Phase 2 Drilling Underway At Nevada Lithium Project
Released
Released
Announcement PDF
6 June 2023
ASX ANNOUNCEMENT
PHASE 2 DRILLING UNDERWAY AT NEVADA LITHIUM
PROJECT
Highlights
▪
Phase 2 reverse circulation (RC) drill programme at the 80% owned Nevada Lithium Project
(NLP) has now commenced.
▪
The Phase 2 - 3,000m RC programme will target extensions of the thick Lithium (Li) claystone
intercepted at Western Flats earlier this year, which included the discovery holes which
intercepted:
▪
o
109.7m @ 766ppm Li from 135.6m depth to end of hole, including 29m @ 1,010ppm Li from
a depth of 210.3m (WF23-011) (mineralisation remains open)
o
44.2m @ 570ppm Li from 169.2m (WF23-006)
Drilling to be completed over the coming 4-6 weeks at Western Flats, Lone Mountain, and Heller
Prospects.
Future Battery Minerals Ltd (ASX: FBM) (FBM or the Company) is pleased to announce that the Phase 2
reverse circulation (RC) drilling programme at the Nevada Lithium Project (NLP), NV. USA (Future
Battery Minerals 80%) has now commenced.
The Phase 2 programme, consisting of up to 3,000m of RC drilling is aimed at extending the known
Lithium (Li) claystone horizon intercepted in drill hole WF23-011 at the Western Flats Prospect, which
terminated within mineralisation 1. The significant intercept of 109.7m @ 766ppm Li from a 135m downhole depth, importantly hosted a high-grade portion of 29m @ 1,010ppm Li. The significant intercept
has the potential to extend and shallow to the south and west towards the Lone Mountain Prospect
and the newly staked claims contiguous to Western Flats 2. The programme will also drill the regional
Heller Prospect with 3-4 RC holes to test the stratigraphy for potential Li bearing units.
The programme is expected to be completed over the coming 4-6 weeks, managed by the Company’s incountry team with drilling to be carried out by Alford Drilling LLC utilising a Schramm 685 RC drill rig. Given
WF23-011 terminated within Li mineralisation due to the smaller rig size, the larger Schramm RC drill rig will
ensure the planned hole depths are achieved. All clay stone intercepts will be sampled and sent for assay with
results expected in 6-8 weeks post drilling completion.
FBM Technical Director Robin Cox commented:
“FBM is excited to be back drilling again in Nevada, considering the Phase 1 drilling successfully intercepted
thick Li bearing clay stone in the final hole of the programme, which remains open to the south and west and
at depth. The Phase 2 drilling programme will test for extensions to this significant intercept as drilling steps
out on the Lone Mountain Prospect and on the newly staked ground to the west. The programme is a very
important next step in the Company’s exploration of the NLP as we increase our understanding of the potential
scale of this mineralisation.”
1
Refer to 13 April 2023 ASX Announcement – High Grade Lithium Claystone Discovered in Nevada
2
Refer to 23 May 2023 ASX Announcement – Phase 2 Drilling to Commence on Schedule at Nevada Lithium Project
Future Battery Minerals Ltd
info@futurebatteryminerals.com.au
Suite 10, 38 Colin St, West Perth WA 6005
+61 8 6383 7817
ABN 91 148 966 545
futurebatteryminerals.com.au
ASX: FBM
Follow Us
1
Figure 1: Alford Drill Rig at Western Flats - NLP
FBM planned works and update across the Company’s projects is as follows:
Kangaroo Hills Lithium Project (KHLP) (80%)
•
•
•
•
Target Generative Geophysics & Geochemistry
o Magnetic Litho-Structural interpretation - Nearing Completion
o Passive Seismic Trial – Underway
o Ground gravity trial – Underway
o Regional Soil Sampling - Underway
Phase 2 RC Exploration Drilling – Awaiting Assays (23 Holes) – results expected within 7-10 days
Metallurgical and Mineralogical test work– Underway
Phase 3 RC drilling – Planning and permitting nearing completion.
Nevada Lithium Project (NLP) (80%)
•
Phase 2 exploration drilling – Underway
Future Battery Minerals Ltd
info@futurebatteryminerals.com.au
Suite 10, 38 Colin St, West Perth WA 6005
+61 8 6383 7817
ABN 91 148 966 545
futurebatteryminerals.com.au
ASX: FBM
Follow Us
2
Figure 2: NLP Prospects - Phase 1 RC drill hole Location and Assay Results
This announcement has been authorised for release by the Board of Directors of the Company.
-ENDFor further information visit www.futurebatteryminerals.com or contact:
Robin Cox
Technical Director
E: rcox@futurebatteryminerals.com
Mike Edwards
Executive Chairman
E: mike.edwards@futurebatteryminerals.com
Future Battery Minerals Ltd
info@futurebatteryminerals.com.au
Suite 10, 38 Colin St, West Perth WA 6005
+61 8 6383 7817
ABN 91 148 966 545
futurebatteryminerals.com.au
ASX: FBM
Follow Us
3
Competent Persons Statement
The information in this announcement that relates to exploration results is based on and fairly represents information
compiled by Mr Robin Cox BSc (E.Geol), a Competent Person, who is a Member of the Australian Institute of Mining and
Metallurgy. Mr Cox is the Company’s Chief Geologist and has sufficient experience that is relevant to the style of
mineralisation and type of deposit under consideration and to the activity being undertaken to qualify as a Competent
Person as defined in the 2012 Edition of the Australasian Code for Reporting of Exploration Results, Mineral Resources
and Ore Reserves. Mr Cox consents to the inclusion in this announcement of the matters based on his information in the
form and context in which it appears.
Forward-Looking Statements
This document may include forward-looking statements. Forward-looking statements include, but are not limited to,
statements concerning Future Battery Minerals Limited’s planned exploration program and other statements that are not
historical facts. When used in this document, the words such as "could," "plan," "estimate," "expect," "intend," "may”,
"potential", "should," and similar expressions are forward-looking statements. Although Future Battery Minerals Limited
believes that its expectations reflected in these forward-looking statements are reasonable, such statements involve risks
and uncertainties and no assurance can be given that actual results will be consistent with these forward-looking
statements.
Previously Reported Results
There is information in this announcement relating to exploration results which were previously announced on 13 April
2023 and on 23 May 2023. Other than those disclosed in the announcement, the Company confirms that it is not aware of
any new information or data that materially affects the information included in the original market announcement.
Future Battery Minerals Ltd
info@futurebatteryminerals.com.au
Suite 10, 38 Colin St, West Perth WA 6005
+61 8 6383 7817
ABN 91 148 966 545
futurebatteryminerals.com.au
ASX: FBM
Follow Us
4
Share your feedback
Discover