
IMPORTANT NOTICES
ORERESOURCES.COM.AU
3
We acknowledge the Traditional Custodians
of the land on which we operate and pay our respects
to their Elders past and present
ACKNOWLEDGEMENT OF COUNTRY
ORERESOURCES.COM.AU
ORE RESOURCES
4
SHARE PRICE PERFORMANCE (12 MONTHS)
Strongly positioned for near-term value growth
CAPITAL STRUCTURE
Market listings ASX: OR3
Share Price (A$ps, as at 26 August 2026) 0.091
Shares Outstanding 827.5 M
Options and Performance Rights 121.0 M
Market Capitalisation A$75.3 M
Cash Balance (as at 30 June 2026) A$6.8 M
$0.00
$0.02
$0.04
$0.06
$0.08
$0.10
$0.12
Aug-25 Oct-25 Dec-25 Feb-26 Apr-26 Jun-26 Aug-26
ORERESOURCES.COM.AU
5
Proven value generators delivering on strategy
As Managing Director of Musgrave Minerals (ASX: MGV),
Rob led the business from a A$20M IPO through to its
successful A$201 million acquisition by Ramelius Resources
(ASX:RMS) in 2023.
ROB WAUGH
Non-Executive Director
NICK RATHJEN
Managing Director & CEO
Nick played an instrumental role in the commercialisation of
the Arcadia Lithium Project as Head of Corporate
Development at Prospect Resources (ASX: PSC), with the
asset being transacted to Huayou Cobalt in 2022 for
US$378M cash.
NEV POWER
Non-Executive Chairman
Under Nev’s leadership of Fortescue Metals Group
(ASX:FMG), its production quadrupled to over 170 Mtpa,
and it was the lowest-cost supplier of seaborne iron ore to
China.
ROBIN COX
Technical Director
Robin has 15 yrs experience in Australian and international
multi commodity minerals exploration and development. He
led Ore's discoveries and was previously part of exploration
teams at De Grey Mining, Mineral Resources and Toro
Energy.
A proven track record of exploration success, project stewardship, development expertise, and
operational excellence, consistently driving and realising substantial shareholder value
Strong Board and management ownership: excellent
shareholder alignment
Extensive industry networks and project opportunity
generation pipelines
PROVEN VALUE GENERATORS
ORERESOURCES.COM.AU
3.1 Mt at 1.01% Li2O Initial MRE
2.4 Mt economic pitshell
Stage 1 development 1.25 Mt at 750ktpa
Simple mining, crushing and trucking of
Direct Shipped Ore (DSO)
NPV8 $220.8M, Capex $24.9M, 4-month
payback & $237.5M net cash flow
Direct access to sealed highways
connecting to Esperance and rail
6
KANGAROO HILLS LITHIUM PROJECT
One of the most advanced lithium
development opportunities in Australia
ORERESOURCES.COM.AU
Completed by leading engineering and technical consultant,
Sedgman Pty Ltd, with an estimation accuracy of ±35%
Contractor-led DSO model minimises capital expenditure,
reduces execution risk and accelerates production
Mine schedule comprised of 100% Indicated Resources
Low development risk with flexibility to align operations with
prevailing market conditions
Established power, haulage, workforce and nearby
processing infrastructure
Significant exploration and resource growth potential
through further drilling
Project Agreement with the Traditional Owners
7
STUDY BASIS
A compelling assessment of development potential
ORERESOURCES.COM.AU
8
KEY PHYSICAL PARAMETERS
A simple open-pit mining and crushing lithium DSO operation
16 months
Initial mine life
750ktpa
Plant throughput
1.26Mt
Plant feed
7.9
LOM strip ratio
1.07%
Average Li2O grade
1.19Mt
Total DSO production
Key Physical Parameters Unit Value
Total material mined Mt 11.1
Plant throughput ktpa 750
Mine life months 16
Plant feed Mt 1.26
Total waste mined Mt 9.9
Strip ratio
waste:
ore
7.9
Plant recovery % 95
Average grade (Li2O) % 1.07
Total DSO production Mt 1.19
ORERESOURCES.COM.AU
9
KEY FINANCIALS
Unit Value
Financials
Gross revenue A$M 513.4
Mining costs A$M 54.0
Crushing (Processing) A$M 21.9
Haulage costs A$M 74.1
Storage and ship loading costs A$M 16.6
Shipping costs A$M 42.1
Royalties A$M 42.4
Operating cashflow (pre-tax) A$M 262.4
Capital cost A$M 24.9
Net cashflow (pre-tax) A$M 237.5
Value metrics
NPV8% (pre-tax) A$M 220.8
IRR (pre-tax) % 4,995
Payback period (pre-tax) Months 4
A$220.8M
Pre-tax, real NPV8%
A$237.5M
Net cash flows (pre-tax)
4 months
Payback period (pre-tax)
A$513.4M
Total revenue
Compelling economics for a scalable DSO operation
Early cash flow supports potential future
development of spodumene concentrate operation
Forecast DSO price of A$430/t CIF China, applying
DSO price linkage of 1.25% of Lithium Carbonate1 and
0.71 A$/US$
A highly robust, scalable lithium development opportunity with strong projected returns
1 Benchmark battery-grade lithium carbonate price of US$24,500/t adopted from Fastmarkets short term price forecast
ORERESOURCES.COM.AU
SITE LAYOUT & PIT DESIGN
Main pit design optimised for rapid cashflow
Measures ~410m in length and +200m in width, with a maximum
depth of 100m
Smaller adjacent satellite pit excavation (Rocky pit), to a depth of
~20m
Ore to be open pit mined from the Big Red and Rocky
pegmatites by a contract mining fleet
Mined ore to be hauled to a ROM stockpile and processed
through a contractor-operated crushing facility
Proposed crushing facility comprises a standalone modular
operation located adjacent to the ROM stockpile
Mine design based on an optimised pit shell (revenue factor of
0.54), reflecting a lower-risk and rapid-to-market development
strategy
Supporting a simple, low-cost mining operation
10
ORERESOURCES.COM.AU
11
TRANSPORT AND EXPORT
LOGISTICS
Low-capital logistics solution using contractor-
operated road trains to the Port of Esperance
Access to an established export pathway via ~300 km
of sealed highways
No dedicated rail or material handling infrastructure
required, minimising upfront capital requirements
Scalable and flexible transport solution easily
matched to production and shipping demand
Plan to utilise existing covered storage and export
infrastructure through target commercial arrangements
with Southern Ports and third-party providers
ORERESOURCES.COM.AU
12
12
Advancing discussions with potential
strategic and commercial partners for offtake
arrangements and project funding solutions
Ore sorting, metallurgical and geotechnical
optimisation test work
Exploration at Kangaroo Hills and Miriam focused
on resource growth and new discoveries
Progressing ML applications to grant and
requisite environmental approvals
NEXT PHASE ACTIVITIES AND EXECUTION SCHEDULE
Positioning Kangaroo Hills for development
Final Investment Decision (FID) targeted for mid-2027,
subject to approvals and funding
ORERESOURCES.COM.AU
KEY UPSIDE OPPORTUNITIES
Further potential value to be unlocked
1. Excluded Economic Material and Further MRE Conversion
>1.0 Mt of excluded Indicated DSO material provides clear life extension potential
Further resource conversion and pit optimisation offers future production growth opportunities
2. Further Exploration and Resource Growth
Strong exploration upside at Kangaroo Hills (Big Red/Rocky/ Potoroo pegmatites open along strike and at depth)
New discovery potential to be tested at Miriam
Further drill testing of regional targets across the Coolgardie Lithium Projects
3. Ore Sorting and Metallurgical Optimisation
Ore sorting and metallurgical optimisation programs targeting improved product quality and project economics
4. Domestic Ore Sales
Potential domestic sales pathway could materially reduce transport costs and enhance realized margin
5. Tantalum By-Products
Assessment of tantalum by-product recovery provides additional revenue upside
1
3
2
4
5
13
ORERESOURCES.COM.AU
14
LARGER OPEN PIT AND RESOURCE GROWTH
Additional in-pit mineral inventory
In favour of a low-strip low-opex development, +1.0 Mt of
DSO material (Indicated) within the economic pit shell was
excluded from the Study production schedule
Sustained elevated prices would likely see this material mined
and sold to significantly extend initial life
Current MRE also extends well beyond the economic pit
shell
Sustained lithium prices could unlock further DSO tonnes
currently outside the economic pit shell
Accelerating exploration across Coolgardie Lithium Projects
to drive resource growth and new discoveries
Kangaroo Hills and Miriam remain relatively underexplored
and highly prospective for lithium
Big Red/Rocky and Potoroo pegmatites remain open along
strike and at depth
ORERESOURCES.COM.AU
15
15
NEXT STEPS
Positioning Kangaroo Hills for rapid advancement into production
Final Investment Decision (FID) and first DSO production targeted for mid-2027,
subject to approvals and funding
Advancing discussions with potential strategic and commercial partners in relation to offtake
arrangements and non-dilutive prepayment funding solutions
Ore sorting, metallurgical and geotechnical test work, utilising core samples procured from
recent diamond drilling
Exploration drilling at Kangaroo Hills and Miriam focused on resource growth and new discoveries
Mining Licence and environmental approval processes advancing
ORERESOURCES.COM.AU
16
16
THE KANGAROO HILLS DSO OPPORTUNITY
Experienced Board and executive team with strong ownership alignment and a proven track record of
value creation
All key approvals targeted by Q2 2027, supporting a fully permitted development pathway
Further drilling targeting new discoveries and resource growth across the Coolgardie Lithium Projects
Minimal capital requirements and reduced development risk under a contractor-led operating model
Scoping Study outlines a low-capital, speed-to-market development at Kangaroo Hills centered around
a simple mining, crushing and Direct Shipped Ore (DSO) export strategy
Final Investment Decision (FID) and first DSO production targeted for mid-2027, subject to
approvals and funding
Rapid cash flow generation, reduced development risk and greater project development flexibility
ORERESOURCES.COM.AU
Suite 10, 38 Colin Street, West Perth WA 6005
T +61 8 6383 7817 F +61 8 6245 9853
Nicholas Rathjen
CEO and Managing Director
E nrathjen@oreresources.com.au
M +61 405 730 041
Robin Cox
Technical Director
E rcox@oreresources.com.au
M +61 432 516 276
Contact
ORERESOURCES.COM.AU
Supplementary
Information
ORERESOURCES.COM.AU
19
KEY ASSUMPTIONS
Robust set of commercial inputs
-
15,000
30,000
45,000
60,000
75,000
90,000
Jul-20
Nov-20
Mar-21
Jul-21
Nov-21
Mar-22
Jul-22
Nov-22
Mar-23
Jul-23
Nov-23
Mar-24
Jul-24
Nov-24
Mar-25
Jul-25
Nov-25
Mar-26
Jul-26
US$/tonne
Lithium Carbonate (99.5% Li2CO3)
Benchmark battery-grade lithium carbonate price of
US$24,500/t adopted
Forecast DSO price of A$430/t CIF China over the
mine life, applying a DSO price linkage of 1.25% and
an A$/US$ exchange rate of 0.71
Contractor-led development model utilising contract
supplied pricing for operating cost assumptions
Pricing assumptions strongly supported by current
market analysis
Incorporates prevailing industry pricing practices
utilised by established research providers
ORERESOURCES.COM.AU
20
20
MINERAL RESOURCE
Category
Tonnes
(Mt)
Grade Contained Metal
Li2O %
Ta2O5
ppm
Fe2O3 % Li2O (t) Ta2O5 (lb)
Indicated 2.71 1.05 118 1.2 28,400 708,700
Inferred 0.38 0.74 113 1.6 2,800 95,500
Total 3.10 1.01 118 1.23 31,200 804,200
Category
Tonnes
(Mt)
Grade Contained Metal
Li2O %
Ta2O5
ppm
Fe2O3 % Li2O (t) Ta2O5 (lb)
Transition 0.49 0.97 100 1.40 4,800 108,800
Fresh 2.60 1.02 121 1.20 26,400 695,400
Total 3.10 1.01 118 1.23 31,200 804,200
MRE based on extensive drill database comprising
261 drill holes for 38,229m
~90% of Mineral Resource in Indicated category
RPEEE constrained at DSO price assumption of
A$650/t
Average tantalum grade of 118 ppm Ta₂O₅,
comparable to Ta grades at neighbouring lithium
operations
Potential Ta by-product recovery opportunity,
subject to further metallurgical test work and
economic assessment
Significant resources growth potential via
regional exploration.
Kangaroo Hills Mineral Resource Estimate (July 2026)
Kangaroo Hills Mineral Resource Estimate (July 2026) by Oxidation Domain
For full details of the Kangaroo Hills Mineral Resource, refer to OR3 ASX release dated 26 August 2026. The Company confirms
that it is not aware of any new information or data that materially affects the information included in that release. All material
assumptions and technical parameters underpinning the estimates in that release continue to apply and have not materially
changed.
Initial Mineral Resource (MR) declared at Kangaroo Hills
ORERESOURCES.COM.AU
21
OPERATING COSTS
Operating Cost Item Units Value
Mining and Processing
Surface Mining A$/t rock 4.8
Crushing (Processing) A$/t ROM 17.4
Selling and Royalties
Haulage A$/t DSO 62.1
Storage and Ship Loading A$/t DSO 13.9
Shipping A$/t DSO 35.3
Royalties A$/t DSO 35.5
Total Operating Costs A$/t DSO 210.3
Item LOM (A$M)
Mining 54.0
Crushing (Processing) 21.9
Haulage 74.1
Storage and Ship Loading 16.6
Shipping 42.1
Royalties 42.4
Total 251.1
Single mining contractor assumed to undertake
all mining, crushing and haulage activities.
DSO product sold on a CIF basis, with Ore
responsible for freight and delivery costs
G&A costs incorporated within crushing and
processing cost assumptions
Process optimisation works underway, including
ore sorting, to drive potential additional
pricing and cost efficiencies
Optimised pit design drives low delivered DSO cost of approx. A$210/t
ORERESOURCES.COM.AU
MINE SCHEDULE
0.0%
0.2%
0.4%
0.6%
0.8%
1.0%
1.2%
30
60
90
120
150
180
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16
Li
2
O
grade
(%)
DSO
Produced
(kt)
Months
Big Red Rocky Li2O (%)
10
20
30
40
50
200
400
600
800
1,000
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16
Strip
Ratio
Total
Material
Mined
(kt)
Months
Ore Waste Strip Ratio
16-month initial mine life based solely on
Indicated Resources
Conservative low-strip, low-opex mine plan
focused on early cash generation
Over 1.0 Mt of DSO material excluded from the
base case (but sitting within the economic pit
shell), preserving future upside
Potential mine life extension and production
growth in a sustained strong lithium price
environment
High-confidence, scalable operating life
22
ORERESOURCES.COM.AU
23
SIMPLE PROCESSING SETUP
750 ktpa contractor-supplied crushing
solution designed for lithium pegmatite ore
Modular electric circuit producing 40 mm P80
DSO product
Simple, robust two-stage crushing and
screening flowsheet
Primary crusher sized above required
throughput, providing operational flexibility
and reducing production bottleneck risk
Fully maintained contractor owned and
operated crushing, power, and support infra.
Accelerates project start-up while
minimizing owner-funded capex
Rapid mobilisation and project commissioning
ORERESOURCES.COM.AU
24
Capital Cost Item A$M
Direct costs and allowances 1.2
Indirect costs 19.5
Contingency 4.1
Total 24.9
-25
0
25
50
75
100
125
-50
0
50
100
150
200
250
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16
A$M
A$M
months
CAPITAL COST
Contractor-led strategy delivers low
upfront capital cost requirements
(~A$25M)
Largest capital component is waste
pre-stripping (comprising
approximately A$17.2 million)
Forecast payback within 4 months
of project commencement
Super low upfront capital cost delivers rapid path to free cash flow
Net Pre-Tax Cashflows (Bars) and Cumulative Pre-Tax Net Cashflow (Line)
ORERESOURCES.COM.AU
25
DSO Price (Inverse)
DSO Selling Costs
Mining Dilution
Mining Costs
Capital Costs
Processing + G&A Costs
Base NPV (A$220.8M)
313.7
128.0
189.1 252.5
212.4 229.0
212.7 228.9
215.9 225.8
216.9 224.8
SENSITIVITY ANALYSIS (+/- 20%)
ORERESOURCES.COM.AU
26
PERMITTING AND APPROVALS
Legislation Approval
Environmental Protection Act (1986)
(WA) (EP Act)
Native Vegetation Clearing Permit
Works Approval/License
Mining Act (1978) (WA)
Mine Closure and Development
Plan
Rights in Water and Irrigation Act
(1914) (WA)
26D licence to construct water
bores
5C licence to abstract water
Project Agreement signed with the Marlinyu Ghoorlie
People in February 2026, supporting future development
and Mining Licence (ML) grants
Approvals progressing, with ML grant expected late-2026
Clear State and Federal permitting pathway, with EPA
referral considered unlikely under current plans
Environmental baseline studies in progress to support
final approvals, including flora, fauna, hydrology,
hydrogeology and waste rock characterisation
No material environmental constraints identified within
the proposed mining and infrastructure footprint
Pit design remains above groundwater table, minimising
dewatering requirements and environmental impacts
All requisite approvals targeted by Q2 2027,
supporting fully permitted development
execution in mid-2027
Clear permitting pathway with strong stakeholder support
ORERESOURCES.COM.AU
27
KEY RISKS
Appropriate planning to mitigate key development and operating risks
Area Risk Description Potential Impact Proposed Mitigation
Geological Conditions Orebody continuity, grade distribution,
stripping ratio and geotechnical
conditionsremain subject to further
investigation.
Increased miningcosts and
schedule impacts.
Undertake geotechnical investigations, grade
control drilling and detailed mine planning
before project execution.
Lithium Market Project economicsare sensitive to lithium
pricing and future market demand for DSO
lithium products.
Reduced revenue and project
viability.
Maintain development
flexibility, monitor market conditions, and
align production commencement with
favourable market cycles.
Offtake Ability to secure long-term customers for
crushed lithium pegmatite DSO product
has not yet been confirmed.
Production limitationsor delayed
project development.
Engage potential customers early, undertake
product marketing campaigns, provide bulk
samples, and secure preliminaryofftake
agreements prior to final investment
decisions.
MiningCosts Miningcosts are based on preliminary
assumptions and contractor inputs.
Higher operating costs than
estimated.
Obtain competitive tenders from multiple
miningcontractors and update estimates.
CrushingPerformance Crushingthroughput and availability
assumptions have not
been validated under operating
conditions.
Reduced production rates and
increased operating costs.
Conduct ore characterisation
testing, validate contractor assumptions, and
include performanceguarantees within
contractor agreements.
Haulage Costs Haulage to Esperance is a major operating
cost and remains sensitive to fuel pricing,
contractor rates and transport
regulations.
Significant impact on project
margins.
Obtain firm haulage pricing, investigate
alternative fleet configurations, and consider
fuel escalation provisionsduring contract
negotiations.
Road Transport Reliance on long-distance road haulage
between site and Esperance.
Supply chain disruptions and
reduced product delivery
reliability.
Develop haulage contingency
plans, maintain product stockpile buffers,
and engage experienced transport providers
with sufficient fleet availability.
Port Access Ongoingaccess to bulk storage and ship-
loading capacity at Esperance
Port remains subject to third-party
availability.
Export delays and
increased logistics costs.
Engage port service providers early, secure
indicative capacity allocations, and
investigate alternative storage arrangements
if required.
Water Supply Proposed borefield capacity, water quality
and approval
requirements remain unconfirmed.
Additional capital expenditure or
project delays.
Undertake hydrogeologicalinvestigations and
test bores early in project development.
Environmental & permitting Mining, environmental, heritage and
haulage approvals are yet to be
completed.
Delays to project execution and
increased costs.
Commenceenvironmental, heritage and
stakeholder studies early
and maintain regular engagement with
regulators and TraditionalOwners.
Site Layout Constraints Infrastructure must remain outside the
500 m pit exclusion zone and allow for
future pit expansion.
Potential redesign and relocation
costs.
Regularly review infrastructure locations
against updated pit designs and preserve
expansioncorridorsduring layout
development.
Capital Cost Accuracy Capital estimate is based on an AACE
Class 5 study with an accuracy range
of approximately ±35%.
Potential capital cost escalation. Advance engineeringdefinition, strengthen
vendor engagement and update estimates.
Contractor Dependency Project execution relies heavily on
mining, crushing and haulage
contractors.
Reduced control over
costs, schedule and
performance.
Establish clear contractor KPIs, performance
guarantees and interface management
processes between contractors.
Opportunity Area Opportunity Description Potential Benefit Recommended Actions
Early Revenue DSO development provides a low-capital
pathway to generate revenue prior to
development of a full concentrator
project.
Accelerated cash flow and
reduced funding
requirements.
Fast-track permitting and contractor engagement
to minimisetime to first shipment.
Resource Growth Big Red remains open along strike and
down dip, with significant exploration
upside at Miriam.
Increased mine life and project
value.
Continueexplorationdrilling and resource
expansionprograms.
Contractor Model Outsourcing mining, crushing and haulage
minimisesowner capital expenditure.
Lower upfront investment and
reduced execution risk.
Continueto maximise contractor
scope where commercially attractive.
Existing Infrastructure Utilisation of existing road corridors to
Esperance reduces infrastructure
development requirements.
Lower CAPEX and faster
project implementation.
Maintain alignment with approved freight routes
and leverage existing logistics providers.
Site Layout Optimisation Further optimisationof the
pit, stockpiles and plant locationrelative
to the 500 m exclusion zone may reduce
internal haulage distances.
Reduced operating costs and
improved productivity.
Undertake haulage simulationsand detailed layout
reviews.
CrushingCapacity The proposed Metso C160 primary
crusher provides capacity beyond the
current production requirement.
Potential throughput increases
with limited capital
investment.
Assess future production expansionscenarios
using existing plant infrastructure.
Infrastructure Expansion The DSO infrastructure could be utilised
as part of a future beneficiationor
spodumene concentrate project.
Reduced future development
costs.
Preserve plant expansionareas and incorporate
long-term development considerations into current
design.
Metallurgical Upside Testwork confirmsore suitability for DMS
and flotationprocessing.
Supports transition to a higher-
value concentrate operation.
Complete additional metallurgical testwork and
evaluate future concentrator options.
Offtake Partnerships Long-term strategic offtake agreements
may provide funding and market
certainty.
Improved project financingand
reduced market risk.
Engage potential customers early and pursue
strategic partnerships.
Market Recovery Improvement in lithium pricing and
demand could significantly enhance
project economics.
Higher project value and
investment attractiveness.
Maintain project readiness to take advantage of
favourable market conditions.
Key Project Risks Key Risk Mitigants
ORERESOURCES.COM.AU
Study Participants
• Sedgman – Study Manager
• On the Crest Mine Planning – Mine Design and Schedule
• Trepanier – Mineral Resource and Geological Model
• Peter O’Bryan & Associates – Geotechnical Assessment
• Astill Consulting – Environmental
28