Highlights
Assays returned from wide-spaced extensional soil sampling program completed at Miriam.
Expanded 750m-long lithium anomaly identified, extending previously identified anomaly by
circa 450m.
A further four new anomalous lithium zones identified, overlapping and coincident with
established geophysical targets.
Preparations underway for initial Miriam drill program in H1 2025, with Program of Works
(PoW) submitted and Reverse Circulation (RC) hole planning in progress.
Low-cost ground gravity surveys to commence during current quarter, further de-risking drill
hole targeting.
FBM is well-funded to pursue future exploration programs and growth opportunities across
its highly prospective project portfolio (A$4.7M cash and zero debt at 30 September 2024 1).
0F
Future Battery Minerals Ltd (ASX: FBM) (FBM or the Company) advises of the receipt of assay results for the
recent soil sampling program at its Miriam Lithium Project (Miriam) in the Western Australian Goldfields region.
The Kangaroo Hills and Miriam areas have attractive near-surface, shallow dipping, thick, spodumene bearing
lithium pegmatites. The projects continue to hold significant upside potential for new discoveries and resource
growth, located in one of the premier mining regions in the world and proximal to existing infrastructure
including the operating hard rock lithium mine, Mount Marion.
FBM Managing Director and CEO, Nick Rathjen, commented:
“Our recent wide-spaced extensional soil sampling program at Miriam is an example of cost-effective
exploration, allowing us to both systematically assess the potential of this tenure and concurrently expand the
number of priority targets for drill testing. The geochemistry in combination with geophysics, enhances the
definition of our search area for valuable shallow subsurface mineralised pegmatites. Importantly, these
targets, point to the regional scale potential for new discoveries in addition to the significant lithium we have at
the Kangaroo Hills Project.
“The results from this program, which covered the mid-section of our Miriam tenure, are extremely
encouraging. The substantial extension of one existing soil anomaly, coupled with the identification of four new
nearby targets demonstrating robust Li anomalism, is a strong outcome. It is also important to note that these
newly identified areas of lithium soil anomalism overlap with our recently generated geophysical targets,
providing layers to the targets and further enhancing the overall attractiveness of these areas for prompt drill
testing.”
“We continue to advance Miriam in a disciplined and pragmatic manner, with anticipation building in the lead
up to our initial RC drill program in H1 2025. With a healthy cash balance to fund future work programs, we
continue to exercise a systematic but energetic approach to exploration of this exciting tenure.”
1
Refer to ASX Announcement dated 23 October 2024 – “Quarterly Activities/Appendix 5B Cash Flow Report”
Future Battery Minerals Ltd
info@futurebatteryminerals.com.au
Suite 10, 38 Colin St, West Perth WA 6005
+61 8 6383 7817
ABN 91 148 966 545
futurebatteryminerals.com.au
ASX: FBM
Follow Us
1
Extensional soil sampling program delivers suite of new high-potential targets
Soil sampling is considered a low cost and fast method of defining broad geochemical anomalies for immediate
drill testing or further target refinement. Soil sampling is particularly effective in terrains such as the
neighbouring Kangaroo Hills Lithium Project and Miriam, where substantial in-situ regolith and little-to-no
transported alluvium produce more reliable surface geochemical datasets.
Figure 1: Location map of Kangaroo Hills and Miriam Lithium Projects
Future Battery Minerals Ltd
info@futurebatteryminerals.com.au
Suite 10, 38 Colin St, West Perth WA 6005
+61 8 6383 7817
ABN 91 148 966 545
futurebatteryminerals.com.au
ASX: FBM
Follow Us
2
Previous soil sampling activities at Miriam were limited to only 2.6 km (north-south) of the tenure’s
approximately 6 km extent. The wide-spaced extensional soil sampling program undertaken in
September and October 2024 was designed to test for potential blind, subsurface pegmatites,
extending further north into the tenure (refer Figures 1 and 2). It expanded the soil sampling grid at
Miriam a minimum of approximately 700m further north and up to 2.3 km further north in the northwestern area, all within areas now covered by heritage surveys. The soils program follows the recent
target-generative magnetic litho-structural geophysical review of Miriam, which identified 13 discrete structural
targets that may serve as potential conduits or host structures for LCT pegmatites.
The extensional soils program was completed on a 40m sample spacing by 100m line spacing grid, resulting
in the retrieval of over 400 samples. The program followed on from the previous soil program conducted by
Corazon Mining Ltd (CZN or Corazon) 2 in 2023, which only tested the southern portion of Miriam, where
outcropping spodumene pegmatites were present. As a result, the northern half of the Miriam tenure
remains largely untested using modern LCT pegmatite exploration methods. Accordingly, FBM is
utilising both geophysics and surface geochemistry across these areas for initial target generation
and ranking for future drill testing.
1F
The prior soil program undertaken by Corazon identified a 1.6 km north-south striking lithium soil anomaly that
coincided with the mapped outcropping spodumene pegmatites and numerous geophysical targets. While
sampling had only tested the southern end of the tenure, it was identified that a building lithium anomaly was
present on the final northern-most lines of the survey.
Assays from the recent soils program have identified a 750m north-south anomaly (an approximate
450m extension) that coincides with geophysical structural targets. The assay results also reveal four
other areas of robust Li anomalism across the sampled area (refer Figure 2). Pleasingly, these areas
also overlap with established geophysical targets.
2
Refer to Corazon Mining (CZN) ASX Announcement dated 29th March 2023; Miriam Lithium Soil Results
Future Battery Minerals Ltd
info@futurebatteryminerals.com.au
Suite 10, 38 Colin St, West Perth WA 6005
+61 8 6383 7817
ABN 91 148 966 545
futurebatteryminerals.com.au
ASX: FBM
Follow Us
3
Figure 2: Key results from wide-spaced extensional soil sampling program at Miriam
Ground gravity program set to commence and first drilling in H1 2025
FBM has scheduled ground gravity geophysical surveys to commence at Miriam over the coming
month. These surveys will test for relative density changes within the subsurface rocks, which may potentially
represent changes in lithology from greenstone mafics to pegmatites, and will also collaborate the structural
interpretation. This low-cost survey work can greatly improve drill hole targeting, particularly regarding planned
drill hole depth and direction, further de-risking initial exploration drilling activities.
Future Battery Minerals Ltd
info@futurebatteryminerals.com.au
Suite 10, 38 Colin St, West Perth WA 6005
+61 8 6383 7817
ABN 91 148 966 545
futurebatteryminerals.com.au
ASX: FBM
Follow Us
4
Preparations are also underway for FBM’s initial drill program at Miriam, scheduled for H1 2025. The
PoW for drilling approval has been submitted, and initial drill hole locations are being finalised.
The initial drilling is set to target the +1.5km soil anomaly at the southern end of the Miriam tenure, which
correlates with both spodumene outcrops and key geophysical targets. An initial program of RC drilling is being
designed to test this high-priority target, providing key information on the thickness and orientation of the
mineralised system, and paving the way for targeted follow-up programs to accurately delineate the expanding
system.
This announcement has been authorised for release by the Board of Directors of the Company.
-ENDFor further information visit www.futurebatteryminerals.com or contact:
Nicholas Rathjen
Robin Cox
CEO & Managing Director
Technical Director
E: nrathjen@futurebatteryminerals.com.au
E: rcox@futurebatteryminerals.com.au
Future Battery Minerals Ltd
info@futurebatteryminerals.com.au
Suite 10, 38 Colin St, West Perth WA 6005
+61 8 6383 7817
ABN 91 148 966 545
futurebatteryminerals.com.au
ASX: FBM
Follow Us
5
Competent Persons Statement
The information in this announcement that relates to exploration results is based on and fairly represents information
compiled by Mr Robin Cox BSc (E.Geol), a Competent Person, who is a Member of the Australian Institute of Mining and
Metallurgy. Mr Cox is the Company’s Chief Geologist and has sufficient experience that is relevant to the style of
mineralisation and type of deposit under consideration and to the activity being undertaken to qualify as a Competent
Person as defined in the 2012 Edition of the Australasian Code for Reporting of Exploration Results, Mineral Resources
and Ore Reserves. Mr Cox consents to the inclusion in this announcement of the matters based on his information in the
form and context in which it appears.
Forward-Looking Statements
This document may include forward-looking statements. Forward-looking statements include, but are not limited to,
statements concerning Future Battery Minerals Limited’s planned exploration program and other statements that are not
historical facts. When used in this document, the words such as "could," "plan," "estimate," "expect," "intend," "may”,
"potential", "should," and similar expressions are forward-looking statements. Although Future Battery Minerals Limited
believes that its expectations reflected in these forward-looking statements are reasonable, such statements involve risks
and uncertainties and no assurance can be given that actual results will be consistent with these forward-looking
statements.
Previously Reported Results
The information in this announcement that relates to Exploration Results is extracted from the ASX announcements
(Original Announcements), as referenced, which are available at www.futurebatteryminerals.com.au. FBM confirms that it
is not aware of any new information or data that materially affects the information included in the Original Announcements
and, that all material assumptions and technical parameters underpinning the estimates in the Original Announcements
continue to apply and have not materially changed. FBM confirms that the form and context in which the Competent
Persons’ findings are presented have not been materially modified from the original announcement.
Future Battery Minerals Ltd
info@futurebatteryminerals.com.au
Suite 10, 38 Colin St, West Perth WA 6005
+61 8 6383 7817
ABN 91 148 966 545
futurebatteryminerals.com.au
ASX: FBM
Follow Us
6
About Future Battery Minerals (ASX: FBM)
Future Battery Minerals (ASX: FBM) is a future-facing minerals exploration and development company focused
on rapidly advancing its two new world-class lithium discoveries.
Our flagship asset is the 100%-owned Kangaroo Hills Lithium Project (KHLP). The KHLP is located in the
Goldfields of Western Australia, approximately 17km south of the major township of Coolgardie, and hosts the
exciting Big Red, Rocky and Potoroo hard rock lithium discoveries. Immediately north and contiguous to the
KHLP is the Miriam Project, the recent acquisition of which doubled our regional footprint. Miriam is located
immediately along strike from the KHLP and holds a large historic lithium soil anomaly extending from an
outcropping spodumene-rich pegmatite, providing a significant opportunity for future discovery success. These
project areas are being rapidly advanced in parallel by FBM’s experienced team, focusing on resource growth,
metallurgical testwork and development readiness.
The Goldfields are a lithium endowed province of Western Australia, with numerous operating and developing
Lithium projects. Notably, the KHLP is only 30km’s directly west and 45km’s via sealed road to the Mt Marrion
Lithium Mine operated by Mineral Resources Ltd (ASX: MIN). KHLP and Miriam are accessible via a sealed
road leading south from Coolgardie, ensuring the Company has continuous access all year-round.
Our other key portfolio asset is the Nevada Lithium Project (NLP). A large-scale, high-grade initial lithium
claystone Mineral Resource Estimate (MRE) was recently declared for the Lone Mountain deposit within the
NLP, with this MRE being delivered less than 12 months from discovery. The business is evaluating a range
of potential commercialisation routes for the NLP.
About Lithium
Lithium is a soft silvery-white metal which is highly reactive and does not occur in nature in its elemental form.
In nature it occurs as compounds within hard rock deposits, salt brines and claystone. Lithium and its chemical
compounds have a wide range of industrial applications resulting in numerous chemical and technical uses.
Lithium has the highest electrochemical potential of all metals, a key property in its role in lithium-ion batteries.
Future Battery Minerals Ltd
info@futurebatteryminerals.com.au
Suite 10, 38 Colin St, West Perth WA 6005
+61 8 6383 7817
ABN 91 148 966 545
futurebatteryminerals.com.au
ASX: FBM
Follow Us
7
JORC Code, 2012 Edition, Table 1
Section 1: Sampling Techniques and Data
CRITERIA
Sampling
techniques
EXPLANATION
COMMENTARY
Nature and quality of sampling (eg cut
channels, random chips, or specific
specialised industry standard
measurement tools appropriate to the
minerals under investigation, such as
down hole gamma sondes, or handheld
XRF instruments, etc). These examples
should not be taken as limiting the broad
meaning of sampling.
Include reference to measures taken to
ensure sample representivity and the
appropriate calibration of any
measurement tools or systems used.
Aspects of the determination of
mineralisation that are Material to the
Public Report. In cases where ‘industry
standard’ work has been done this would
be relatively simple (eg ‘reverse
circulation drilling was used to obtain 1m
samples from which 3kg was pulverised
to produce a 30g charge for fire assay’).
In other cases more explanation may be
required, such as where there is coarse
gold that has inherent sampling
problems. Unusual commodities or
mineralisation types (eg submarine
nodules) may warrant disclosure of
detailed information.
•
•
•
Soils Sampling was conducted on a
planned grid consisting of 40m sample
spacing and 100m line spacing which is
consistent with the previous sampling grid
conducted by Corazon Mining.
Samples were collected with hand tools,
removing the top 10-20cm of soil in order
to remove organic matter, before digging
a further 10cm of soil for sieving.
Approximately 200g of sieved soil was
collected at each site, utilising a –0.18mm
mesh.
A total of 405 samples were collected
•
•
•
•
Corazon Rock and Soil Sampling –
A total of 636 soil samples were collected
Soil sampling was conducted on a 100mx40m
grid.
Results of the Corazon soil programme were
announced by Corazon Mining on 29th of
March 2023
Results of the Corazon rock chips were
announced on the 17th of January 2023
Drilling
techniques
•
Drill type (eg core, reverse circulation,
open-hole hammer, rotary air blast,
auger, Bangka, sonic, etc) and details
(eg core diameter, triple or standard
tube, depth of diamond tails, facesampling bit or other type, whether core
is oriented and if so, by what method,
etc).
No Drilling results reported
Drill sample
recovery
•
Method of recording and assessing core
and chip sample recoveries and results
assessed.
Measures taken to maximise sample
recovery and ensure representative
nature of the samples.
Whether a relationship exists between
sample recovery and grade and
whether sample bias may have
occurred due to preferential loss/gain of
fine/coarse material.
Whether core and chip samples have
been geologically and geotechnically
logged to a level of detail to support
appropriate Mineral Resource
estimation, mining studies and
metallurgical studies.
Whether logging is qualitative or
quantitative in nature. Core (or costean,
channel, etc) photography.
No Drilling reported
•
•
Logging
•
•
No logging results reported
Future Battery Minerals Ltd
info@futurebatteryminerals.com.au
Suite 10, 38 Colin St, West Perth WA 6005
+61 8 6383 7817
ABN 91 148 966 545
futurebatteryminerals.com.au
ASX: FBM
Follow Us
8
Sub-sampling
techniques and
sample
preparation
•
The total length and percentage of the
relevant intersections logged.
•
If core, whether cut or sawn and
whether quarter, half or all core taken.
If non-core, whether riffled, tube
sampled, rotary split, etc and whether
sampled wet or dry.
For all sample types, the nature, quality
and appropriateness of the sample
preparation technique
Quality control procedures adopted for
all sub-sampling stages to maximise
representivity of samples.
Measures taken to ensure that the
sampling is representative of the in-situ
material collected, including for instance
results for field duplicate/second-half
sampling.
Whether sample sizes are appropriate
to the grain size of the material being
sampled.
The nature, quality and appropriateness
of the assaying and laboratory
procedures used and whether the
technique is considered partial or total.
For geophysical tools, spectrometers,
handheld XRF instruments, etc, the
parameters used in determining the
analysis including instrument make and
model, reading times, calibrations
factors applied and their derivation, etc.
Nature of quality control procedures
adopted (eg standards, blanks,
duplicates, external laboratory checks)
and whether acceptable levels of
accuracy (i.e. lack of bias) and precision
have been established.
•
•
•
•
•
Quality of assay
data and
laboratory tests
•
•
•
Verification of
sampling and
assaying
•
•
•
•
Location of data
points
•
•
•
Data spacing
and distribution
•
•
The verification of significant
intersections by either independent or
alternative company personnel.
The use of twinned holes.
Documentation of primary data, data
entry procedures, data verification, data
storage (physical and electronic)
protocols.
Discuss any adjustment to assay data.
Accuracy and quality of surveys used to
locate drill holes (collar and down-hole
surveys), trenches, mine workings and
other locations used in Mineral
Resource estimation.
Specification of the grid system used.
Quality and adequacy of topographic
control.
Data spacing for reporting of
Exploration Results.
Whether the data spacing and
distribution is sufficient to establish the
degree of geological and grade
continuity appropriate for the Mineral
Resource and Ore Reserve estimation
•
•
•
•
•
•
•
•
•
•
•
•
•
•
•
•
•
Soil was sieved using a –0.18mm nylon
mesh
Soil sampling is considered a sufficient
first pass geochemical assessment of the
ground where appropriate regolith exists.
Geochemical anomalies are relative to
the surrounding geochemistry
Sampling grids are designed to cover
large area’s in order to allow identification
of anomalous zones
200g samples are appropriate
Samples were submitted to ALS
laboratories
All samples were assayed for multi
element geochemistry utilising a 4 Acid
digest with mass spectrometry finish (MEMS61)
Duplicate samples are inserted at 1;25
ratio
No independent verification has been
conducted
Duplicate samples are inserted at 1:25
Field sample sheets are maintained
Field data is imported to the FBM
geochemistry database.
No adjustments are made to assay data
Samples are located utilising a hand held
GPS with a accuracy +/-5m. Which is
suitable for this form of sampling
Geospatial grid information is
represented in UTM MGA 94 Zone 51
Sample spacing was conducted on a
40mx100m grid
This data spacing is appropriate for
identifying continuous and noncontinuous geochemical anomalies
Future Battery Minerals Ltd
info@futurebatteryminerals.com.au
Suite 10, 38 Colin St, West Perth WA 6005
+61 8 6383 7817
ABN 91 148 966 545
futurebatteryminerals.com.au
ASX: FBM
Follow Us
9
•
Orientation of
data in relation
to geological
structure
•
Sample security
•
Audits or
reviews
•
•
procedure(s) and classifications
applied.
Whether sample compositing has been
applied.
Whether the orientation of sampling
achieves unbiased sampling of possible
structures and the extent to which this is
known, considering the deposit type.
If the relationship between the drilling
orientation and the orientation of key
mineralised structures is considered to
have introduced a sampling bias, this
should be assessed and reported if
material.
The measures taken to ensure sample
security.
The results of any audits or reviews of
sampling techniques and data.
Section 2: Reporting of Exploration Results
CRITERIA
Mineral tenement
and land tenure
status
EXPLANATION
•
•
Type, reference name/number, location
and ownership including agreements or
material issues with third parties such
as joint ventures, partnerships,
overriding royalties, native title
interests, historical sites, wilderness or
national park and environmental
settings.
The security of the tenure held at the
time of reporting along with any known
impediments to obtaining a licence to
operate in the area.
Sampling was conducted on a series of
east-west lines, spaced at 100m intervals
The east west lines run near
perpendicular to the underlying lithology
strike providing unbiased sampling
•
•
Samples are collected daily in the field by
company staff and contractors
•
Samples are delivered to ALS
laboratories – Kalgoorlie depot in marked
pollyweave bags at the end of each shift
or completion of significant area.
No independent audit or review has been
undertaken.
•
COMMENTARY
The Miriam Project consists of 5
prospecting leases.
• Granted leases are P15/6136,
P15/6137, P156138 and P15/6139.
P15/6135 remains in application
• Leases P15/6136-6139 are held by
Coolgardie Nickel Pty Ltd, now an
85% subsidiary of Future Battery
Minerals Ltd. P15/6135 is held by
Limelight Industries Pty Ltd until
time of grant
• A 2% NSR is held by Limelight
Industries Pty Ltd over all Miriam
tenure. FBM have exercised an
option to acquire the royalty.
• The tenements are located in the
Kangaroo Hills Timber Reserve, an
approved
Conservation
Management
Plan
provides
conditional access to the tenure.
• The tenements are in good standing
and no known impediments exist.
The Kangaroo Hill Lithium Project
consists of 8 prospecting leases.
• P15/5740, P15/5741, P15/5742,
P15/5743, P15/5749, P15/5750,
P15/5963, P15/5965, M15/1887 (in
application), M15/1905 (in
application), P15/6681 (in
application), P15/6813 (in
application)
• All leases are held by Eastern
Coolgardie Goldfields Pty Ltd
(ECG), a subsidiary of Future
Battery Minerals Ltd
• Tenements P15/5741, P15/5963
and P15/5965 overlap the
Future Battery Minerals Ltd
info@futurebatteryminerals.com.au
Suite 10, 38 Colin St, West Perth WA 6005
+61 8 6383 7817
ABN 91 148 966 545
futurebatteryminerals.com.au
ASX: FBM
Follow Us
10
Exploration done
by other parties
Acknowledgment and appraisal of
exploration by other parties.
Geology
Deposit type, geological setting and style of
mineralisation.
Kangaroo Hills Timber Reserve, a
C class multi-purpose reserve
• FBM operates under an approved
Conservation Management Plan
within the reserve.
• No known royalties exist on the
KHLP leases.
• There are no material issues with
regard to access.
• The tenements are in good
standing and no known
impediments exist.
Corazon Miriam Soil Sampling
•
Sampling conducted by Corazon
Mining Ltd (asx;CZN), announced to
asx on 29th of March 2023
•
Sampling conducted on a 40m x
100m grid sieving soil 10cm below
surface
•
All samples were assayed for multi
element geochemistry utilising a 4
Acid digest with mass spectrometry
finish (ME-MS61)
•
.
•
•
Drill hole
Information
•
•
•
•
•
•
•
Data aggregation
methods
•
A summary of all information material
to the understanding of the
exploration results including a
tabulation of the following information
for all Material drill holes:
easting and northing of the drill hole
collar
elevation or RL (Reduced Level –
elevation above sea level in metres)
of the drill hole collar
dip and azimuth of the hole
down hole length and interception
depth
hole length.
If the exclusion of this information is
justified on the basis that the
information is not Material and this
exclusion does not detract from the
understanding of the report, the
Competent Person should clearly
explain why this is the case.
In reporting Exploration Results,
weighting averaging techniques,
maximum and/or minimum grade
truncations (eg cutting of high grades)
and cut-off grades are usually
Material and should be stated.
The Miriam project is prospective for
Lithium, Caesium, Tantalum (LCT)
enriched pegmatites which intrudes
older Archean aged greenstone
lithologies.
The tenements are prospective for
lode and structurally hosted gold
mineralisation hosted within Archean
aged greenstone lithologies.
No drill holes are reported.
•
•
Soil results are grouped and
reported in the following ranges of Li
ppm; (0-10, 10-25, 25-40, 40-60, 6080, 80-Max)
Samples reporting >25ppm Li are
relatively anomalous for the area
Future Battery Minerals Ltd
info@futurebatteryminerals.com.au
Suite 10, 38 Colin St, West Perth WA 6005
+61 8 6383 7817
ABN 91 148 966 545
futurebatteryminerals.com.au
ASX: FBM
Follow Us
11
Where aggregate intercepts
incorporate short lengths of highgrade results and longer lengths of
low-grade results, the procedure used
for such aggregation should be stated
and some typical examples of such
aggregations should be shown in
detail.
•
The assumptions used for any
reporting of metal equivalent values
should be clearly stated.
•
These relationships are particularly
important in the reporting of Exploration
Results.
•
If the geometry of the mineralisation
with respect to the drill hole angle is
known, its nature should be reported.
•
If it is not known and only the down
hole lengths are reported, there should
be a clear statement to this effect (eg
‘down hole length, true width not
known’).
Appropriate maps and sections (with
scales) and tabulations of intercepts should
be included for any significant discovery
being reported These should include, but
not be limited to a plan view of drill hole
collar locations and appropriate sectional
views.
Where comprehensive reporting of all
Exploration Results is not practicable,
representative reporting of both low and
high grades and/or widths should be
practiced to avoid misleading reporting of
Exploration Results.
Other exploration data, if meaningful and
material, should be reported including (but
not limited to): geological observations;
geophysical survey results; geochemical
survey results; bulk samples – size and
method of treatment; metallurgical test
results; bulk density, groundwater,
geotechnical and rock characteristics;
potential deleterious or contaminating
substances.
•
Relationship
between
mineralisation
widths and
intercept
lengths
Diagrams
Balanced
reporting
Other
substantive
exploration data
Further work
•
•
The nature and scale of planned further
work (eg tests for lateral extensions or
depth extensions or large-scale stepout drilling).
Diagrams clearly highlighting the areas
of possible extensions, including the
main geological interpretations and
future drilling areas, provided this
information is not commercially
sensitive.
N/A
Relevant diagrams have been included
within the announcement.
N/A
No other substantive data exists.
•
•
•
FBM plans to conduct further target
generative exploration including
Gravity geophysics.
FBM will schedule drill testing of the
Miriam project post geophysical
surveys
Refer to figures/diagrams in the main
body of text.
Future Battery Minerals Ltd
info@futurebatteryminerals.com.au
Suite 10, 38 Colin St, West Perth WA 6005
+61 8 6383 7817
ABN 91 148 966 545
futurebatteryminerals.com.au
ASX: FBM
Follow Us
12
Share your feedback
Discover