Quarterly Activities/Appendix 5B Cash Flow Report
Released
Released
Announcement PDF
31 January 2024
QUARTERLY ACTIVITIES REPORT
For the period ending 31 December 2023
Future Battery Minerals Ltd (ASX: FBM) (FBM or the Company), is pleased to provide the following report on
its activities during the December 2023 quarter (Quarter). The Company’s primary focus during the Quarter
was progressing exploration activities at its Kangaroo Hills Lithium Project (KHLP) (100%) in Western Australia
and Nevada Lithium Project (NLP) (80%) in Nevada, USA.
HIGHLIGHTS
Kangaroo Hills Lithium Project (KHLP), WA (100%)
•
Expanded Phase 3 reverse circulation (RC) and diamond drilling (DD) program progressed during the
Quarter, focusing on infilling the Big Red Prospect (Big Red), drill testing of the previously identified
pegmatites at the Rocky Prospect (Rocky) semi-parallel to Big Red, and testing of regional targets 1.
•
First batch of Phase 3 assays (41 holes) returned in mid-October 2023 confirmed extensive near-surface
lithium pegmatite swarm at the Big Red and Rocky prospects, plus numerous further exceptional intercepts
of visual spodumene-bearing pegmatite drilled at Rocky 2.
•
Second batch of assays (53 holes) returned in mid-November 2023 broadening extent of shallow
mineralised system at KHLP 3.
•
Remaining Phase 3 drilling assays for residual 15 holes were reported in the March Quarter 2024.
•
Optimised resistivity survey results extend prospective target area to the north of the currently defined Big
Red mineralised zone by up to 2.2km north-south 4.
•
Identification of three new resistivity targets: Whiptail, Big Red West and Big Red North.
•
Western Grey and Quokka targets enlarged and refined, which are both coincident with mapped
pegmatites.
•
Drilling of key northern target areas (including Big Red extension) is planned to commence during Q1
2024, following receipt of permitting for these activities.
Nevada Lithium Project (NLP), USA (80%)
•
Phase 3 drilling program commenced at NLP, targeting Lithium (Li) clay mineralisation at Lone Mountain 5.
•
Phase 3 DD completed, with all three (3) holes returning thick intervals and successfully extending host
stratigraphy and high-grade mineralisation at depth 6,7.
•
Phase 3 RC drilling completed post quarter end, with six (6) holes targeting the Lone Mountain prospect,
testing its strike extension to the south.
•
Declaration of a maiden Mineral Resource Estimate for NLP remains on schedule for delivery in Q1 2024.
1
Refer to ASX Announcement dated 12 September 2023 – Further Spodumene Bearing Pegmatites Intercepted at Kangaroo Hills
Refer to ASX Announcement dated 17 October 2023 - Kangaroo Hills High-Grade Lithium System Continues to Grow
Refer to ASX Announcement dated 16 November 2023 – Further Shallow, High-Grade Lithium Intercepts at Kangaroo Hills
4
Refer to ASX Announcement dated 18 December 2023 – Further Resistivity Results Deliver New Targets at KHLP
5
Refer to ASX Announcement dated 3 October 2023 – Resource Drilling Underway at Nevada Lithium Project
6
Refer to ASX Announcement dated 8 December 2023 – RC Resource Drilling Commences at Nevada Lithium Project
7
Refer to ASX Announcement dated 22 January 2024 – High Grade Intervals Confirm Significant Extension of NLP
2
3
Future Battery Minerals Ltd
info@futurebatteryminerals.com.au
Suite 10, 38 Colin St, West Perth WA 6005
+61 8 6383 7817
ABN 91 148 966 545
futurebatteryminerals.com.au
ASX:FBM
Follow Us
1
Corporate
•
Commencement of Mr Nicholas Rathjen as CEO and Managing Director, with Mr Mike Edwards
transitioning to the role of Non-Executive Chairman 8.
•
Appointment of Mr Neville Power as Non-Executive Director. Resignation of Mr Paul Brown and retirement
of Mr Trevor Eton as Non-Executive Directors 9.
•
Second tranche of placement funds ($2.4 million) received, following receipt of shareholder approval at
the Company’s 2023 Annual General Meeting (AGM) held on 22 November 2023, including Director
participation totalling $225,000 10.
•
Cash balance at 31 December 2023 of $2.95 million and zero debt (excluding typical trade creditors).
March 2024 Quarter Planned Activity
Upcoming work programs and expected results for FBM include:
KHLP
•
Phase 4 drilling program – permitting advancing, with drilling commencement targeted for Q1 2024.
•
Drilling of key new northern resistivity target areas and northern extension of Big Red.
NLP
•
Mineral Resource Estimate definition drilling – completed early January 2024.
•
Declaration of maiden Mineral Resource Estimate – scheduled for Q1 2024.
FBM Managing Director, Nicholas Rathjen, commented:
“The December 2023 Quarter was another highly productive one for FBM. Drilling activities at both Kangaroo
Hills and in Nevada continued at pace, as we further expanded the scale and potential of the lithium mineral
systems found at both these assets. This work has also established the strong foundations for our forward
exploration agenda through 2024 and beyond.
“At Kangaroo Hills, we are excited about the planned upcoming testing of Big Red northern strike continuity.
The shallow, thick, high-grade lithium mineralisation at Big Red remains wide open to the north and is
coincident with a significant resistivity anomaly (Big Red Extension). It will be the immediate focus of Phase 4
drilling upon expected receipt of final environmental permitting during Q1 2024.
“In addition, the Phase 4 KHLP program is set to test a series of high-potential resistivity anomaly targets in
this northern area. These targets were sharpened with the optimised resistivity survey work completed last
year and we look forward to scout drilling of each of these significant discrete exploration opportunities.
“The current quarter is also expected to see conclusion of preliminary metallurgical testwork results for
Kangaroo Hills, inclusive of both HLS and flotation testing workstreams. This is a key input into potential future
mining and processing scenarios for the lithium mineralisation at the KHLP.
“At Nevada, Phase 3 diamond drilling has extended the high-grade mineralisation at depth at Lone Mountain.
The Phase 3 RC program, completed post quarter end, was designed to test the southern strike extent of Lone
Mountain and we eagerly await return of those assays. Incorporation of all Phase 3 results is then expected to
enable declaration of a maiden Mineral Resource Estimate for our Nevada Lithium Project during the current
quarter. This is a significant milestone for the NLP, which is located within a highly active lithium mining and
exploration province.”
8
Refer to ASX Announcement dated 18 October 2023 – Non-Executive Chairman
Refer to ASX Announcements dated 11 October 2023 “Resignation of Non-Executive Director”, 20 October 2023 “Retirement of Non-Executive Director”
and 20 November 2023 “Nev Power Joins as Non-Executive Director”
10
Refer to ASX Announcement dated 28 November 2023 – Completion of Tranche 2 Placement and Cleansing Notice
9
Future Battery Minerals Ltd
info@futurebatteryminerals.com.au
Suite 10, 38 Colin St, West Perth WA 6005
+61 8 6383 7817
ABN 91 148 966 545
futurebatteryminerals.com.au
ASX: FBM
Follow Us
2
Lithium Projects – Western Australia
Kangaroo Hills Lithium Project (KHLP) (100%)
During the Quarter, FBM continued to rapidly advance exploration activities across the KHLP, predominantly
through the continuation and completion of the Phase 3 drilling program.
Phase 3 drilling
FBM commenced the Phase 3 drilling program at the KHLP during the September 2023 quarter, which initially
consisted of 5,000m of RC infilling at Big Red and testing of the regional targets at Rocky, Eastern Grey,
Wallaroo and Pademelon. Due to early successes from the RC drilling at Rocky, the program was increased
by a further 6,000m in late August 2023. This expansion aims to further develop Rocky as well as additional
regional target testing.
The initial target generative work successfully identified the targets, Rocky and Eastern Grey, which both host
confirmed pegmatites. The presence of a lithium-bearing pegmatite at Rocky was confirmed through the
proximal result of 5m @ 1.12% Li2O from 104m in KHRC0037.
The initial holes completed at Rocky intercepted multiple new pegmatites with close proximity to Big Red,
which were interpreted as part of a larger stacked system and continues to remain open in all directions.
Figure 1: KHLP – Big Red and Rocky Pegmatite System – All drill holes graded by maximum down hole assay.
Future Battery Minerals Ltd
info@futurebatteryminerals.com.au
Suite 10, 38 Colin St, West Perth WA 6005
+61 8 6383 7817
ABN 91 148 966 545
futurebatteryminerals.com.au
ASX: FBM
Follow Us
3
Figure 2: KHLP - RC Drilling Rig at the Rocky Prospect
As Phase 3 drilling continued to progress throughout the Quarter, FBM received two batches of assay results.
In October 2023, the Company announced the receipt of results from an initial 41 RC and DD holes. These
holes were focussed on testing the continuity of Big Red, conducting grid drilling of the Rocky Prospect, and
undertaking wide-spaced scout drilling of select regional targets including Pademelon, Eastern Grey, and
Wallaroo.
Subsequently, in November 2023 the Company announced a second batch of assay results from a further 53
RC and DD holes. These holes were predominantly focussed on grid drilling of the Rocky Prospect and
conducting wide-spaced scout drilling of selected regional targets.
Key results from these two batches of assay results for Big Red and Rocky are summarised below.
Big Red Prospect
Key drill intercepts returned from the limited Big Red holes in the first batch of assays included:
•
22m @ 1.24% Li2O from 23m (KHDD006)2
The result in hole KHDD006 is particularly significant in confirming the relative consistency of the Big Red
system in that area with respect to thickness and grade.
Three holes targeting east-west extensions of Big Red were amongst the second batch of assays. These
results successfully further expanded Big Red and deliver additional confidence in the modelling of the
pegmatite. Step-out drilling was undertaken to the east of Big Red during the quarter. The results of this drilling
are expected in the next batch of assays from Phase 3 drilling, which are anticipated to be returned in Q1
2024.
Rocky Prospect
Assay results returned from the first batch of Phase 3 holes drilled at Rocky confirmed visual observations with
significant intercepts (refer Figure 1 and Figure 3) including2:
•
8m @ 1.08% Li2O from 40m (KHRC057);
•
6m @ 1.03% Li2O from 60m (KHRC089); and
Future Battery Minerals Ltd
info@futurebatteryminerals.com.au
Suite 10, 38 Colin St, West Perth WA 6005
+61 8 6383 7817
ABN 91 148 966 545
futurebatteryminerals.com.au
ASX: FBM
Follow Us
4
•
9m @ 0.80% Li2O from 147m (KHRC043).
The initial interpretation of Rocky was of a stacked system (with spodumene mineralisation identified in
numerous intercepts), with recent results suggesting the geometry of the Rocky pegmatite was north-east
striking/plunging and north-west dipping. With assay results from KHRC043 and KHRC044D, the plunge was
confirmed below the Big Red pegmatite.
Follow-up assay results again confirmed visual observations with numerous shallow high-grade intercepts
including3:
•
4m @ 1.34% Li2O from 9m (Big Red) and 4m @ 1.01% Li2O from 146m (Rocky) (KHDD009);
•
8m @ 0.83% Li2O from 127m, including 2m @ 1.24% Li2O from 127m (KHDD012);
•
6m @ 0.76% Li2O from 4m, including 1m @ 1.29% Li2O from 5m (KHRC093);
•
3m @ 0.93% Li2O from 7m, including 1m @ 1.85% Li2O from 8m, and 1m @ 1.42% Li2O from 14m
(KHRC094);
•
2m @ 1.27% Li2O from 23m and 4m @ 1.02% Li2O from 211m (KHRC095);
•
2m @ 1.09% Li2O from 35m (KHRC099);
•
2m @ 0.80% Li2O from 112m (KHRC111);
•
5m @ 1.28% Li2O from 24m (KHRC114); and
•
6m @ 0.66% Li2O from 3m, including 1m @ 1.35% Li2O from 4m (KHRC133).
These results significantly increased the scale of the Rocky mineralised system, which remains open along
strike to the north and at depth. The drilling conducted at Rocky to date has demonstrated a highly continuous
mineralised system at shallow depths, albeit thinner and of lower average grade than the standout
neighbouring Big Red pegmatite.
The proximity of Rocky to both surface and Big Red means that it is expected to form a significant part of any
future development at Kangaroo Hills. A DD tail program was initially planned to test for extensions of the
Rocky pegmatites at depth (including potential thickening). However, FBM elected to defer this program and
focus its exploration efforts on the next round of drilling activities targeting the northern strike extension of Big
Red/Rocky and other regional targets.
Figure 3: KHLP Long Section - Big Red and Rocky Pegmatite System
Future Battery Minerals Ltd
info@futurebatteryminerals.com.au
Suite 10, 38 Colin St, West Perth WA 6005
+61 8 6383 7817
ABN 91 148 966 545
futurebatteryminerals.com.au
ASX: FBM
Follow Us
5
Optimised resistivity survey results deliver new and refined northern targets
On 18 December 2023, FBM advised it had received the processed results from detailed resistivity surveying
undertaken between August and October 2023 across the northern part of the KHLP. This new resistivity
survey builds on previously reprocessed resistivity results from an IP survey completed by FBM in this area
during 2021 (when the Company was exploring for nickel sulphides in the region).
The new resistivity results extended the prospective target area to the north of the currently defined Big Red
mineralised zone by up to 2.2km north-south, with the addition of two connected prospective resistive
anomalies along strike identified as Big Red North. They also enlarged and refined the Western Grey and
Quokka targets, as well as identifying a further two targets to the west of Big Red, Big Red West and Whiptail.
The new resistivity survey results also highlighted lower order anomalies coincident with Rocky (a mineralised
pegmatite, but with thinner average pegmatites than Big Red) and Wallaroo (where drilling has intercepted
pegmatites, but with no significant mineralised intercepts to date). This provides further confidence in the
geophysical targeting method, as it supports previously drilled targets that intercepted pegmatite.
Selective petrophysical testing has also been undertaken on diamond core samples from the KHLP, to
determine the geophysical properties of the pegmatite versus the ultramafic and mafic (greenstone) rocks that
it has intruded. The results of this testing show a clear difference in resistivity, density and velocity between
the pegmatite and the greenstones. In general, the pegmatite samples have higher resistivity, and lower
density and seismic velocity than the greenstone samples. This demonstrates that where significant volumes
of pegmatite exist within the greenstone host with similar properties, that gravity, seismic and resistivity
methods may all be successful as exploration targeting tools.
Future Battery Minerals Ltd
info@futurebatteryminerals.com.au
Suite 10, 38 Colin St, West Perth WA 6005
+61 8 6383 7817
ABN 91 148 966 545
futurebatteryminerals.com.au
ASX: FBM
Follow Us
6
Figure 4: KHLP – Resistivity survey area and prospective anomalies
Metallurgical testwork
The preliminary metallurgical test work has been expanded to include additional sample analysis on discrete
HLS and flotation work stream utilising diamond drill core samples from the Big Red pegmatite. This work is
being undertaken by lead metallurgical and engineering consultant, Minsol Engineering. Full results of the
expanded test work program are expected to be received in late Q1 2024.
Upcoming Phase 4 program
Permitting for the KHLP Phase 4 drill program is advancing, with drilling targeted to commence in late Q1
2024. The Big Red system remains open to the north and at depth, with the Phase 4 program planned to
include RC drilling of Big Red Extension, plus scout testing of Quokka, Big Red West, Big Red North and
Western Grey. The program is also set to include further drilling of Big Red for ongoing metallurgical testwork
(DD) and Mineral Resource Estimate definition drilling (RC).
Future Battery Minerals Ltd
info@futurebatteryminerals.com.au
Suite 10, 38 Colin St, West Perth WA 6005
+61 8 6383 7817
ABN 91 148 966 545
futurebatteryminerals.com.au
ASX: FBM
Follow Us
7
Initial KHLP Mineral Resource Estimate
As a result of the unanticipated delays in finalising permitting for drilling of the northern target areas of the
KHLP (including the interpreted extension of Big Red), FBM has elected to defer the commissioning of its
maiden Mineral Resource Estimate for the KHLP until drilling results from these areas can be incorporated
into this exercise. As a result, delivery of the maiden KHLP Mineral Resource Estimate is now expected in Q4
2024.
Lithium Projects – Nevada, USA
Nevada Lithium Project (NLP) (80%)
Phase 3 drilling
FBM commenced the Phase 3 drilling program at the NLP in October 2023. The program comprised both DD
and RC drilling, with results to be included in the delivery of the maiden Mineral Resource Estimate at the NLP,
scheduled for Q1 2024.
Figure 5: Lone Mountain Lithium Project location map including neighbouring reported resources.
Future Battery Minerals Ltd
info@futurebatteryminerals.com.au
Suite 10, 38 Colin St, West Perth WA 6005
+61 8 6383 7817
ABN 91 148 966 545
futurebatteryminerals.com.au
ASX: FBM
Follow Us
8
DD Program
Phase 3 DD at Lone Mountain was undertaken during the Quarter, which comprised three (3) holes for 1,121
metres drilled. These holes were aimed to extend, at depth, lithium mineralisation intercepted in the Phase 1
and 2 RC programs – including the objective of drilling through the Li-bearing claystone into the bedrock
sequence below the basin.
Figure 6: Lone Mountain cross section of drill holes WF23-015 and WF23-011
All three DD holes successfully twinned their existing RC hole and returned thick, high-grade intercepts –
greatly extending lithium claystone mineralisation in the sequence of host Siebert Formation (including to endof-hole in two of the three). Moreover, bedrock was not finally intercepted in any holes by target depth. This
demonstrates that the host Siebert Formation is much thicker than previously anticipated and highlights the
potential for continuity of mineralised thicknesses up-dip to the south (the subject of the recently completed
RC drilling).
Assay results from the Phase 3 DD also returned a positive grade differential compared to the previously
announced RC hole samples in two of the three twinned holes, owing to improved sample quality. Holes WF23011C and WF23-015C showed a 14% and 7% observed uplift, respectively7.
Significant intercepts from the Phase 3 DD assays include7:
•
226m @ 855 ppm Li from 140m (WF23-011C)
Including 66m @ 1,001 ppm Li from 216m
•
148m @ 795 ppm Li from 152m (WF23-009C)
Including 60m @ 918 ppm Li from 191m
•
180m @ 818 ppm Li from 40m (WF23-015C)
Including 51m @ 915 ppm Li from 53m; and
─ 23m @ 1,081 ppm Li from 182m.
Future Battery Minerals Ltd
info@futurebatteryminerals.com.au
Suite 10, 38 Colin St, West Perth WA 6005
+61 8 6383 7817
ABN 91 148 966 545
futurebatteryminerals.com.au
ASX: FBM
Follow Us
9
Additional deeper, lower-grade lithium claystone intervals were intercepted in WF23-015C, including7:
•
19.5m @ 501 ppm Li from 370m
•
13.5m @ 518 ppm Li from 401m
•
19.5m @ 370 ppm Li from 429m
These intervals are currently interpreted to continue south, however recent drilling has specifically targeted
potential shallowing of the high-grade seams.
Figure 7: NLP – Diamond Drill hole locations
Future Battery Minerals Ltd
info@futurebatteryminerals.com.au
Suite 10, 38 Colin St, West Perth WA 6005
+61 8 6383 7817
ABN 91 148 966 545
futurebatteryminerals.com.au
ASX: FBM
Follow Us
10
RC Program
RC drilling commenced at the NLP in December 2023, designed predominantly to test the southern strike
extent of the shallow Lone Mountain deposit. The host formation of the lithium claystone mineralisation at Lone
Mountain, the Siebert Formation, is interpreted to become progressively shallower moving south from the
known mineralisation for a further 2km, where it is then observed to outcrop in various places.
Subsequent to the end of the Quarter, Phase 3 RC drilling was completed with a total of six holes for 1,177m.
All six holes intercepted the host Siebert Formation, including LM23-002 intercepting it from surface. All RC
samples have been submitted to the laboratory, with assay results expected to be returned in Q1 2024.
Maiden NLP Mineral Resource Estimate
Stantec Consulting (Stantec) has been appointed to undertake the maiden Mineral Resource Estimate for the
NLP. Stantec has relevant expertise and substantial experience in the specific lithium claystone mineralisation
found at the NLP. Declaration of the Mineral Resource Estimate remains on track for Q1 2024.
Regional Targets
Post the release of a Mineral Resource Estimate at Lone Mountain, the NLP still hosts significant exploration
upside. Regional prospects – Traction, San Antone West and North – remain untested and are located within
the same lacustrine and caldera settings which host Lone Mountain lithium claystone and neighbouring
deposits, Tonopah Flats and TLC. Soil sampling conducted at the time of acquisition highlighted numerous Li
anomalies up to 500ppm on the claim groups which remain untested. Importantly historic water well data and
recent mapping have confirmed the presence of the lithium host Siebert Formation. This illustrates that
remaining regional prospects have strong potential to host further Li claystone.
FBM will look to schedule exploration of these exciting regional prospects during 2024 with the aim of further
organically building the Company’s mineral footprint in Nevada.
Nickel Projects – Western Australia
Saints Nickel Project (Saints), (100%), Leinster Nickel Project (Leinster) (100%)
There was no significant work completed at the Saints or Leinster Nickel Project during the Quarter.
Corporate
Cashflows for the quarter
Attached to this report is the Appendix 5B containing Company’s cashflow statement for the December 2023
quarter. The cash outflows for the Quarter included $3.64 million incurred on exploration and evaluation
expenditure, which was primarily associated with the drilling programs at KHLP and NLP. There were $326,000
of administration and corporate costs paid during the quarter, and as disclosed on section 6 of Appendix 5B,
$247,000 payments were made to related parties, including approximately $149,000 relating to Directors and
their associates pursuant to existing director fee agreements for Executive and Non-Executive Directors, and
approximately $98,000 relating to a labour hire agreement with Zephyr Professional Pty Ltd, a related party of
Mr Robin Cox. All related party transactions have been entered into on an arm’s length basis.
As at 31 December 2023, the Company had available cash of approximately $2.95 million and zero debt
(excluding typical trade creditors).
Future Battery Minerals Ltd
info@futurebatteryminerals.com.au
Suite 10, 38 Colin St, West Perth WA 6005
+61 8 6383 7817
ABN 91 148 966 545
futurebatteryminerals.com.au
ASX: FBM
Follow Us
11
Board and Management Evolution
With the commencement of Mr. Nick Rathjen as Managing Director and CEO on 18 October 2023, FBM
announced that Mr. Mike Edwards had stepped down from his executive duties and assumed the role of NonExecutive Chairman.
On 11 October 2023, FBM advised that Mr Paul Brown had resigned as a Non-Executive Director due to his
executive duties with Hastings Technology Metals (ASX:HAS). FBM also advised on 20 October 2023 that Mr
Trevor Eton would not be seeking re-election at the Company’s 2023 AGM, with Trevor retiring as a NonExecutive Director at the conclusion of the AGM.
On 20 November 2023, FBM advised that Mr Neville (Nev) Power had been appointed to the role of NonExecutive Director. With more than four decades of experience across mining, minerals processing,
construction and steel making, Nev has accumulated a wide range of expertise across multiple sectors of the
global business landscape.
From 2011 to 2018, Nev was Managing Director and Chief Executive Officer of Fortescue Metals Group
(ASX:FMG), one of the world’s largest and lowest cost producers of iron ore. During his tenure, Fortescue
more than quadrupled its production to over 170 million tonnes per annum and positioned itself as the lowest
cost supplier of seaborne iron ore to China. Before joining Fortescue, Nev held Chief Executive positions at
Thiess and the Smorgon Steel Group.
At the end of December 2023, Mr Matthew Worner resigned as Joint Company Secretary of the Company.
Second placement tranche completed
During the September 2023 quarter, the Company received firm commitments from institutional and
sophisticated investors to raise $7.6 million (before costs) under a placement of fully paid ordinary shares over
two tranches at an issue price of $0.10 per share.
Tranche 1 of the placement was completed on 21 September 2023 with funds received totalling $5.2 million.
On 28 November 2023, Tranche 2 of the placement ($2.4 million) was completed, following the receipt of
shareholder approval at the Company’s 2023 AGM held on 22 November 2023, alongside the approval
for Directors’ participation of $225,000 in the placement.
Capital Structure
Securities on Issue as at 31 December 2023:
•
533,755,986 fully paid ordinary shares (quoted)
•
3,000,000 options exercisable at $0.15 on or before 28/11/2026
•
2,000,000 options exercisable at $0.11 on or before 03/02/2028
•
3,000,000 broker options exercisable at $0.072 on or before 22/02/2025
•
1,250,000 options exercisable at $0.50 on or before 10/08/2026
•
71,030,429 Performance Rights (various classes)
Future Battery Minerals Ltd
info@futurebatteryminerals.com.au
Suite 10, 38 Colin St, West Perth WA 6005
+61 8 6383 7817
ABN 91 148 966 545
futurebatteryminerals.com.au
ASX: FBM
Follow Us
12
December 2023 Quarter – ASX Announcements
This Quarterly Activities Report contains information extracted from ASX market announcements reported in
accordance with the 2012 edition of the “Australasian Code for Reporting of Exploration Results, Mineral
Resources and Ore Reserves” (2012 JORC Code). Further details (including 2012 JORC Code reporting
tables where applicable) of exploration results referred to in this Quarterly Activities Report can be found in the
following announcements lodged on the Company’s ASX platform:
18 Dec 2023
Further Resistivity Results Deliver New Targets at Kangaroo Hills
08 Dec 2023
RC Resource Drilling Commences at Nevada Lithium Project
28 Nov 2023
Completion of Tranche 2 Placement and Cleansing Notice
20 Nov 2023
Nev Power Joins as Non-Executive Director
16 Nov 2023
Further Shallow, High-Grade Lithium Intercepts at Kangaroo Hills
20 Oct 2023
Non-Executive Director Retirement
18 Oct 2023
Non-Executive Chairman
17 Oct 2023
Kangaroo Hills High-Grade Lithium System Continues to Grow
11 Oct 2023
Resignation of Non-Executive Director
03 Oct 2023
Resource Drilling Underway at Nevada Lithium Project
These announcements are available for viewing on the Company’s website futurebatteryminerals.com.au/
under the Investors tab. Future Battery Minerals confirms that it is not aware of any new information or data
that materially affects the information included in any original ASX announcement.
This announcement has been authorised for release by the Board of Directors of Future Battery Minerals.
For further information please visit futurebatteryminerals.com.au/ or contact:
Nicholas Rathjen
CEO & Managing Director
E: nrathjen@futurebatteryminerals.com.au
T: +61 (08) 6383 7817
Robin Cox
Technical Director
E: rcox@futurebatteryminerals.com.au
T: +61 (08) 6383 7817
Future Battery Minerals Ltd
info@futurebatteryminerals.com.au
Suite 10, 38 Colin St, West Perth WA 6005
+61 8 6383 7817
ABN 91 148 966 545
futurebatteryminerals.com.au
ASX: FBM
Follow Us
13
Competent Persons Statement
The information in this report that relates to Exploration Results is based on and fairly represents information compiled by
Mr Robin Cox BSc (E.Geol), a Competent Person, who is a Member of the Australian Institute of Mining and Metallurgy.
Mr Cox is the Company’s Chief Geologist and has sufficient experience that is relevant to the style of mineralisation and
type of deposit under consideration and to the activity being undertaken to qualify as a Competent Person as defined in
the 2012 Edition of the Australasian Code for Reporting of Exploration Results, Mineral Resources and Ore Reserves. Mr
Cox consents to the inclusion in the announcement of the matters based on his information in the form and context in
which it appears.
The information in this release that relates to Mineral Resources is based on information compiled by Mr Shaun Searle
who is a Member of the Australasian Institute of Geoscientists. Mr Searle is an employee of Ashmore Advisory Pty Ltd and
independent consultant to Future Battery Minerals Limited. Mr Searle has sufficient experience, which is relevant to the
style of mineralisation and type of deposit under consideration and to the activity which he has undertaken to qualify as a
Competent Person as defined in the 2012 Edition of the ‘Australasian Code for the Reporting of Exploration Results,
Mineral Resources and Ore Reserves’. Mr Searle consents to the inclusion in this report of the matters based on this
information in the form and context in which it appears.
Forward-Looking Statements
This document may include forward-looking statements. Forward-looking statements include, but are not limited to,
statements concerning Future Battery Minerals Limited’s planned exploration program and other statements that are not
historical facts.
Share your feedback
Discover