Outstanding Maiden Mineral Resource at Nevada Li Project
Released
Released
Announcement PDF
15 April 2024
ASX ANNOUNCEMENT
OUTSTANDING MAIDEN MINERAL RESOURCE
ESTIMATE FOR 80% OWNED NEVADA LITHIUM
PROJECT
Highlights
Large-scale initial Mineral Resource Estimate (MRE) for the Nevada Lithium Project (NLP):
•
1.5 Bt @ 783 ppm Li for 6.2 Mt LCE (Lone Mountain deposit)
The Lone Mountain deposit has a north-south strike of +3 km, with mineralisation beginning
from only 35m below surface, with consistently wide intercepts across its entire strike
extent.
The deposit incorporates a contiguous, up to 66m thick selection of high-grade (+1,000 ppm
Li) claystone across the same strike extent.
Over 42% of the contained lithium in the maiden MRE is within the Indicated classification.
Potential for substantial growth (scale) and upgrade (classification) exists with Lone
Mountain remaining open at depth, and to the north and east.
The average MRE grade of 783 ppm Li is in-line with, or significantly higher than, large-scale
neighbouring projects (TLC 809 ppm1, Tonopah Flats 574 2 ppm, Horizon 680 ppm3).
The NLP is located near the mining hub of Tonopah and within a premier global mining
district that is home to other advanced lithium claystone projects such as Rhyolite Ridge
(ASX: INR), TLC (TSX: LI) and Thacker Pass (TSX: LAC).
The MRE was completed by Stantec Consulting (Stantec), a leading expert in lithium
claystone projects.
FBM will now evaluate a range of potential commercialisation options available for the NLP.
FBM Managing Director and CEO, Nick Rathjen, commented:
“To have advanced from the discovery hole at the NLP last year to a large-scale maiden MRE at elevated
grade, in less than 12 months, is a huge achievement. The FBM technical team deserve special recognition
for their combined geological thesis, exploration strategy and field success.
“With an initial 6.2 Mt contained LCE, at an average grade approaching 800 ppm Li, we are pleased to have
established the scale and further growth opportunity that exists at the NLP, particularly given the broader
regional context in which it is located. Lone Mountain is an impressive lithium deposit possessing many natural
advantages for accelerated development and commercialisation.
“We believe the NLP holds significant value, given the size and quality of lithium claystone deposition. It’s
location in a proven mining and development region, and within the U.S., a nation increasingly determined to
deliver itself home-grown security of critical raw material supply, makes NLP a significant discovery. Given its
1
2
3
Refer to American Lithium Announcement on 01 February 2023 – American Lithium Announces Positive PEA for TLC
Refer to American Battery Technology Company Announcement on 21 December 2023 – ABTC announces S-K 1300 Initial Assessment Tonopah Flats
Refer to Pan American Energy Announcement on 05 January 2024 – Pan American Energy Corp Announces filing of inaugural NI 43-101 Technical Report
Future Battery Minerals Ltd
info@futurebatteryminerals.com.au
Suite 10, 38 Colin St, West Perth WA 6005
+61 8 6383 7817
ABN 91 148 966 545
futurebatteryminerals.com.au
ASX: FBM
Follow Us
1
already impressive scale and tenor, we will now evaluative a range of commercialisation routes available to
the NLP, to find the optimal outcome for FBM shareholders.”
Future Battery Minerals Ltd (ASX: FBM) (FBM or the Company) is pleased to advise of the declaration of a
maiden Mineral Resource Estimate (MRE) for its Nevada Lithium Project (NLP) (80% FBM) in Nevada, U.S.
Outstanding maiden Mineral Resource Estimate (MRE) completed for the NLP
The NLP was acquired by FBM in mid-2022. Three subsequent phases of drilling totalling 5,700m saw the
Lone Mountain deposit successfully delineated over a north-south strike extent of over 3.0 km. These programs
also demonstrated that the Lone Mountain mineralisation starts from only 35m below surface, with
mineralisation consistently wide across its entire strike extent, and remains open at depth.
This drilling success culminated in the commissioning of Stantec Consulting (Stantec) to undertake a maiden
MRE for the NLP. Stantec has substantial relevant expertise and experience in the specific lithium claystone
mineralisation found at the NLP, including American Lithium Corp’s TLC project.
The maiden MRE incorporates all 24 Reverse Circulation (RC) and 3 Diamond Drill (DD) holes drilled to date
at the NLP.
The maiden MRE is reported at a base-case cut-off grade of 500 ppm Li and totals 1.5 Bt @ 783 ppm Li for
6.2 Mt lithium carbonate equivalent (LCE). Over 42% of the contained lithium in the maiden MRE reports to
the higher confidence Indicated classification.
Table 1: NLP Maiden MRE (March 2024) at 500 ppm Li cut-off grade
Category
Volume
Tonnes
Li
Thousand Metric Tonnes
Mm3
Mt
ppm
Li
Li2CO3
(LCE)
LiOH.H20
(LHE)
Indicated
375
638
774
494
2,627
2,988
Inferred
504
857
789
676
3,597
4,091
Total
879
1,495
783
1,170
6,224
7,079
Future Battery Minerals Ltd
info@futurebatteryminerals.com.au
Suite 10, 38 Colin St, West Perth WA 6005
+61 8 6383 7817
ABN 91 148 966 545
futurebatteryminerals.com.au
ASX: FBM
Follow Us
2
Figure 1: Plan view of Lone Mountain deposit showing FBM drillholes and maiden MRE outline divided into
Indicated and Inferred components
The potential exists for substantial growth (scale) and upgrade (classification), subject to further drilling. The
Lone Mountain deposit remains open at depth and to the north and east.
The average grade of the MRE (783 ppm Li) is broadly consistent with the closest neighbouring deposit, TLC
(813 ppm), and significantly higher than the other neighbouring deposits of Tonopah Flats (574 ppm) and
Horizon (680 ppm). It is noted that the Lone Mountain deposit also incorporates a contiguous, section of highgrade (+1,000 ppm Li) claystone up to 66m thick across its entire strike extent. This is readily illustrated when
utilising a higher cut-off grade of 900ppm, where the MRE delivers a combined total (Indicated plus Inferred)
of 361 Mt @ 1,001 ppm Li for 1.9Mt LCE (refer Table 2).
Future Battery Minerals Ltd
info@futurebatteryminerals.com.au
Suite 10, 38 Colin St, West Perth WA 6005
+61 8 6383 7817
ABN 91 148 966 545
futurebatteryminerals.com.au
ASX: FBM
Follow Us
3
Figure 2: Key long and cross sections through the Lone Mountain deposit showing block model grade estimates
and relative continuity of high-grade mineralisation
The NLP is located approximately 12 km from the historic mining hub of Tonopah, Nevada, and is readily
accessible year-round via State Route 95. It resides within a premier global mining district that is home to
advanced lithium claystone projects such as Rhyolite Ridge (Ioneer) and Thacker Pass (Lithium Americas). It
also sits in proximity to other major lithium claystone deposits including TLC (American Lithium), Tonopah
Flats (American Battery Technology Company) and Horizon (Pan American Energy) (refer Figure 3).
Future Battery Minerals Ltd
info@futurebatteryminerals.com.au
Suite 10, 38 Colin St, West Perth WA 6005
+61 8 6383 7817
ABN 91 148 966 545
futurebatteryminerals.com.au
ASX: FBM
Follow Us
4
Figure 3: NLP and neighbouring lithium claystone projects around the Tonopah region
Material Information Summary – Mineral Resource Estimation
Pursuant to ASX Listing Rule 5.8.1 and complementing JORC Table 1 (Sections, 1, 2 and 3) (contained in the
annexures of this release), FBM provides the following summary in regard to the MRE.
The MRE was prepared by lithium claystone mineralisation consulting expert, Stantec, which is located in Salt
Lake City, Utah, U.S. The Competent Persons for the MRE are Mariea Kartick (P.Geo.) and Joan Kester
(P.Geo.). Ms. Kartick is a Senior Resource Geologist with Stantec. Ms. Kester is a Senior Geologist with
Stantec and conducted the property site inspection on November 6-7, 2023. Both Competent Persons have
Future Battery Minerals Ltd
info@futurebatteryminerals.com.au
Suite 10, 38 Colin St, West Perth WA 6005
+61 8 6383 7817
ABN 91 148 966 545
futurebatteryminerals.com.au
ASX: FBM
Follow Us
5
relevant experience in the style of mineralization for lithium clays in accordance with the JORC Code. Refer to
the Competent Persons Statement at the end of this release for further information.
All MRE figures reported represent estimates as at 11 April 2024. The accuracy of estimates is, in part, a
function of the quality and quantity of available data and of engineering and geological interpretation and
judgment. Given the data available at the time, the estimates presented herein are considered reasonable.
However, they should be accepted with the understanding that additional data and analysis available after the
date of the estimates may necessitate revision. These revisions may be material.
The MRE is reported using the 2012 Australasian Code for Reporting of Mineral Resources and Ore Reserves
(JORC 2012) guidelines. JORC 2012 is viewed by Stantec as an appropriate guideline for lithium mineral
resource reporting in the U.S. as it is similar to the Canadian National Instrument (NI) 43-101 and US Security
and Exchange Commission (SEC) S-K 1300 guidelines.
Geology and Geological Interpretation
The Lone Mountain lithium mineralized clays are found within the Basin and Range physiographic region. This
region is distinguished by north-south orientated fault-bounded basins that contain thick basin fill sedimentary
deposits comprising of eroded highland formations from the intervening ranges that are understood to be the
source of the lithium.
The lithium resides within the sedimentary Tertiary Siebert formation delineated into three lithological clay
zones: upper, middle and lower Siebert. These lithologic zones were used as guide in the understanding of
the structural disposition of the lithium clay beds in the geologic model. The majority of drillholes in the MRE
model do not extend into crystalline basement below the Siebert formation, and the MRE remains open at
depth. Cross section locations through the geologic model are shown in Figures 2 and 3.
A depth of weathering has been determined based on drill hole intercepts between the overburden/alluvial
gravel and the upper boundary of the Tertiary Siebert Formation mineralized zone. The alluvial gravel is thicker
to the east of the property which has a thickness of approximately 250m and becomes thinner to the west of
the property (to approximately 50m). The Seibert beds outcrop at the southern end of the property as outlined
by the Nevada Bureau of Mining and Geology (NBMG) public domain maps. The MRE area is constrained by
the surface topography to the south, license boundary in the east, and by the margins of a fault-bounded
structure to the west.
Classification Criteria
The classification of the MRE into the Indicated and Inferred categories has taken into account the distribution
of the validated drillholes as well as the overall confidence in the interpretation of fault locations, structural
complexity and lithium quality information. The MRE (at various Li cut-off grades) are detailed in Table 2.
Figure 1 displays the Indicated and Inferred components of the MRE in plan view of the NLP. Approximately
42% of the MRE (by contained Li) is reported in Indicated classification and approximately 58% in Inferred
classification. The total MRE is 1.5 billion tonnes at a cut-off grade of 500ppm lithium within the theoretical pit.
Future Battery Minerals Ltd
info@futurebatteryminerals.com.au
Suite 10, 38 Colin St, West Perth WA 6005
+61 8 6383 7817
ABN 91 148 966 545
futurebatteryminerals.com.au
ASX: FBM
Follow Us
6
Table 2: NLP Maiden MRE (March 2024) at various Li cut-off grades
Cutoff
Volume
Tonnes
Li
Li (ppm)
(Mm3)
(Mt)
(ppm)
Thousand Metric Tonnes
Li
Li2CO3 (LCE)
LiOH.H20
2,897
3,295
Indicated
300
451
766
711
545
400
413
702
743
522
2,775
3,156
500
375
638
774
494
2,627
2,988
600
324
551
808
445
2,369
2,694
700
236
401
867
348
1,850
2,103
800
146
249
939
234
1,244
1,415
900
86
146
1,004
147
780
887
1000
38
64
1,070
68
364
414
Inferred
300
561
954
751
716
3,812
4,335
400
539
916
767
703
3,738
4,251
500
504
857
789
676
3,597
4,091
600
455
773
814
629
3,347
3,807
700
343
583
868
506
2,692
3,062
800
212
360
939
338
1,798
2,045
900
127
215
999
215
1,143
1,299
1000
53
90
1,068
96
511
582
NOTES:
• Base case mineral resource estimates are reported in bold.
• Base case cutoff grade of 500 ppm lithium is based on a mining plus processing cost of 48 US$/tonne, lithium
carbonate prices of US$20,000/tonne at a recovery of 90%.
• Mineral Resource are reported within a theoretical pit shell with constant slope of 45 degrees down to a maximum
depth pf 300 m below surface.
• All mineral resource are surface mineable only.
• Conversions: Li2CO3:Li ratio = 5.32, LiOH.H2O:Li ratio =6.05
• Totals may not represent the sum of the parts due to rounding.
• Mineral resources are not mineral reserves and do not have demonstrated economic viability. There is no certainty
that any mineral resource will be converted into mineral reserve.
• The Mineral Resource estimate has been prepared by Competent Persons Mariea Kartick, P. Geo. and Joan
Kester, P.Geo of Stantec Consulting Services Ltd.
Cut-Off Grade
The base-case cut-off grade of 500 ppm lithium is based on an estimated mining plus processing cost of
US$48/t, lithium carbonate price of US$20,000/t and recovery of 90%.
A combined MRE of Inferred and Indicated category resources is calculated utilising the 500 ppm lithium cutoff grade.
Sampling and Sub Sampling Techniques
Four phases of drilling and sampling occurred including both Core and RC drillholes targeting the clay rich
Siebert Formation that hosts lithium mineralization. Samples were transported to the analytical laboratory (ALS
USA Inc. in Reno Nevada) by lab personnel.
RC Samples
The RC samples were acquired every five feet (1.524 meters), collected from fluid and cuttings passed through
a cyclone equipped with a rotary splitter. Buckets were lined with pre-labelled 20x24 inch bags.
Future Battery Minerals Ltd
info@futurebatteryminerals.com.au
Suite 10, 38 Colin St, West Perth WA 6005
+61 8 6383 7817
ABN 91 148 966 545
futurebatteryminerals.com.au
ASX: FBM
Follow Us
7
DD (Core) Samples
Continuous core was collected once into the Siebert Formation. Core was stored in waxed cardboard core
boxes with labelled details (footage, box number, driller, sampler ID, run blocks marked with footage, and
recovery). The core boxes were then transported by FBM daily to the Tonopah FBM field office storage facility
on Ketten Road. Core was then reviewed for recovery, cleaned, photographed, logged and scanned by XRF.
All core was split into equal portions longitudinally, normal to bedding, by core saw or hand chisel and hammer
dependent on hardness and fractured nature of the material by a trained geological technician with oversight
by the logging geologist. Once split, one-half of the core was sampled and placed in a labelled sturdy bag for
pick up. The remaining core half was retained and archived in the original core box at the logging facility.
Sample intervals were determined based on logged features—lithology, oxidation, alteration, structure, etc.—
to ensure like material was included within sample interval and ranged from 1 to 6 ft (0.305 to 1.829 meters)
Drilling Techniques
RC Drilling
The RC drilling was performed with either a 5 1/8" (13.02 cm) or 5 1/2" (13.97 cm) hammer-bit, or 5 3/8" (13.65
cm) or 5 3/4" (14.61 cm) tricone drilling bit, and dual tube recovery system using injected dill fluids to maintain
drill cuttings flow to the surface, without contact with drillhole walls. RC drilling was conducted by Alford Drilling
LLC out of Elko Nevada with either a Foremost Explorer 1500 Buggy Tire or Schram 685 Truck Mounted drill
rig.
DD (Core) Drilling
Core drilling was performed with an HQ3 3.83" (9.73 cm) by Alford Drilling LLC using a LF-90D track mounted
drill rig with associated drill rig sumps for water. Core was not oriented.
Estimation Methodology
The geologic model from which the resource estimates are derived has been compiled using Hexagon
MinePlan modelling software (v 16.1.1). The model covers the central portion of the Lone Mountain Project
and incorporates information derived from 27 drillholes and public domain data acquired from NBMG (Bonham
and Garside ,1979) mapping. Drill data includes 24 reverse circulation (RC) and 3 diamond core (core) holes
that were completed in 2023. A block size of 20 m x 20 m x 5 m was selected to capture the necessary
topographic and grade resolution, plus other physical parameters, that would support a JORC-level MRE.
A surface topography grid was generated from a publicly sourced 10-meter digital elevation model (DEM)
using a triangulation algorithm. A depth of weathering is represented by a wireframe surface generated from
implicit modeling of drillhole intercepts between the overburden-alluvial gravel and the upper boundary of the
Tertiary Siebert Formation mineralized zone. The surface outcrop of the Seibert beds (mineralized zone) in
the south were implicitly modeled with the base of weathering surface interesting the topographic surface. The
mineralized zone wireframe solid from which resource are reported is constrained by surface topography,
overburden, license boundary in the east; and by the margin of a fault-structural zone to the west.
Lithium grades (ppm) from 1.5 m regular drillhole composite intervals were tagged from within the mineralized
zone (lithium clay) and were estimated into the model blocks using a zone match. An inverse distance squared
algorithm was used for estimating lithium grade up to a maximum horizontal search of 1,000 m and vertical
search of 12 m to simulate the bedded grade profile from the drillhole records. A minimum of 3 composites
and maximum number of 12 composites were used. The maximum number of composites per hole was 6. No
capping was applied prior to grade estimation.
Sample Analysis Method
All sample analysis was conducted by ALS Laboratories. The laboratory procedures used were 4-acid
digestion (ME-MS61) analysis for Phases 1 and 2, and Sodium Borate Fusion (ME-MS89L) for Phase 3. Both
methods are appropriate and acceptable standard practice methodologies for the purpose of lithium grade
estimation. Both methods are total.
Future Battery Minerals Ltd
info@futurebatteryminerals.com.au
Suite 10, 38 Colin St, West Perth WA 6005
+61 8 6383 7817
ABN 91 148 966 545
futurebatteryminerals.com.au
ASX: FBM
Follow Us
8
Mining and Metallurgical Methods and Parameters
The MRE is reported within a theoretical pit shell with constant slope of 45 degrees down to a maximum depth
of 300m below surface. All reported MRE is surface mineable only.
References
Bonham H.F. and Garside L.J., 1979: Geology of the Tonopah, Lone Mountain, Klondike and Northern Mud
Lake Quadrangles, Nevada, Nevada Bureau of Mines and Geology, bulletin 92, Mackay School of Mines,
University of Nevada, Reno.
Future Battery Minerals Ltd
info@futurebatteryminerals.com.au
Suite 10, 38 Colin St, West Perth WA 6005
+61 8 6383 7817
ABN 91 148 966 545
futurebatteryminerals.com.au
ASX: FBM
Follow Us
9
About the Nevada Lithium Project (NLP) (80% FBM)
The NLP comprises over 90km2 of tenure that is highly prospective for larger sedimentary-hosted lithium
deposits.
The region is home to several large sedimentary-hosted lithium deposits including Ioneer Resources’ (ASX:
INR) Rhyolite Ridge and American Lithium Corporation’s (TSX.V: LI) (US OTC: LIACF) (Frankfurt: 5LA1) TLC
Lithium Project. Albemarle Corporation’s (NYSE: ALB) Silver Peak Lithium Mine, currently the only producing
lithium mine in North America, lies approximately 45 km to the west of the NLP.
The Phase 1 2,900m RC drilling programme was completed in March 2023, successfully discovering lithiumbearing claystone lithologies of the Siebert Formation, highlighted by the intercept of 109.7m @ 766ppm Li
from 135.6m WF23-011 4. Significantly, thick, high-grade lithium–claystone was intersected in three additional
drill holes at the Western Flats Prospect (now part of the broader Lone Mountain Prospect to the south).
The Phase 2 drilling programme in July 2023 successfully intercepted thick, shallow lithium mineralisation at
the Lone Mountain Prospect with results including 5:
179.8m @ 766ppm from 39.6m (WF23-015)
Including 19.8m @ 1,010ppm from 80.8m
170.7m @ 764ppm Li from 67.1m to end of hole (WF23-014)
Including 27.4m 1,030ppm Li from 112.8m
Phase 3 diamond and RC drilling successfully confirmed the depth and strike extension of high-grade
mineralisation. Significant intercepts included:
266m @ 855 ppm Li from 140m (WF23-011C)
148m @ 795 ppm Li from 152m (WF23-009C)
o
4
5
Including 66m @ 1,001 ppm Li from 216m
Including 60m @ 918 ppm Li from 191m
180m @ 818 ppm Li from 40m (WF23-015C)
Including 51m @ 915 ppm Li from 53m; and
23m @ 1,081 ppm from 182m.
Refer to ASX Announcement on 13 April 2023, “High Grade Lithium Claystone Discovered in Nevada”.
Refer to ASX Announcement on 4 August 2023, “Large Scale Lithium Discovery Confirmed in Nevada”.
Future Battery Minerals Ltd
info@futurebatteryminerals.com.au
Suite 10, 38 Colin St, West Perth WA 6005
+61 8 6383 7817
ABN 91 148 966 545
futurebatteryminerals.com.au
ASX: FBM
Follow Us
10
Figure 4: Regional location of NLP
Future Battery Minerals Ltd
info@futurebatteryminerals.com.au
Suite 10, 38 Colin St, West Perth WA 6005
+61 8 6383 7817
ABN 91 148 966 545
futurebatteryminerals.com.au
ASX: FBM
Follow Us
11
This announcement has been authorised for release by the Board of Directors of the Company.
-ENDFor further information visit www.futurebatteryminerals.com or contact:
Nicholas Rathjen
Managing Director
E: nrathjen@futurebatteryminerals.com.au
Robin Cox
Technical Director
E: rcox@futurebatteryminerals.com.au
Competent Persons Statement
The information in this announcement that relates to the Mineral Resource Estimate is based on and fairly represents
information compiled by Ms. Mariea Kartick (P.Geo.) and Ms. Joan Kester (P.Geo.). Ms. Kartick is a Senior Resource
Geologist with Stantec Consulting Services Inc. (Stantec). Joan Kester is a Senior Geologist with Stantec and conducted
the property site inspection on November 6-7, 2023. Both have sufficient experience that is relevant to the style of
mineralisation and type of deposit under consideration and to the activity being undertaken to qualify as a Competent
Person as defined in the 2012 Edition of the Australasian Code for Reporting of Exploration Results, Mineral Resources
and Ore Reserves. Ms. Kartick is registered with the Professional Geoscientist of Ontario (PGO), Member 3226. Ms. Kester
is a registered member of the Society for Mining, Metallurgy & Exploration (SME), member #04294447. Both professional
bodies are listed as recognized overseas professional organizations accepted for the purpose of reporting in accordance
with Appendix 5A of the Australian Securities Exchange Listing Rules (ROPO letter, 2007). Ms. Kartick and Ms. Kester
consent to the inclusion in this announcement of the matters based on their information in the form and context in which it
appears.
The information in this announcement that relates to exploration results is based on and fairly represents information
compiled by Mr Robin Cox BSc (E.Geol), a Competent Person, who is a Member of the Australian Institute of Mining and
Metallurgy. Mr Cox is the Company’s Chief Geologist and has sufficient experience that is relevant to the style of
mineralisation and type of deposit under consideration and to the activity being undertaken to qualify as a Competent
Person as defined in the 2012 Edition of the Australasian Code for Reporting of Exploration Results, Mineral Resources
and Ore Reserves. Mr Cox consents to the inclusion in this announcement of the matters based on his information in the
form and context in which it appears.
Forward-Looking Statements
This document may include forward-looking statements. Forward-looking statements include, but are not limited to,
statements concerning Future Battery Minerals Limited’s planned exploration program and other statements that are not
historical facts. When used in this document, the words such as "could," "plan," "estimate," "expect," "intend," "may”,
"potential", "should," and similar expressions are forward-looking statements. Although Future Battery Minerals Limited
believes that its expectations reflected in these forward-looking statements are reasonable, such statements involve risks
and uncertainties and no assurance can be given that actual results will be consistent with these forward-looking
statements.
Previously Reported Results
The information in this announcement that relates to Exploration Results is extracted from the ASX announcements
(Original Announcements), as referenced, which are available at www.futurebatteryminerals.com.au. FBM confirms that it
is not aware of any new information or data that materially affects the information included in the Original Announcements
and, that all material assumptions and technical parameters underpinning the estimates in the Original Announcements
continue to apply and have not materially changed. FBM confirms that the form and context in which the Competent
Persons’ findings are presented have not been materially modified from the original announcement.
Future Battery Minerals Ltd
info@futurebatteryminerals.com.au
Suite 10, 38 Colin St, West Perth WA 6005
+61 8 6383 7817
ABN 91 148 966 545
futurebatteryminerals.com.au
ASX: FBM
Follow Us
12
JORC Code, 2012 Edition, Table 1
Section 1: Sampling Techniques and Data
Criteria
Sampling
techniques
JORC Code explanation
•
•
•
Commentary
Nature and quality of sampling
(eg cut channels, random chips,
or specific specialised industry
standard measurement tools
appropriate to the minerals
under investigation, such as
down hole gamma sondes, or
handheld XRF instruments,
etc). These examples should
not be taken as limiting the
broad meaning of sampling.
Include reference to measures
taken to ensure sample
representivity and the
appropriate calibration of any
measurement tools or systems
used.
Aspects of the determination of
mineralisation that are Material
to the Public Report. In cases
where ‘industry standard’ work
has been done this would be
relatively simple (eg ‘reverse
circulation drilling was used to
obtain 1 m samples from which
3 kg was pulverised to produce
a 30 g charge for fire assay’). In
other cases more explanation
may be required, such as where
there is coarse gold that has
inherent sampling problems.
Unusual commodities or
mineralisation types (eg
submarine nodules) may
warrant disclosure of detailed
information.
• Both Core and RC sampling targeted
the clay rich Siebert Formation. 4
phases of drilling and sampling
occurred. Samples were transported
to the analytical laboratory (ALS
USA Inc. in Reno, Nevada) by lab
personnel for 4 acid digestion (MEMS61) analysis or Sodium borate
Fusion (ME-MS89L). All samples
were scanned with a portable 2013
Olympus Delta XRF scanner to aid
logging. RC 5-foot interval chip trays
and continuous core picks were
logged using a 7x – 45x powered
microscope. QA/QC samples were
collected at a rate of 11.5%.
• Phase 1, 2 and 4 RC Drilling: The
RC samples were acquired every
five feet (1.524 meters) collected
from fluid and cuttings passed
through a cyclone equipped with a
rotary splitter for Phase 1 and no
rotary splitter for Phase 2 and 4.
Buckets were lined with prelabeled
20x24 inch bags. Sample bags and
chip trays were prelabeled for field
staff. A Future Battery Minerals
(FBM) geologist collected the
samples or trained the rig sampler in
methods and required average 5
kilograms sample volumes. Field
personnel monitored the drilled
depth, and drilling was briefly paused
at the end of each sample run to
circulate the cuttings to surface.
Each sample interval was logged at
the rig by the supervising geologist.
Samples were stored at the drill sites
within supersacks until pickup. In
phase 2 overlying alluvium was no
longer sampled in its entirety and in
some cases composited.
• Phase 3 Core Drilling: Continuous
core was collected once the Siebert
Formation was intercepted. Core
was stored in waxed cardboard core
boxes with labeled details (footage,
box number, driller, sampler ID, run
blocks marked with footage, and
recovery). The core boxes were then
transported by FBM daily to the FBM
Future Battery Minerals Ltd
info@futurebatteryminerals.com.au
Suite 10, 38 Colin St, West Perth WA 6005
+61 8 6383 7817
ABN 91 148 966 545
futurebatteryminerals.com.au
ASX: FBM
Follow Us
13
Criteria
JORC Code explanation
Commentary
field office storage facility on Ketten
Road, Tonopah, Nevada. Core was
then reviewed for recovery, cleaned,
photographed, logged and scanned
by XRF. All core was split into equal
portions longitudinally, normal to
bedding, by core saw or hand chisel
and hammer dependent on hardness
and fractured nature of the material
by a trained geological technician
with oversight by the logging
geologist. Once split, one-half of the
core, was sampled and placed in a
labeled sturdy bag for pick up. The
remaining core half was retained and
archived in the original core box at
the logging facility. Sample intervals
were determined based on logged
features: lithology, oxidation,
alteration and structure to ensure like
material was included within sample
interval and ranged from 1 to 6 ft
(0.305 to 1.829 meters)
Drilling
techniques
Drill sample
recovery
•
Drill type (eg core, reverse
circulation, open-hole hammer,
rotary air blast, auger, Bangka,
sonic, etc) and details (eg core
diameter, triple or standard tube,
depth of diamond tails,
Share your feedback
Discover