Highlights
Receipt of ministerial approval for new Conservation Management Plan on northern and most
prospective part of Kangaroo Hills Lithium Project (KHLP).
Program of Work (POW) for drilling of key northern targets to be lodged imminently with
Department of Energy, Mines, Industry Regulation and Safety (DEMIRS).
Drilling of key northern targets planned to commence promptly upon approval of the POW,
which is expected mid – March.
Reverse Circulation (RC) drilling contractor selected and scheduled to commence on receipt
of POW.
This Phase 4 drilling program is set to initially focus on testing the interpreted northern
continuity of the shallow, thick, gently dipping, and high-grade lithium mineralisation
intersected at Big Red, which includes:
29m @ 1.36% Li2O from 38m (KHRC011) 1
27m @ 1.32% Li2O from 64m (KHRC017) 2
23m @ 1.03% Li2O from 53m (KHRC031) 3
23m @ 1.19% Li2O from 44m (KHDD001)1
22m @ 1.24% Li2O from 23m (KHDD006) 4
Other key northern targets to be tested as part of this Phase 4 program include high-potential
optimised resistivity anomalies at the Western Grey, Quokka, Big Red West, and Whip Tail
prospects.
Future Battery Minerals Ltd (ASX: FBM) (FBM or the Company) is pleased to advise of the receipt of
ministerial approval for its new Conservation Management Plan (CMP) over the northern area of its 100%owned Kangaroo Hills Lithium Project (KHLP) in Western Australia, which encompasses the Kangaroo Hills
Timber Reserve.
FBM Managing Director, Nicholas Rathjen, commented:
“We are excited to have achieved the key awaited milestone of ministerial approval for our new CMP over the
northern part of the KHLP. With this now received, and pending only approval of our POW for drilling in this
area, we can truly go after the targeted extension of the potentially high-value lithium mineralisation identified
at Big Red – which remains wide open along strike to the north and at depth.”
1
Refer to ASX Announcement dated 20 March 2023 – “LCT-Pegmatite Discovery Confirmed at Kangaroo Hills”.
2
Refer to ASX Announcement dated 3 May 2023 – “Multiple Thick High-Grade Results Extend Lithium Discovery”.
Refer to ASX Announcement dated 22 June 2023 – “Further High-Grade Lithium Assays at Big Red Discovery, New Pegmatite
Uncovered at The Rocky Prospect”.
3
4
Refer to ASX Announcement dated 17 October 2023 – “Kangaroo Hills High-Grade Lithium System Continues to Grow”.
Future Battery Minerals Ltd
info@futurebatteryminerals.com.au
Suite 10, 38 Colin St, West Perth WA 6005
+61 8 6383 7817
ABN 91 148 966 545
futurebatteryminerals.com.au
ASX: FBM
Follow Us
1
“In addition to the Big Red Extension, the northern part of the KHLP also offers several other high-potential
regional resistivity anomaly targets including the Western Grey, Quokka, Big Red West, and Whip Tail
prospects. Select drilling of these targets is also incorporated in planned Phase 4 drilling activities, which are
scheduled to commence promptly upon POW receipt – expected to be during the current quarter.”
Figure 1: Big Red Extension and Regional Targets
Future Battery Minerals Ltd
info@futurebatteryminerals.com.au
Suite 10, 38 Colin St, West Perth WA 6005
+61 8 6383 7817
ABN 91 148 966 545
futurebatteryminerals.com.au
ASX: FBM
Follow Us
2
Key environmental approval received
Receipt of the relevant ministerial approval of its new CMP (covering the Kangaroo Hills Timber Reserve)
represents a key milestone for FBM. The Company has previously undertaken select drilling in the northern
KHLP area under its existing CMP. Following the discovery of Big Red immediately to the south and upon
FBM’s subsequent application to conduct further drilling in this area (which covers the interpreted extension of
Big Red to the north, following the dip and strike extent of the pegmatite), the Department of Biodiversity,
Conservation and Attractions (DBCA) required FBM to develop a new CMP reflecting evolved circumstances.
During the period required to develop and progress to approval of this new CMP, FBM was not able to
undertake any drilling activities on these highly prospective northern KHLP areas. However, it did not restrict
the Company from undertaking non-ground disturbing activities across this part of its tenure. This work, which
included further target generative geophysical programmes, soil sampling, field mapping, and rock chip
sampling resulted in excellent and critical target refinement.
FBM now plans to immediately lodge the POW for its planned Phase 4 drilling activities in the northern part of
the KHLP with DEMIRS. Following the expected approval of this POW, the Company expects to commence
drilling promptly thereafter. Commencement of these Phase 4 drilling activities at the KHLP remains on track
for the current quarter and scheduled for mid-March.
Phase 4 drilling: Big Red strike extension and northern resistivity targets
The initial focus of the Phase 4 program is RC drilling of the Big Red Extension target (overlaying resistivity
anomaly), which is located immediately north of the limits of current drilling at Big Red (refer to Figure 1). This
drilling will target the continuation of the shallow, wide, high-grade intersections returned in FBM’s earlier
phased drilling of Big Red including (all results previously released). 5,6,7,8,9
•
29m @ 1.36% Li2O from 38m (KHRC011)
•
27m @ 1.32% Li2O from 64m (KHRC017)
•
23m @ 1.03% Li2O from 53m (KHRC031)
•
23m @ 1.19% Li2O from 44m (KHDD001)
•
22m @ 1.24% Li2O from 23m (KHDD006)
•
19m @ 1.03% Li2O from 42m (KHRC015)
•
16m @ 1.09% Li2O from 11m (KHRC022)
•
15m @ 1.03% Li2O from 39m (KHRC029)
•
13m @ 1.23% Li2O from 41m (KHRC030)
•
10m @ 1.30% Li2O from 25m (KHDD002)
5
Refer to ASX Announcement dated 17 October 2023 – “Kangaroo Hills High-Grade Lithium System Continues to Grow”.
6
Refer to ASX Announcement dated 20 March 2023 – “LCT – Pegmatite Discovery Confirmed at Kangaroo Hills”.
Refer to ASX Announcement dated 8 June 2023 – “New High Priority LCT Pegmatite Drill Targets Highlight Potential Scale at
Kangaroo Hills”.
7
8
Refer to ASX Announcement dated 18 July 2023 – “Further High-Grade Lithium Results at Kangaroo Hills”.
9
Refer to ASX Announcement dated 16 November 2023 – “Further Shallow, High-Grade Lithium Intercepts at Kangaroo Hills”.
Future Battery Minerals Ltd
info@futurebatteryminerals.com.au
Suite 10, 38 Colin St, West Perth WA 6005
+61 8 6383 7817
ABN 91 148 966 545
futurebatteryminerals.com.au
ASX: FBM
Follow Us
3
Figure 2: Long Section highlighting Big Red and Rocky Mineralisation open to the North
Figure 3: Maximum down hole grade Big Red and Rocky Pegmatite units
Future Battery Minerals Ltd
info@futurebatteryminerals.com.au
Suite 10, 38 Colin St, West Perth WA 6005
+61 8 6383 7817
ABN 91 148 966 545
futurebatteryminerals.com.au
ASX: FBM
Follow Us
4
Broader Phase 4 drilling activities are set to include RC scout testing of other key northern resistivity anomaly
targets at the Western Grey, Quokka, Big Red West, and Whip Tail prospects:
•
Western Grey hosts outcropping pegmatites anomalous in tin and tantalum which were poorly tested
during Phase 1 KHLP drilling. The recently completed optimised resistivity survey (refer FBM ASX release
dated 18 December 2023) has refined the Western Grey target, allowing more precise and better targeted
drill hole placement for testing in the Phase 4 drilling.
•
At Quokka, rock chip sampling identified outcropping lithium bearing pegmatites with results up to 1.4%
Li2O (refer to Table 1). Early geophysical data noted a coincident resistivity anomaly, with the recent
optimised survey advancing this target to drill-ready status.
•
Big Red West hosts outcropping pegmatites located approximately 500m west of Big Red. These
pegmatites are interpreted to be the potential source of the of the first lithium intercept returned from the
KHLP of 6m @ 1.38% Li2O from 198m (NPRC084; refer FBM ASX release dated 24 November 2022).
Follow-up of this key target zone is demanded by the geological and geophysical vectoring.
•
Whip Tail is a new anomaly target that was identified following the recent optimised resistivity survey and
is also coincident with outcropping pegmatites.
•
Big Red North is a new anomaly target that was identified following the recent optimised resistivity survey
and is also coincident with outcropping pegmatites.
This announcement has been authorised for release by the Board of Directors of the Company.
-ENDFor further information visit www.futurebatteryminerals.com or contact:
Nicholas Rathjen
Robin Cox
CEO & Managing Director
Technical Director
E: nrathjen@futurebatteryminerals.com.au
E: rcox@futurebatteryminerals.com.au
Competent Persons Statement
The information in this announcement that relates to exploration results is based on and fairly represents information
compiled by Mr Robin Cox BSc (E.Geol), a Competent Person, who is a Member of the Australian Institute of Mining and
Metallurgy. Mr Cox is the Company’s Chief Geologist and has sufficient experience that is relevant to the style of
mineralisation and type of deposit under consideration and to the activity being undertaken to qualify as a Competent
Person as defined in the 2012 Edition of the Australasian Code for Reporting of Exploration Results, Mineral Resources
and Ore Reserves. Mr Cox consents to the inclusion in this announcement of the matters based on his information in the
form and context in which it appears.
Forward-Looking Statements
This document may include forward-looking statements. Forward-looking statements include, but are not limited to,
statements concerning Future Battery Minerals Limited’s planned exploration program and other statements that are not
historical facts. When used in this document, the words such as "could," "plan," "estimate," "expect," "intend," "may”,
"potential", "should," and similar expressions are forward-looking statements. Although Future Battery Minerals Limited
believes that its expectations reflected in these forward-looking statements are reasonable, such statements involve risks
and uncertainties and no assurance can be given that actual results will be consistent with these forward-looking
statements.
Previously Reported Results
The information in this announcement that relates to Exploration Results is extracted from the ASX announcements
(Original Announcements), as referenced, which are available at www.futurebatteryminerals.com.au. FBM confirms that it
is not aware of any new information or data that materially affects the information included in the Original Announcements
and, that all material assumptions and technical parameters underpinning the estimates in the Original Announcements
continue to apply and have not materially changed. FBM confirms that the form and context in which the Competent
Persons’ findings are presented have not been materially modified from the original announcement.
Future Battery Minerals Ltd
info@futurebatteryminerals.com.au
Suite 10, 38 Colin St, West Perth WA 6005
+61 8 6383 7817
ABN 91 148 966 545
futurebatteryminerals.com.au
ASX: FBM
Follow Us
5
About Kangaroo Hills Lithium Project (KHLP) – 100%
The KHLP is a recent and exciting hard rock lithium discovery located in the Goldfields of Western Australia,
approximately 17km south of the major township of Coolgardie. Spodumene mineralisation within LithiumCaesium-Tantalum (LCT) pegmatites was discovered during regional exploration drilling of the Nepean Nickel
Project in late 2022. Exploration efforts to date have significantly expanded on these initial results, with two
subsequent rounds of drilling totalling 47 holes and over 6,000m. This drilling has identified the Big Red
Prospect, an outcropping, north-dipping pegmatite returning an intercept of 29m @ 1.36% Li2O from 38m 10,
and with spodumene identified as the dominant lithium mineral. Through the implementation of regional target
generative work involving mapping, geophysics and geochemistry, six additional high priority prospects have
been identified. These high priority prospects have the potential to host further LCT pegmatites.
The location of the KHLP provides significant advantages to FBM. Located on the doorstep of a premier mining
district, the Goldfields of Western Australia, and specifically Kalgoorlie (50km east of the KHLP), host a
professional mining and exploration workforce. This provides FBM with ready access to skilled labour and
regional infrastructure critical to the development of any future mining project. The Goldfields region is also a
notably lithium endowed province of Western Australia, with numerous operating and developing lithium
projects. Notably, the KHLP is only 30km west of the Mt Marrion Lithium Mine operated by Mineral Resources
(ASX: MRL). The KHLP site is accessible via a sealed road leading south from Coolgardie, ensuring FBM has
continuous access all year-round.
10 Refer to ASX Announcement on 20 March 2023
– LCT – Pegmatite Discovery Confirmed at Kangaroo Hills
Future Battery Minerals Ltd
info@futurebatteryminerals.com.au
Suite 10, 38 Colin St, West Perth WA 6005
+61 8 6383 7817
ABN 91 148 966 545
futurebatteryminerals.com.au
ASX: FBM
Follow Us
6
Table 1 – KHLP North Rock Chip Samples Li2O >0.01% (UTM MGA94 Zone 51)
Hole ID
ND36157
ND36158
ND36345
ND36346
ND36347
ND36348
ND36349
ND36350
ND36351
ND36352
ND36353
ND36354
ND36355
ND36356
ND36357
ND36358
ND36359
ND36361
ND36362
ND36363
ND36364
ND36365
ND36366
ND36367
ND36368
ND36369
ND36370
ND36371
ND55011
ND55012
ND55013
ND55014
ND55015
ND55016
ND55017
ND55018
ND55019
ND55021
ND55022
ND55023
ND55025
ND55026
ND55027
ND55028
ND55029
ND55030
Northing
6558188
6558267
6557378
6557610
6557708
6557800
6557824
6557738
6558049
6557625
6557667
6557718
6558536
6558587
6558477
6558658
6556738
6557454
6557569
6557584
6557504
6557465
6557454
6557167
6556297
6556180
6557572
6557526
6558094
6558111
6558141
6558164
6558199
6558514
6558569
6558455
6558437
6558657
6558640
6558641
6558660
6559392
6559810
6559809
6559821
6559821
Easting
317884
317867
318515
318321
318266
318299
318168
318167
318266
318271
318271
318338
317813
318084
316876
316770
316160
316435
316577
316498
317116
317193
317171
317309
316094
316017
316295
316227
318110
318086
318078
318065
318206
316577
316561
316586
316670
316710
316718
316737
316778
317587
317976
317989
318023
318021
Type
ROCK
ROCK
ROCK
ROCK
ROCK
ROCK
ROCK
ROCK
ROCK
ROCK
ROCK
ROCK
ROCK
ROCK
ROCK
ROCK
ROCK
ROCK
ROCK
ROCK
ROCK
ROCK
ROCK
ROCK
ROCK
ROCK
ROCK
ROCK
ROCK
ROCK
ROCK
ROCK
ROCK
ROCK
ROCK
ROCK
ROCK
ROCK
ROCK
ROCK
ROCK
ROCK
ROCK
ROCK
ROCK
ROCK
Li2O%
0.04
0.10
0.02
0.01
0.02
0.01
0.02
0.01
0.00
0.01
0.02
0.04
0.01
0.01
0.25
1.39
0.09
0.02
0.03
0.02
0.01
0.02
0.02
0.02
0.02
0.01
0.03
0.02
0.00
0.00
0.02
0.01
0.00
0.74
0.06
0.06
0.01
0.02
0.02
0.10
0.01
0.00
0.02
0.01
0.00
0.00
Ta ppm
114.5
122.5
12.7
0.5
34
10.9
2
40.9
76.5
3.4
4.5
61.2
235
90.7
367
231
15.2
109
84
44.9
66.7
173.5
75.8
62.2
39.1
37.1
54.7
74.3
1.6
76.6
36.6
65.5
63.6
122.5
136.5
48
237
69.2
42
32.2
54.2
0.5
148
307
51.5
198.5
Future Battery Minerals Ltd
info@futurebatteryminerals.com.au
Suite 10, 38 Colin St, West Perth WA 6005
+61 8 6383 7817
ABN 91 148 966 545
futurebatteryminerals.com.au
Cs ppm
60.8
33
22.6
2.8
36.1
7.8
4
4.8
4.4
2.8
4.5
54.9
64.6
17.9
61.9
2790
200
106
78
159.5
45
48.5
48.7
11
3.5
177.5
64.3
16.5
1.5
30.8
59
15.2
62.3
112
110
25.7
4.4
58.1
37.7
64.7
47.3
4.7
243
156
11.8
16.3
Sn ppm
6
25
19
5
5
5
5
5
5
5
5
23
42
14
24
158
42
95
37
17
5
7
7
0
0
5
12
10
5
27
41
37
14
51
48
13
5
19
21
47
8
5
42
42
15
16
ASX: FBM
Follow Us
7
ND55031
ND55032
ND55033
ND55034
ND55035
ND55036
ND55037
ND55038
ND55039
ND55041
ND55042
ND55043
ND55044
ND55045
ND55046
ND55047
ND55048
ND55049
ND55050
ND55051
ND55052
ND55053
ND55054
ND55055
ND55056
6559820
6559785
6559793
6559795
6559772
6559817
6559182
6559376
6559216
6559237
6559279
6559272
6558686
6558854
6559697
6559409
6559601
6559425
6559646
6559484
6559479
6559453
6559423
6558961
6560054
318022
317981
317959
317923
317973
317982
317374
317421
317439
317454
317439
318089
316464
317072
317512
317767
318016
317822
317124
317201
317147
317087
317144
316733
318223
ROCK
ROCK
ROCK
ROCK
ROCK
ROCK
ROCK
ROCK
ROCK
ROCK
ROCK
ROCK
ROCK
ROCK
ROCK
ROCK
ROCK
ROCK
ROCK
ROCK
ROCK
ROCK
ROCK
ROCK
ROCK
0.00
0.01
0.03
0.01
0.01
0.02
0.00
0.00
0.01
0.00
0.00
0.01
0.04
0.01
0.00
0.02
0.01
0.01
0.01
0.02
0.01
0.00
0.01
0.01
0.00
199.5
414
217
188.5
223
171
187.5
186
277
321
567
103
74.9
48.7
165.5
168
96.3
151
149
157
134.5
152
191
80.3
58.9
Future Battery Minerals Ltd
info@futurebatteryminerals.com.au
Suite 10, 38 Colin St, West Perth WA 6005
+61 8 6383 7817
ABN 91 148 966 545
futurebatteryminerals.com.au
11.9
76.6
321
184
50.4
99.7
1.3
0.5
1.4
0.9
2.5
10.7
1.2
42.4
0.3
261
286
16.4
67.4
40.3
156
0.9
26.7
94.6
12.4
12
24
41
42
25
40
5
5
5
5
19
14
5
6
5
63
85
25
30
36
32
6
52
43
27
ASX: FBM
Follow Us
8
JORC Code, 2012 Edition, Table 1 (Kangaroo Hills Lithium Project)
Section 1: Sampling Techniques and Data
CRITERIA
Sampling
techniques
EXPLANATION
● Nature and quality of sampling (eg cut
channels, random chips, or specific
specialised industry standard
measurement tools appropriate to the
minerals under investigation, such as
down hole gamma sondes, or handheld
XRF instruments, etc). These examples
should not be taken as limiting the broad
meaning of sampling.
● Include reference to measures taken to
ensure sample representivity and the
appropriate calibration of any
measurement tools or systems used.
● Aspects of the determination of
mineralisation that are Material to the
Public Report. In cases where ‘industry
standard’ work has been done this would
be relatively simple (eg ‘reverse circulation
drilling was used to obtain 1m samples
from which 3kg was pulverised to produce
a 30g charge for fire assay’). In other
cases more explanation may be required,
such as where there is coarse gold that
has inherent sampling problems. Unusual
commodities or mineralisation types (eg
submarine nodules) may warrant
disclosure of detailed information.
COMMENTARY
Drilling
Future Battery Minerals Limited (FBM):
● Lithium-Caesium-Tantalum (LCT)
mineralisation at the Kangaroo Hills Lithium
Project (KHLP) has been sampled from the
following drilling techniques.
● Reverse circulation (RC) drilling creates
1m samples of pulverised chips,
approximately 3kg’s is collected in
individual calico bags
● Diamond core drilling (DD) reported is yet
to be sampled. Sampling will be conducted
on quarter core in order to preserve bulk
sample for metallurgical test work.
● Rock Chip samples are collected from out
crop, sub crop in the field.
Air Magnetic Survey
Contractor: UTS
Client: St Francis Mining Ltd
Year: 1996
Aircraft: Fletcher
Instrumentation: Cesium Vapour
Sample Interval: ~5m
Flight Line Spacing: 50 and 100m
Flight Line Direction: 068o-248o, 158o-338o,
090o-270o
Tie Line Spacing: 500m and 1000m
Mean Terrain Clearance: 25m
Navigation: Differential GPS
IP Parameters
Contractor: Vortex Geophysics
Receiver: 1-2x GDD 16 channel IP Receiver
Transmitter: Vortex VIP-30 transmitter system
rated at 1500V, 30A and 15KVA
Configuration: Dipole-Dipole
Line Spacing: 200m
Dipole spacing: 100m
Domain/Cycle: Time domain – 2 seconds or
0.125Hz
Drilling
techniques
Drill sample
recovery
●
●
●
●
Drill type (eg core, reverse circulation,
open-hole hammer, rotary air blast, auger,
Bangka, sonic, etc) and details (eg core
diameter, triple or standard tube, depth of
diamond tails, face- sampling bit or other
type, whether core is oriented and if so, by
what method, etc).
Method of recording and assessing core
and chip sample recoveries and results
assessed.
Measures taken to maximise sample
recovery and ensure representative nature
of the samples.
Whether a relationship exists between
sample recovery and grade and whether
sample bias may have occurred due to
FBM:
•
RC drilling was conducted on reported
results in this announcement
•
HQ Diamond Core drilling is reported in this
announcement.
FBM.
•
Sample recovery is noted in the field for
each individual sample. Sample is
collected via a cyclone and cone splitter
attached to the drill rig, which is
considered standard for RC sampling.
•
Diamond core recovery is recorded by
both the drilling contractors and
measured by FBM geologists
Future Battery Minerals Ltd
info@futurebatteryminerals.com.au
Suite 10, 38 Colin St, West Perth WA 6005
+61 8 6383 7817
ABN 91 148 966 545
futurebatteryminerals.com.au
ASX: FBM
Follow Us
9
CRITERIA
Logging
EXPLANATION
preferential loss/gain of fine/coarse
material.
●
●
●
Sub-sampling
techniques and
sample
preparation
●
●
●
●
●
●
Quality of assay
data and
laboratory tests
●
●
●
COMMENTARY
•
No relationship between sample recovery
and grade has been yet observed and no
sample bias is believed to have occurred.
Whether core and chip samples have been
geologically and geotechnically logged to a
level of detail to support appropriate
Mineral Resource estimation, mining
studies and metallurgical studies.
Whether logging is qualitative or
quantitative in nature. Core (or costean,
channel, etc) photography.
The total length and percentage of the
relevant intersections logged.
FBM:
•
Drill chips are lithologically logged by
Geologists in the field
•
Logging is qualitative, recording rock type
and mineral abundance
•
Logging of RC chips is conducted on a 1
metre sample size.
•
Core is logged lithologically by Geologists
in the field.
•
Natural changes in mineral abundance
are recorded
If core, whether cut or sawn and whether
quarter, half or all core taken.
If non-core, whether riffled, tube sampled,
rotary split, etc and whether sampled wet
or dry.
For all sample types, the nature, quality
and appropriateness of the sample
preparation technique.
Quality control procedures adopted for all
sub-sampling stages to maximise
representivity of samples.
Measures taken to ensure that the
sampling is representative of the in-situ
material collected, including for instance
results for field duplicate/second-half
sampling.
Whether sample sizes are appropriate to
the grain size of the material being
sampled.
The nature, quality and appropriateness of
the assaying and laboratory procedures
used and whether the technique is
considered partial or total.
For geophysical tools, spectrometers,
handheld XRF instruments, etc, the
parameters used in determining the
analysis including instrument make and
model, reading times, calibrations factors
applied and their derivation, etc.
Nature of quality control procedures
adopted (eg standards, blanks, duplicates,
external laboratory checks) and whether
acceptable levels of accuracy (i.e. lack of
bias) and precision have been established.
FBM:
● 1m RC percussion, sample is split via a
cyclone and cone splitter attached to the
drill rig to produce a bagged 3kg sample.
● Certified reference material and blank
material are inserted every 20 samples as
per company QA/QC procedure for both
DD & RC.
● Field duplicates collected from the Cyclone
and cone splitter are inserted every 60
samples
● Sample weights per metre range between
1-3kg.
● Diamond core sampling will consist of cut
core with quarter core utilised for
geochemical assay.
FBM:
● ALS Minerals, multi element analysis
method ME-ICP61 utilised for all samples,
consisting of multi acid digestion with HF and
ICP-AES analysis. Over limit method NiOG62H for ore grade Ni consisting of four
acid digestion with ICP-AES analysis. PGMICP23 fire assay ICP-AES finish method
used selectively for samples considered to
contain Pt, Pd & Au. All methods are
considered suitable for the style of
mineralisation targeted.
● Certified Reference Material (CRM’s)and
quartz blank (Blanks) samples are inserted
1:20 for DD & RC and 1:30 for AC as part
of Future Battery’s QA/QC procedure.
Accuracy and performance of CRM’s and
Blanks are considered after results are
received.
● Field duplicates collected from the Cyclone
and cone splitter are inserted every 60
Future Battery Minerals Ltd
info@futurebatteryminerals.com.au
Suite 10, 38 Colin St, West Perth WA 6005
+61 8 6383 7817
ABN 91 148 966 545
futurebatteryminerals.com.au
ASX: FBM
Follow Us
10
CRITERIA
EXPLANATION
COMMENTARY
samples
● Rock Chip samples and RC pulps for
Lithium Investigation have been fused with
Na2O2 and digested in hydrochloric acid,
the solution is analysed by ICP by Nagrom
Mineral Processors ICP004&ICP005 &
ALS Minerals Laboratories ME-MS81 ICPAES, ME-MS91. The method is
considered a whole rock analysis.
● A stoichiometric conversion of Li to Li2O is
applied consisting of a factor 2.153.
X-Ray Difraction
● Semi Quantitative X-Ray Difraction was
caried out on rock chip samples by ALS
Laboratories.
● The analysis provides both a qualitative
assessment of the mineralogy and a
quantitative result.
Raman Spectrometer
•
Bruker Raman Spectrometer was utilised
on all pegmatite RC chip samples from
with returned laboratory assays.
•
Raman spectroscopy is a spectroscopic
tool that enables rapid raw material
identification. With the aid of custom-built
reference libraries, it can be used to verify
or identify unknown materials in a matter
of minutes. It is a non-destructive
technique that requires limited to no
sample preparation in order to perform
analysis.
•
Qualitative mineralogical identification
•
Laser excitation wavelength 700-100nm
Verification of
sampling and
assaying
●
●
●
●
Location of data
points
●
●
●
Data spacing and
distribution
●
●
The verification of significant intersections
by either independent or alternative
company personnel.
The use of twinned holes.
Documentation of primary data, data entry
procedures, data verification, data storage
(physical and electronic) protocols.
Discuss any adjustment to assay data.
FBM:
•
No third-party verification has been
completed to date
•
Drill holes have not been twinned
•
All primary paper data is held on site,
digitised data is held in a managed
database off site.
•
No adjustments to assays have occurred.
Accuracy and quality of surveys used to
locate drill holes (collar and down-hole
surveys), trenches, mine workings and
other locations used in Mineral Resource
estimation.
Specification of the grid system used.
Quality and adequacy of topographic
control.
FBM:
•
Drill collars were surveyed in GDA94/MGA
Zone 51 datum by handheld GPS +-5m
accuracy
•
At completion of programme drill collars will
be surveyed using a Differential GPS +0.1m accuracy.
•
Rock Chip samples are recoded with
handheld GPS.
Data spacing for reporting of Exploration
Results.
Whether the data spacing and distribution
FBM:
•
Drill data spacing is sufficient to establish
the degree of geological and grade
Future Battery Minerals Ltd
info@futurebatteryminerals.com.au
Suite 10, 38 Colin St, West Perth WA 6005
+61 8 6383 7817
ABN 91 148 966 545
futurebatteryminerals.com.au
ASX: FBM
Follow Us
11
CRITERIA
Orientation of
data in relation to
geological
structure
Sample security
Audits or reviews
EXPLANATION
is sufficient to establish the degree of
geological and grade continuity
appropriate for the Mineral Resource and
Ore Reserve estimation procedure(s) and
classifications applied.
● Whether sample compositing has been
applied.
● Whether the orientation of sampling
achieves unbiased sampling of possible
structures and the extent to which this is
known, considering the deposit type.
● If the relationship between the drilling
orientation and the orientation of key
mineralised structures is considered to
have introduced a sampling bias, this
should be assessed and reported if
material.
●
The measures taken to ensure sample
security.
●
The results of any audits or reviews of
sampling techniques and data.
Section 2: Reporting of Exploration Results
CRITERIA
Mineral tenement
and land tenure
status
Exploration done
by other parties
Geology
EXPLANATION
● Type, reference name/number, location
and ownership including agreements or
material issues with third parties such as
joint ventures, partnerships, overriding
royalties, native title interests, historical
sites, wilderness or national park and
environmental settings.
● The security of the tenure held at the time
of reporting along with any known
impediments to obtaining a licence to
operate in the area.
●
Acknowledgment and appraisal of
exploration by other parties.
●
Deposit type, geological setting and style
of mineralisation.
COMMENTARY
continuity appropriate for this stage of
exploration and understanding of
mineralisation
FBM:
•
Drill holes azimuth is perpendicular to
stratigraphic strike
•
Drill hole dip is regarded suitable for
subvertical stratigraphy and provides a
near too true width intersection to
minimise orientation bias.
● The geometry of drill holes relative to the
mineralised zones achieves unbiased
sampling of this deposit type.
● No orientation-based sampling bias has
been identified.
FBM:
•
Drill samples are collected in labelled
polyweave bags and closed with tight zip
ties.
•
Samples are transported within 1-2days
of hole completion by field staff directly to
ALS laboratories.
● No independent audit or review has been
undertaken.
COMMENTARY
● The Kangaroo Hill Lithium Project
consists of 8 prospecting leases.
● P15/5740, P15/5741, P15/5742,
P15/5743, P15/5749, P15/5750,
P15/5963, P15/5965, M15/1887 (in
application), P15/6681 (in application),
P15/6813 (in application)
● All leases are held by Eastern
Coolgardie Goldfields Pty Ltd (ECG), a
subsidiary of Future Battery Minerals
Ltd
● No known royalties exist on the leases.
● There are no material issues with
regard to access.
● The tenement is in good standing and
no known impediments exist.
● Exploration drilling has been conducted
by the previous lease holders, Metals
Exploration
Share your feedback