QUARTERLY ACTIVITIES REPORT – JUNE 2026
Ore Resources Ltd (ASX: OR3) (Ore or the Company) is pleased to provide its Quarterly Activities Report for the
period ended 30 June 2026.
HIGHLIGHTS
Coolgardie Lithium Projects
New Lithium-focused drilling extends the Big Red and Potoroo pegmatites
• Twenty (20) Reverse Circulation (RC) holes for 3,300m completed at the Kangaroo Hills Lithium Project
(Kangaroo Hills), with the programme having both step-out and infill objectives.0F0F
1
• Successful new extensions defined at both the Big Red and Potoroo pegmatite systems.
• Infill drilling at Big Red confirmed consistent grades and widths over a 500m NE-SW strike, with further
work required to better define higher-grade zones and thickening mineralisation to the north.
• Potoroo remains open and continues to exhibit a N-S strike, highlighting its further growth potential.
Expanded Lithium operating focus including project development and commercialisation options
• Diamond drilling commenced at Kangaroo Hills, targeted at collection of metallurgical and
geotechnical samples to support the advancement of key technical studies.1F1F
2
• Additional 3,000m RC lithium drilling programme scheduled to commence in July 2026, focussed on
follow-up drilling at the Big Red and Potoroo pegmatites along with first-pass drilling of key targets at
the neighbouring Miriam Lithium Project (Miriam).
• Assessment of near-term project development and commercialisation options for Kangaroo Hills
progressing, including potential export Direct Shipped Ore (DSO) or domestic ore sales.
Coolgardie Gold Projects
Expansive gold-focused Phase 4 Drilling Programme
• Phase 4 RC drilling results confirmed multiple new extensions along strike and at depth in both fresh
rock and shallow oxide gold mineralization at the Forrest prospect (Forrest).2F2F
3
o Standout intercept in hole FGRC055 returned 25m @ 2.82 g/t Au from 170m including 5m @ 11.22
g/t Au from 186m, representing a 90m down dip extension to Phase 2 drill hole FGRC027.
• Diamond drilling completed at Forrest, with results confirming that gold mineralisation is hosted
within strongly sheared and altered mafic units associated with the regional-scale Miriam Shear Zone
(Miriam Shear).3F3F
4
1 Refer to OR3 ASX release dated 5 May 2026, “Coolgardie Lithium Project Update” and 23 June 2026, “New Lithium Drilling Extends Big Red & Potoroo”
2 Refer to OR3 ASX release dated 30 June 2026, “Accelerating Coolgardie Lithium Activity”
3 Refer to OR3 ASX releases dated 15 April 2026, “Initial Phase 4 RC Drilling Results Extend Forrest High Grade Gold Mineralisation at Depth”, and 23
April 2026, “Continued Extension of Forrest at Depth and Along Strike”
4 Refer to OR3 ASX release dated 11 June 2026, “Diamond Drilling Confirms Significant Depth and Strike Extensions at Forrest”
oreresources.com.au 2
• Results confirm significant down-dip and southern strike extensions to the emerging gold system at
Forrest, which now extends across a north-south (N-S) strike of approximately 1km and to a vertical
depth of 250m, remaining open both along strike and at depth.
• 15,000m regional Aircore (AC) drilling programme focused on the Burbanks East Gold Project
(Burbanks East) followed by drill testing of regional prospects at the Miriam Gold Project (Miriam)
including Jungle, Forrest North, Burbanks Monarch, Goroke and follow-up drill testing of Canyon.4F4F
5
New exploration targets identified through regional soil sampling and geophysical surveying
• Further regional soil sampling has expanded Miriam with ten (10) +50ppb refined gold anomalies
within a continuous 3.2km long +20ppb Au anomalous corridor, representing discrete high-priority
targets for future drill testing.5F5F
6
• Sub Audio Magnetic (SAM) and ground gravity geophysical surveys, conducted in parallel with
diamond drilling, have highlighted structures coincident with known mineralisation extending beyond
the current drilling footprint, demonstrating strong potential for further growth at Forrest. Four
additional structures identified for future drill testing.
Expansion of Coolgardie gold tenure
• Successful acquisition of four (4) contiguous licenses6F6F
7
to the north of Ore’s Coolgardie Gold and
Lithium Projects, expanding Ore’s landholdings at Coolgardie to over 80km2
.
o New tenure is situated over the Kunanalling Shear Zone and includes the Avoca Prospect
(Avoca), a 300m-long mineralised trend in the south of the tenure.
• Binding option agreement to acquire six (6) tenements adjacent to Miriam.7F7F
8
o New tenure includes the Devils Playground prospect, a 300m-long mineralised trend on the
eastern flank of the 6.2km-long Miriam Shear Zone (Miriam Shear) along with historical
prospects at Blue Bird, Tartan, Burbanks Welcome and Aurifer where no modern exploration
or drilling has been completed.
Kal East Gold Projects
Acquisition of Eastern Goldfields tenure to expand the Kal East Gold Projects
• Successful acquisition of the Randalls Gold Project (Randalls) (both option agreements exercised and
settlement completed) and the Mount Monger tenure.8F8F
9
Corporate and Business Development Pipeline
• Appointment of Mr Alan Tandy as Environmental & Approvals Manager, supporting the fast-tracking
of permitting activities for the Coolgardie Lithium and Gold Projects.2
• Ore is well funded and strongly positioned to advance all planned 2026 exploration programmes at its
Coolgardie Gold and Lithium Projects, with a cash balance of A$6.8 million and zero debt (as at 30 June
2026).
5 Refer to OR3 ASX release dated 29 April 2026, “Regional Aircore Drilling Commenced at Coolgardie Gold Projects”
6 Refer to OR3 ASX releases dated 9 April 2026, “Expanded Soil Sampling Defines New Northern Gold Targets at Miriam”
7 Refer to OR3 ASX releases dated 18 May 2026, “Expansion of Coolgardie Tenure Completed & Cleansing Statement”
8 Refer to OR3 ASX releases dated 28 May 2026, “Consolidation of Miriam Gold Tenure Adjacent to Forrest and the Miriam Shear”
9 Refer to OR3 ASX releases dated 2 April 2026, “Further Consolidation of Eastern Goldfields Projects Completed”, and 7 April 2026, “Randalls Gold
Project Acquisition Completed & Cleansing Statement”
oreresources.com.au 3
Ore Resources’ Managing Director and CEO, Nick Rathjen, commented:
“The June 2026 quarter has proven to be transformational for Ore Resources, marked by a substantial body of
exploration success and the progression of new technical, commercial and strategic initiatives across both our
Coolgardie Gold and Lithium Projects.
“Supported by improving lithium market conditions, growing industry interest and increasing activity
throughout the Coolgardie region, we elected to ramp up and accelerate the exploration and development of
our Coolgardie Lithium Projects. An RC drilling programme was completed at Kangaroo Hills, successfully
extending mineralisation at both the Big Red and Potoroo pegmatites and further reinforcing the project’s
underlying scale, continuity and growth potential.
“As one of Australia’s most advanced, undeveloped lithium projects, Kangaroo Hills reflects a compelling near-
term commercial opportunity with strong strategic flexibility, free from existing offtake commitments. We are
now progressing economic and technical studies to evaluate potential development pathways, including DSO
opportunities, while continuing to engage with potential commercial partners.
“Diamond drilling is underway to collect metallurgical and geotechnical samples to support these studies,
including the assessment of ore sorting opportunities. This programme will be followed by a further 3,000m RC
drilling programme, targeting additional extensions at Big Red and Potoroo, together with initial lithium-
focused drilling at Miriam.
“At our Coolgardie Gold Projects, our expansive Phase 4 drilling programme has continued to deliver
outstanding high-grade results. RC and diamond drilling at Forrest has confirmed strong down-dip continuity of
mineralisation and significant strike extensions, particularly to the south. The emerging gold system at Forrest
now comprises a coherent multi-lode structure extending approximately 1km along strike and to at least 250m
vertical depth, while remaining open both along strike and at depth.
“Beyond Forrest, we commenced a district-wide assessment of gold potential across our broader Coolgardie
project landholdings. This included the acquisition of prospective exploration tenure that complements our
existing gold landholdings. We also commenced a 15,000m regional AC drilling programme targeting several
untested priority gold targets. This programme included first-pass drill testing of the Burbanks East Gold
Project and key Miriam regional prospects including Forrest South, Burbanks Monarch, Goroke and Jungle,
together with follow-up drill testing at Canyon. Results are expected in the coming weeks and will guide future
target generation and further gold-focused drilling.
“With strong exploration momentum building across both lithium and gold, we are well positioned to deliver
new discoveries, unlock further resource growth and create long-term value across our Coolgardie Gold and
Lithium Projects over the second half of 2026 and beyond.”
COOLGARDIE LITHIUM PROJECTS, WESTERN AUSTRALIA
Ore’s Coolgardie Lithium Projects represent more than 13.2km2
of highly prospective granted lithium tenure
strategically located along a key interpreted lithium trend within the Coolgardie Greenstone Belt. The Projects
are situated approximately 17km south of the township of Coolgardie.
Kangaroo Hills Lithium Project
Ore’s lithium exploration activities to date have centred around Kangaroo Hills, first identified in late 2022
through regional exploration drilling which intersected spodumene-bearing lithium-caesium-tantalum (LCT)
oreresources.com.au 4
pegmatites. Subsequent drilling at Kangaroo Hills has delineated the Big Red discovery, a near-surface, shallow
dipping pegmatite system characterised by thick, laterally continuous mineralisation and consistently strong
lithium grades. Big Red is interpreted to form part of a large, coherent LCT pegmatite system, highlighting the
broader prospectivity of Kangaroo Hills and the broader Coolgardie Lithium Projects.
Figure 1: Kangaroo Hills and Miriam Lithium Projects – Plan View
oreresources.com.au 5
RC drilling further expands Kangaroo Hills lithium mineralisation
Between April and May 2026, Ore completed an RC drilling programme at the Coolgardie Lithium Projects aimed
at expanding the known mineralised footprint at Kangaroo Hills. The programme comprised 20 holes for a total
of over 3,300m drilled, including strategic step-out drilling targeting extensions to the Big Red and Potoroo
pegmatites, along with limited infill drilling to support potential future resource delineation and project
advancement.
The RC drilling programme successfully achieved its goal of defining infill and significant strike extensions to both
the Big Red and Potoroo pegmatite systems. The results of this drilling programme were highly encouraging,
highlighting immediate potential for further extensions to Big Red and Potoroo to the north.
Figure 2: Kangaroo Hills Plan View
Big Red
Infill drilling at Big Red successfully demonstrated consistent grades and thickness through drill holes KHRC214,
KHRC211 and KHRC209. These drill holes intercepted:
• 34m @ 1.11% Li2O from 77m including 14m @ 1.63% Li2O from 96m (KHRC214)
oreresources.com.au 6
• 18m @ 1.03 % Li2O from 103m including 10m @ 1.49% Li2O from 103m (KHRC211)
• 28m @ 0.89% Li2O from 68m including 12m @ 1.01 % Li2O from 82m and 9m @ 1.06% Li2O from 68m
(KHRC209)
Step-out drilling north of the 2024 drill lines also successfully intersected lithium mineralisation, returning
encouraging widths and grades. This included a 60m northern extension of Phase 4B drill hole KHRC194
(previously returned 20m @ 0.81% Li2O)9F9F
10
confirmed by drill holes KHRC216 and KHRC200. These holes
returned:
• 12m @ 1.05% Li2O from 147m (KHRC216)
• 10m @ 1.02% Li2O from 145m (KHRC200)
A single drill hole approximately 150m north of KHRC194 intersected spodumene-bearing pegmatites in
KHRC204, which returned 10m @ 0.58% Li2O from 142m. While this intercept confirms continuation of the Big
Red system, it is believed that it did not fully test the thickest or most mineralised zone of the pegmatite. The
higher-grade zone is currently interpreted to deviate further to the northeast and remains open. Follow-up
drilling will be required to test these northern extensions to better define the high-grade trend and controls on
the pegmatite system.
Importantly, these results increase confidence in the continuity of mineralisation across the central and
southern zones of Big Red, now demonstrated to extend over a 500m strike length.
Potoroo
At Potoroo, drilling successfully extended the pegmatite a further 50m north through KHRC201, which
intercepted 8m @ 1.08% Li2O from 130m. To the west, KHRC213 successfully defined continuity of
mineralisation with a 90m western extension, returning 4m @ 1.01% Li2O from 113m.
Importantly, Potoroo continues to exhibit a north-south (N-S) strike of mineralisation, highlighting significant
opportunity for further growth within the Kangaroo Hills tenure footprint.
10 Refer to OR3 ASX release dated 9 July 2024, “Drilling Extends Big Red Pegmatite”
oreresources.com.au 7
Figure 3: Kangaroo Hills – Schematic Long Section
Expanded focus on the Coolgardie Lithium Projects
Following the success of the RC drilling programme, the Company elected to expand its operational focus at the
Coolgardie Lithium Projects. Exploration drilling has recommenced at Kangaroo Hills under a diamond drilling
programme to collect metallurgical and geotechnical samples to support the advancement of key technical and
economic studies. This diamond drilling programme is set to be followed by an additional 3,000m RC drilling
programme, designed to follow-up the May 2026 programme by targeting further extensions to the Big Red and
Potoroo pegmatites.
This RC drilling programme is also planned to include initial drilling of priority lithium targets at Miriam, which
represents high-prospectivity tenure that is yet to be drill tested. The diamond and RC drilling programmes are
expected to be completed by late-July, with assay results expected to be received from late-August 2026.
oreresources.com.au 8
Figure 4: Coolgardie Lithium Projects – Regional Map
Advancing development and commercialisation pathways
Economic studies are in progress to support evaluation of potential export Direct Shipped Ore (DSO) or domestic
ore sales opportunities at Kangaroo Hills, aligned with ongoing engagement with potential commercial partners.
The studies are expected to be completed during H2 CY2026.
Concurrently, the Company is conducting preliminary investigations into the potential application of ore sorting
at the Big Red pegmatite. Material collected from the current diamond drilling programme at Kangaroo Hills is
set to support both ore sorting test work and expanded metallurgical studies (the latter including further
HLS/DMS, flotation, and comminution studies).
Ore continues to assess a range of near-term development and commercialisation pathways for Kangaroo Hills,
strongly aligned with improving lithium market conditions and increasing activity from regional producers.
oreresources.com.au 9
COOLGARDIE GOLD PROJECTS, WESTERN AUSTRALIA
Ore’s Coolgardie Gold Projects represent more than 80km2
of prospective gold exploration tenure located in a
world-class geological and operating region. The Projects are strategically situated within a 50km radius of six
gold mills, three of which are located within a 15km radius.
Expansive 30,000m Phase 4 Drilling Programme over 2026
Ore’s expansive gold-focused Phase 4 drilling programme consists of a combined 30,000m of RC, diamond core
and AC drilling, designed to materially advance gold prospectivity and new discovery potential across the
Coolgardie Gold Projects.
Over January and February 2026, Ore completed an RC drilling programme at Forrest (which sits within Miriam),
consisting of twenty-three (23) RC drill holes for approximately 3,900m drilled. These RC drill holes were
designed to specifically target extensions to high-grade lodes and to test their geometry through off-section,
oriented drilling.
Following the completion of RC drilling, Ore conducted a 1,000m diamond drilling programme in March 2026 to
further test both down-dip and strike extensions across the Forrest gold system. This programme was specifically
designed to improve Ore’s geological understanding of key structural and lithological controls, while also
collecting mineralogy and density information to support expansion of the existing gold footprint at Forrest and
inform future resource estimation work.
In parallel with the diamond drilling programme, Ore engaged a structural consultant from Model Earth Pty Ltd
to undertake a structural review of the gold system. Working in conjunction with Ore’s technical team, this
review has confirmed that mineralisation at Forrest is hosted within near-vertical, highly strained and altered
mafic units.
Regional AC drilling programme
In April 2026, Ore commenced its 15,000m regional AC drilling programme. This large-scale drilling programme
initially focussed on Burbanks East, targeting the 2.7km anomalous gold trend10F10F
11
which sits along strike from
MacPhersons Reward Gold Mine (132koz @ 1.2 g/t Au)11F11F
12
, along with other intrusion-related targets identified
in available magnetic geophysical data.
The programme then shifted to drill testing key regional prospects at Miriam including Jungle, Forrest North,
Burbanks Monarch and Goroke. This drilling includes systematic follow-up drill testing of the Canyon prospect.
11 Refer to OR3 ASX release dated 4 August 2025, “Further Broad Gold Targets at Burbanks East”
12 For more details on the MacPhersons Gold Mine, refer to Beacon Minerals’ (ASX: BCN) Resource and Reserves
oreresources.com.au 10
Figure 5: Location Map – Coolgardie Gold Projects12F12F
13
Miriam Gold Project
The Miriam tenure covers a region of the Coolgardie Greenstone Belt overlying a suite of mafic and ultramafic
units along with felsic intrusives. Miriam also overlies formations and structural trends that host multiple nearby
gold deposits, including Horizon Minerals’ Burbanks (466 koz @ 2.4 g/t Au), Beacon Minerals’ McPhersons
Reward (132 koz @ 1.2 g/t Au) and Focus Minerals’ Coolgardie Operations (2.7 Moz @ 1.8 g/t Au).9
13 Three Mile Hill refer to Focus Minerals ASX Announcement dated 1st December 2023, MacPhersons and Geko refer to Beacon Minerals’ Resource and
Reserves. Burbanks refer to Horizon Minerals Reserves & Resources and Bullabulling refer to Minerals 260 ASX Announcement dated 14th January 2025
oreresources.com.au 11
Figure 6: Miriam Plan View
Phase 4 Forrest RC drilling results
In April 2026, Ore released the results of its Phase 4 RC drilling programme. The first batch of results was released
on 15 April 2026, delivering further extensions to the Forrest gold system, particularly at depth in key fresh rock
lodes and along strike in oxide lodes.
oreresources.com.au 12
The standout intercept of this batch was returned from hole FGRC055, which returned 25m @ 2.82 g/t Au from
170m including 5m @ 11.22 g/t Au from 186m. This drill hole successfully produced a 90m down-dip mineralised
extension to Phase 2 drill hole FGRC027 (which previously reported 12m @ 12.18g/t Au from 48m), highlighting
a significant depth extension and demonstrating strong continuity of this key high-grade gold lode.
Other significant extensions to fresh rock gold lodes included:
• 27m @ 1.54 g/t Au from 135m including 9m @ 3.14 g/t Au from 153m to EOH where it remains open
(FGRC056) representing a 40m down dip extension of FGRC003 (this intercept was subsequently
extended by a diamond core tail – refer to the section on diamond drilling results below)
• 9m @ 3.55 g/t Au from 78m (FGRC066) which extended mineralisation from the oxide lode identified in
hole FGRC038 through to fresh rock
• 6m @ 1.93 g/t Au from 49m (FGRC067) representing a 50m southern strike extension of the western
lode identified in holes FGRC036 and FGRC037 (revised single metre assay)
The second batch was released on 23 April 2026, confirming further extensions to the Forrest gold system 60m
to the south of the Phase 3 drilling limit with intercepts of significant widths and grades.
Key results from this second batch included:
• 15m @ 1.28 g/t Au from 28m including 4m @ 7.61g/t Au from 44m (FGRC059), representing a 50m up-
dip extension into an oxide zone, and a 60m strike extension of shallow oxide mineralisation to the south
(revised single metre assay)
• 30m @ 1.05 g/t Au from 86m including 6m @ 2.36 g/t Au from 107m (FGRC069)
• 8m @ 2.46 g/t Au from 76m (FGRC072) (60m strike extension to the south)
• 6m @ 1.73 g/t Au from 144m (FGRC068) (60m strike extension to the south)
• 7m @ 1.46 g/t Au from 122m (FGRC064) (30m down-dip extension)
Phase 4 Forrest diamond drilling results
On 11 June 2026, Ore released the full results from all seven (7) holes completed during the Forrest diamond
drilling programme. These results confirmed a significant emerging gold system at Forrest with mineralisation
defined to a vertical depth of approximately 250m and extending across a strike length of over 1km.
The most notable result from this batch was returned from hole FGRC056D, which intercepted 33m @ 1.44 g/t
Au from 135m. Other significant intercepts included:
• 11m @ 1.26 g/t Au from 244m (FGRC039D), including 6m @ 2.00 g/t Au from 249m (70m extension
down-dip) and 4m @ 1.58g/t from 268m (155m extension down-dip)
• 11m @ 1.12 g/t Au from 212m (FGDD001) (80m extension down-dip)
• 11m @ 0.93 g/t Au from 290m (FGRC070D) (110m extension down-dip)
Notably, holes FGRC073D and FGRC074D returned significant intercepts of 5m @ 1.28 g/t Au from 187m and
1m @ 2.95g/t from 26m, respectively. Importantly, these two drill holes have successfully extended the Forrest
system along strike by approximately 100m to the south, beyond the limits of previous RC drilling and past the
Forrest South prospect.
oreresources.com.au 13
Figure 7: Forrest Plan View with significant RC and diamond drill results
oreresources.com.au 14
Figure 8: Forrest Schematic – Long Section
While the Phase 4 diamond drilling programme has confirmed the dip orientation and structural characteristics
of the Forrest gold system, drilling does not appear to have intersected the highest-grade portions of the shoots.
Several diamond holes deviated from their planned pierce points, primarily due to highly foliated host rocks that
affected drill-hole trajectories. Current interpretations suggest that the high-grade shoots may be controlled by
a subtle plunge orientation and/or boudinage geometry that has not yet been fully defined by the limited deeper
drilling completed to date.
Ore plans include follow-up drilling to better constrain the geometry, continuity, and plunge orientation of these
high-grade shoots.
Importantly, the Forrest deposit remains open both along strike and at depth, highlighting significant potential
for future drilling to expand this emerging high-grade gold system.
New prospective gold targets identified at Miriam
Updated geochemical soil sampling results
Building on the highly encouraging results from its November 2025 soil sampling programme, Ore undertook
additional geochemical soil sampling at Miriam in January 2026. This soil sampling process involved the use of
Ultrafine+™, an Ultra Fine Fraction (UFF) process co-developed by CSIRO and LabWest. This method analyses <2
micron clay particles for gold and associated gold pathfinder elements and is considered a more refined
detection analysis of soil, which removes coarse particles not considered to be representative of the underlying
oreresources.com.au 15
regolith. Ore previously deployed this technique during its June 2025 programme, achieving significant
exploration success13F13F
14
.
This analysis highlighted that in this region, gold concentrations of <10 ppb Au reflect a consistent background
level in surface soils and sediments, while values of >20 ppb Au (more than twice the background level) are
considered anomalous.
The January 2026 programme comprised 250 UFF samples collected from targets located off or adjacent to the
Miriam Shear, including the Goroke prospect. On 9 April 2026, Ore released the results of this soil sampling
programme, which successfully delineated three (3) additional gold targets in the northern portion of the
Miriam tenure. These targets are defined by coherent and contiguous >50ppb gold-in-soil anomalism.
The identification of these new targets extends the broader >20ppb anomalous gold corridor to a strike length
of approximately 3.2km. This gold trend remains spatially coincident with both the Miriam Shear Zone and
several priority regional targets, including Goroke, Forrest South, Forrest North and Burbanks Monarch.
To date, Ore has now defined ten (10) >50ppb refined gold-in-soils anomalies across the Miriam tenure, with
individual targets exhibiting strike lengths ranging from 200m to 850m.
Figure 9: Forrest South – Burbanks Monarch trend highlighting ten (10) >50ppb Au targets
14 Refer to OR3 ASX release dated 25 June 2025, “Soil Sampling Results Identify 1.75km Gold Anomaly at Miriam”
oreresources.com.au 16
SAM surveying results
In parallel with the diamond drilling programme in March 2026, Ore completed geophysical surveys consisting
of both SAM and ground gravity surveys to identify potential structural controls on mineralisation.
The SAM survey covered a target area from Forrest South through to Forrest North and Burbanks Monarch,
focussing on these known mineralised trends to test the validity of the geophysical methods. High-resolution
data was collected over the Forrest prospect using 25m line spacing while line spacing expanded to 50m from
Forrest North to Burbanks Monarch. Ore conducted litho-structural interpretation of the survey data to better
identify potential mineralised trends. The interpretation relied upon both Magnetometric Conductivity (MMC)
readings and ground gravity total height derivative supporting detailed structural interpretation.
This MMC interpretation identified a prominent linear conductive low at Forrest that coincides with drill
intercepts and is adjacent to a conductive high. This feature is interpreted to represent the mineralised shear
zone and extends approximately 250m south beyond the most recent drilling to the survey boundary, indicating
potential strike extensions at Forrest and the broader Miriam tenure. The total strike length of this feature is
650m with mineralisation associated with both the low and contact to the abutting conductive high.
Ore also identified four largely untested structural targets within the survey area. These targets are
characterised by cross-cutting faults associated with linear conductive lows similar to those at Forrest and are
interpreted as potential fluid pathways favourable for localised gold mineralisation.
oreresources.com.au 17
Figure 10: Sub Audio Magnetic Survey – MMC 1st
Vertical Derivative East Shade Non-Linear
Expansion of the Coolgardie Gold and Lithium Projects
Further consolidation of the Miriam tenure
On 28 March 2026, Ore executed a binding option agreement providing it with the option to acquire six (6)
tenements, comprising four (4) mining leases, one prospecting licence application and one special prospecting
licence application.
These tenements cover highly prospective exploration tenure adjacent to Ore’s Miriam landholdings. Two
mining leases (M15/1255 and M15/1819) are located directly east of and contiguous with the Forrest prospect,
the Company’s flagship deposit at Miriam (Figure 6). M15/1255 overlies the historic Devils Playground prospect
where historical drilling defined consistent gold mineralisation, with all drill traverses intersecting gold
mineralisation across a 300m north–south (N–S) strike extent.
Mining Leases M15/1818 and M15/1352 host several documented gold occurrences recorded in the MINEDEX
database, including the Bell Bird, Tartan, Burbanks Welcome, and Aurifer prospects. Preliminary field
oreresources.com.au 18
investigations have confirmed the presence of historical gold workings and shafts across these tenements, along
with evidence of more recent near-surface gold exploitation. These tenements remain underexplored by
modern exploration drilling and geophysical surveying.
The option agreement also includes two prospecting licence applications. P15/5768-S is a special prospecting
licence application, which grants the right to conduct surface gold exploration to a depth of 50m. P15/5775 is a
prospecting licence application located approximately 750m north of Miriam (Figure 1) and contiguous with
Maritana Minerals’ (ASX: MRT) Burbanks deposit (466 koz @ 2.4 g/t Au).14F14F
15
The grant of these licences remains subject to the submission and approval of a Reserve Activity Management
Plan.
Completion of previous acquisitions
M15/11 mining lease
During the quarter, Ore completed the settlement for the acquisition of the M15/11 mining lease previously
announced in February 2026. The acquired tenure sits within the 1.7km long anomaly representing Canyon and
runs along strike south of the Company’s previous drilling locations at Canyon.
The acquisition involved the payment of A$100,000 in Ore shares (at a deemed issue price equal to the 5-day
VWAP immediately prior to issue), subject to a six-month voluntary escrow period.
Avoca prospect
On 18 May 2026, Ore completed the acquisition of four (4) contiguous prospecting licenses from C