Drilling Extends Big Red Pegmatite
Released
Released
Announcement PDF
09 July 2024
ASX ANNOUNCEMENT
DRILLING EXTENDS BIG RED PEGMATITE
Highlights
All assays received from Phase 4B Reverse Circulation (RC) extensional drilling of Big Red
pegmatite at Kangaroo Hills Lithium Project (KHLP) comprising 19 holes for 3,109m and
stepped-out from Big Red to the north-east.
Results successfully extended the thick, high-grade Big Red pegmatite a further 200m, which
remains open to the north, including significant intercepts:
27m @ 1.04% Li2O from 118m, incl. 15m @ 1.53% Li2O from 122m (KHRC189)
21m @ 1.01% Li2O from 104m, incl. 12m @ 1.44% Li2O from 107m (KHRC190)
18m @ 1.03% Li2O from 100m (KHRC181)
17m @ 1.00% Li2O from 124m (KHRC184)
16m @ 1.02% Li2O from 102m (KHRC188)
20m @ 0.81% Li2O from 123m, incl. 14m @ 1.01% Li2O from 124m (KHRC194)
Extends known footprint of Big Red to over 600m, from outcrop to the northern-most drill
hole intercept to date (KHRC194), where mineralisation remains thick, shallow and open.
Confirms known footprint of Potoroo to over 250m, including the recent Potoroo pegmatite
discovery identified in Phase 4A drilling.
The high-grade Big Red pegmatite sits within the broader approx. 900m long mineralised
footprint of the KHLP.
Next drilling phase commencing this quarter and focussed on key walk-up targets at Miriam.
Cost-effective, targeted exploration approach maintained across KHLP and Miriam tenure.
Future Battery Minerals Ltd (ASX: FBM) (FBM or the Company) is pleased to advise of the receipt of assay
results from Phase 4B drilling activities in the northern area of its 100%-owned Kangaroo Hills Lithium Project
(KHLP) in Western Australia.
FBM Managing Director and CEO, Nick Rathjen, commented:
“The latest phase of KHLP drilling has demonstrated that the Big Red pegmatite and the KHLP more broadly
has plenty to offer. We were targeting up to 200m of further northern strike extent at similar Big Red widths
and grades, and that is exactly what the Phase 4B results have delivered.
“Encouragingly, the dip of Big Red also appears to shallow to the north, averaging approximately -20° around
the northern-most intercept hole, KHRC194. The intercept in this hole returned approximately 20m of thick and
well-mineralised spodumene bearing pegmatite, and at a vertical depth of only around 100m – highlights that
the Big Red system remains open to the north, and relatively shallow.
“While we plan to test for further extension of Big Red to the north, our next phase of drilling is designed to
assess the highly prospective initial targets at our recently acquired, neighbouring Miriam tenure. We continue
to review the planned scale and scheduling of all drilling programmes against the backdrop of challenging
market conditions. We are well funded, with a strong cash position, remain bullish on the long-term lithium
outlook, and remain committed to advancing both the KHLP and Miriam Projects through highly targeted, costeffective exploration.”
Future Battery Minerals Ltd
info@futurebatteryminerals.com.au
Suite 10, 38 Colin St, West Perth WA 6005
+61 8 6383 7817
ABN 91 148 966 545
futurebatteryminerals.com.au
ASX: FBM
Follow Us
1
Further northern extension of Big Red
The key objective of the Phase 4B program at the KHLP was to test for further northern extension of the Big
Red pegmatite, particularly the updated interpretation of a north-easterly dip/plunge direction.
A previous step-out hole (KHRC166), drilled as part of the Phase 4A program, produced a best-to-date KHLP
intercept of 31m @ 1.13% Li2O from 86m, including 20m @ 1.43% Li2O from 88m. 1 A further hole, drilled
vertically at the same location, delivered a shallower intercept of 12m @ 1.02% Li2O from 52m. The significant
displacement of the mineralised pegmatites observed at KHRC164 and KHRC166 has been interpreted as a
normal fault and was further traced south in drilling. This previously unknown structure was considered to have
a controlling factor on the direction of the Big Red pegmatite.
The Phase 4B program comprised 19 RC holes for 3,109m drilled. It was highly successful in extending the
shallow, thick, high-grade Big Red pegmatite by a further 200m to the north-east, with this system remaining
thick, at relatively shallow depth, and still open further to the north.
Figure 1: Plan View KHLP – Phase 4B Drilling Results
The Phase 4B results have extended the known footprint of Big Red to over 600m, from outcrop to the northernmost drill hole intercept (KHRC194). The high-grade Big Red pegmatite sits within the broader approximately
900m long mineralised footprint of the KHLP, which includes the recent Potoroo pegmatite discovery identified
in Phase 4A drilling.
1
Refer to ASX announcement on 15th May 2024 – Big Red Extension and New Discovery at KHLP.
Future Battery Minerals Ltd
info@futurebatteryminerals.com.au
Suite 10, 38 Colin St, West Perth WA 6005
+61 8 6383 7817
ABN 91 148 966 545
futurebatteryminerals.com.au
ASX: FBM
Follow Us
2
Figure 2: Kangaroo Hills schematic long section
Importantly, the overall dip of the Big Red pegmatite appears to be shallowing to the north, averaging closer
to -20° around KHRC194. This results in the intercept in KHRC194 being at a vertical depth of around only
100m, ie still relatively shallow, and with the pegmatite remaining thick, well-mineralised and still open to the
north (with a dip/plunge observed at approx. 015°).
Building Potoroo footprint
As part of the Phase 4A drilling, KHRC178 successfully intercepted 14m @ 1.04% Li2O from 108m. 2
(previously released; refer FBM ASX release dated 15 May 2024, Big Red Extension and New Discovery at
KHLP), approximately 200m to the north of the Big Red extension intercepts in KHRC164/166. Thinner, lower
grade intercepts in this northern zone were also recorded in KHRC170, KHRC171 and KHRC172.
These intercepts to the north / north-west of Big Red Extension, named “Potoroo”, were interpreted to
represent newly discovered pegmatite units (broadly associated with the stacked system of Big Red and
Rocky), as opposed to being the originally targeted Big Red pegmatite. This was evidenced by the relative
depths of the intercepts, the thickness and grades of the pegmatite, along with subtle differences in key
elemental ratios (K:Rb, Ta:Nb and Cs:K).
While not specifically targeted within the Phase 4B program, the Potoroo pegmatite was intercepted within
KHRC193, returning 10m @ 0.93% Li2O from 91m, including 5m @ 1.19% Li2O, piercing the pegmatite
approximately 80m south of KHRC178. This result suggests potential thickening, and increasing of grade, to
the north where the Potoroo pegmatite remains open. The combination of the Phase 4A and 4B drill programs
Confirms known footprint of Potoroo to over 250m.
Scissor drilling directed to the east in Phase 4B (drill holes KHRC180 and KHRC196) intercepted a thick
pegmatite unit up to 36m (KHRC196) down hole thickness named Big Red East. This pegmatite is
discontinuous to Big Red, however the presence of a thick pegmatite near mineralised pegmatites remains
highly prospective – delivering the potential for mineralisation discovery following further targeted exploration
2
Refer to ASX announcement on 15th May 2024 – Big Red Extension and New Discovery at KHLP.
Future Battery Minerals Ltd
info@futurebatteryminerals.com.au
Suite 10, 38 Colin St, West Perth WA 6005
+61 8 6383 7817
ABN 91 148 966 545
futurebatteryminerals.com.au
ASX: FBM
Follow Us
3
as lithium content can vary within individual pegmatite bodies due to mineral zonation. KHRC196 hosts a low
level Li anomalism with a peak assay of 0.27% Li2O from 102m (Down Hole). While low grade and below the
0.3% cut off for reportable significant intercepts, this result suggests that economic levels of Li mineralisation
may potentially further develop at untested locations within this pegmatite.
Miriam drilling and regional strategy
Following the successful further extension of Big Red, FBM’s next phase of drilling is planned at the recently
acquired, neighbouring Miriam tenure. A target-generative magnetic litho-structural geophysical review of
Miriam is in progress, with a soil sampling program also due to commence shortly. The objective of these work
programs is to further refine the initially identified targets on the Miriam ground, prior to finalisation of an initial
drill program, which is expected to commence during the current quarter.
Prior to testing for further extensions of Big Red to the north, and in refinement of prospective regional targets
at the KHLP, the geological team is conducting detailed modelling of the various mineralised and unmineralized
pegmatite systems discovered to date at the KHLP. This work takes into consideration all drilling and mapping
completed to date, building out detailed geochemical and geophysical signatures of the various pegmatites,
including regional targets. It is designed to further refine and derisk the planned future drilling of regional
prospects at the KHLP.
Figure 3: Kangaroo Hills and Miriam Project Location
Future Battery Minerals Ltd
info@futurebatteryminerals.com.au
Suite 10, 38 Colin St, West Perth WA 6005
+61 8 6383 7817
ABN 91 148 966 545
futurebatteryminerals.com.au
ASX: FBM
Follow Us
4
FBM continues to review the planned scale and scheduling of all drilling programmes given current market
conditions. The Company has a strong cash position, is highly constructive on medium, and long-term lithium
fundamentals, and is committed to advancing both the KHLP and Miriam Projects through cost-effective
exploration.
Table 1 – Drill Hole Significant Intercepts
(Intervals represented as down dole length)
From
(m)
58
To
(m)
67
Interval
(m)
9
80
100
88
118
8
18
including
KHRC182
KHRC183
KHRC184
KHRC184
including
KHRC185
KHRC186
KHRC187
KHRC188
including
KHRC189
including
KHRC190
including
KHRC191
KHRC192
KHRC193
KHRC193
KHRC194
including
KHRC195
102
113
11
88
124
130
79
90
141
139
84
2
17
9
5
117
102
104
118
122
104
107
183
121
91
158
123
124
109
122
118
111
145
137
125
119
186
123
101
163
143
138
114
KHRC196
KHRC197
102
103
Hole Id
KHRC179
KHRC180
KHRC181
KHRC181
Li2O
(%)
0.89
NSI
0.43
1.03
Ta
(ppm)
66
Cs
(ppm)
54
Sn
(ppm)
Significant Intercept
27 9m @ 0.89% Li2O from 58m
55
112
75
156
33
39
149
145
47
0.5
75
72
75
182
98
96
64
8
39
44
28
2m @ 0.45% LiO2 from 88m
17m @ 1.0% Li2O from 124
9m @ 1.4% Li2O from 130m
5m @ 0.90% LiO2 from 79m
5
16
7
27
15
21
12
3
2
10
5
20
14
5
1.5
NSI
NSI
0.45
1
1.4
0.9
NSI
0.57
1.02
1.53
1.04
1.53
1.01
1.44
1.21
0.72
0.93
1.19
0.81
1.01
0.42
8m @ 0.43% Li2O from 80m
18m @ 1.03% LiO2 from 100m
including 11m @ 1.5% LiO2 from
102m
53
113
116
108
151
110
129
52
135
115
84
120
136
20
61
98
122
96
99
111
127
89
111
101
56
80
86
2865
31
42
51
35
39
36
43
64
36
33
43
42
46
27
1
0.27
22
507
44
5m @ 0.57% LiO2 from 117m
16m @ 1.02% LiO2 from 102m
7m @ 1.53% LiO2 from 104m
27m @ 1.04% LiO2 from 118m
15m @ 1.53% LiO2 from 122m
21m @ 1.01% LiO2 from 104m
12m @ 1.44% LiO2 from 107m
3m @ 1.21% LiO2 from 183m
2m @ 0.72% LiO2 from 121m
10m @ 0.93% LiO2 from 91m
5m @ 1.19% LiO2 from 158m
20m @ 0.81% LiO2 from 123m
14m @ 1.01% LiO2 from124
5m @ 0.42% LiO2 from 109m
*low level Li anomalism in new
pegmatite
NSI
Future Battery Minerals Ltd
info@futurebatteryminerals.com.au
Suite 10, 38 Colin St, West Perth WA 6005
+61 8 6383 7817
ABN 91 148 966 545
futurebatteryminerals.com.au
ASX: FBM
Follow Us
5
Table 2 – Drill Hole Location Information
(UTM MGA 94 Zone 51)
Hole ID
EASTING
(m)
NORTHING
(m)
KHRC179
KHRC180
KHRC181
KHRC182
KHRC183
KHRC184
KHRC185
KHRC186
KHRC187
KHRC188
KHRC189
KHRC190
KHRC191
KHRC192
KHRC193
KHRC194
KHRC195
KHRC196
KHRC197
317968.8
317970.6
318016.9
318018.5
318022.2
318048.3
318037.7
318119.8
318118.3
317965.7
317936.5
317997.1
318128.2
317934.5
317932.9
317953.6
317951.4
318050.6
318190.4
6558343.7
6558343.6
6558435.2
6558435.2
6558436.4
6558510.7
6558502.6
6558584.9
6558584.9
6558477.6
6558532.7
6558544.6
6558583.7
6558533.9
6558534.1
6558590.1
6558589.1
6558511.0
6558505.4
RL (m)
Azimuth
(degrees
)
Dip
(degrees
)
End of
hole
Depth
(m)
401.3
401.3
395.5
395.4
394.8
393.5
394.0
392.2
392.3
395.1
396.5
395.3
392.1
396.9
397.1
397.1
397.2
394.3
393.6
0
90
270
0
90
270
0
0
270
0
90
0
90
0
270
90
0
90
270
-90
-60
-60
-90
-60
-60
-90
-90
-90
-90
-60
-90
-60
-90
-60
-70
-90
-60
-60
102
120
150
150
150
210
150
174
204
150
186
152
204
156
174
180
168
156
168
Prospect ID
Big Red
Big Red East
Big Red
Big Red
Big Red
Big Red
Big Red
Big Red
Big Red
Big Red
Big Red
Big Red
Big Red East
Big Red
Potoroo
Big Red
Big Red
Big Red East
Big Red East
This announcement has been authorised for release by the Board of Directors of the Company.
-ENDFor further information visit www.futurebatteryminerals.com or contact:
Nicholas Rathjen
Robin Cox
CEO & Managing Director
Technical Director
E: nrathjen@futurebatteryminerals.com.au
E: rcox@futurebatteryminerals.com.au
Future Battery Minerals Ltd
info@futurebatteryminerals.com.au
Suite 10, 38 Colin St, West Perth WA 6005
+61 8 6383 7817
ABN 91 148 966 545
futurebatteryminerals.com.au
ASX: FBM
Follow Us
6
Competent Persons Statement
The information in this announcement that relates to exploration results is based on and fairly represents information
compiled by Mr Robin Cox BSc (E.Geol), a Competent Person, who is a Member of the Australian Institute of Mining and
Metallurgy. Mr Cox is the Company’s Chief Geologist and has sufficient experience that is relevant to the style of
mineralisation and type of deposit under consideration and to the activity being undertaken to qualify as a Competent
Person as defined in the 2012 Edition of the Australasian Code for Reporting of Exploration Results, Mineral Resources
and Ore Reserves. Mr Cox consents to the inclusion in this announcement of the matters based on his information in the
form and context in which it appears.
Forward-Looking Statements
This document may include forward-looking statements. Forward-looking statements include, but are not limited to,
statements concerning Future Battery Minerals Limited’s planned exploration program and other statements that are not
historical facts. When used in this document, the words such as "could," "plan," "estimate," "expect," "intend," "may”,
"potential", "should," and similar expressions are forward-looking statements. Although Future Battery Minerals Limited
believes that its expectations reflected in these forward-looking statements are reasonable, such statements involve risks
and uncertainties and no assurance can be given that actual results will be consistent with these forward-looking
statements.
Previously Reported Results
The information in this announcement that relates to Exploration Results is extracted from the ASX announcements
(Original Announcements), as referenced, which are available at www.futurebatteryminerals.com.au. FBM confirms that it
is not aware of any new information or data that materially affects the information included in the Original Announcements
and, that all material assumptions and technical parameters underpinning the estimates in the Original Announcements
continue to apply and have not materially changed. FBM confirms that the form and context in which the Competent
Persons’ findings are presented have not been materially modified from the original announcement.
Future Battery Minerals Ltd
info@futurebatteryminerals.com.au
Suite 10, 38 Colin St, West Perth WA 6005
+61 8 6383 7817
ABN 91 148 966 545
futurebatteryminerals.com.au
ASX: FBM
Follow Us
7
About Future Battery Minerals (ASX: FBM)
Future Battery Minerals (ASX: FBM) is a future-facing minerals exploration and development company focused
on rapidly advancing its two new world-class lithium discoveries.
Our flagship asset is the 100%-owned Kangaroo Hills Lithium Project (KHLP). The KHLP is located in the
Goldfields of Western Australia, approximately 17km south of the major township of Coolgardie, and hosts the
exciting Big Red, Rocky and Potoroo hard rock lithium discoveries. Immediately north and contiguous to the
KHLP is the Miriam Project, the recent acquisition of which doubled our regional footprint. Miriam is located
immediately along strike from the KHLP and holds a large historic lithium soil anomaly extending from an
outcropping spodumene-rich pegmatite, providing a significant opportunity for future discovery success. These
project areas are being rapidly advanced in parallel by FBM’s experienced team, focusing on resource growth,
metallurgical testwork and development readiness.
The Goldfields are a lithium endowed province of Western Australia, with numerous operating and developing
Lithium projects. Notably, the KHLP is only 30km’s west of the Mt Marrion Lithium Mine operated by Mineral
Resources Ltd (ASX: MIN). KHLP and Miriam are accessible via a sealed road leading south from Coolgardie,
ensuring the Company has continuous access all year-round.
Our other key portfolio asset is the Nevada Lithium Project (NLP). A large-scale, high-grade maiden lithium
claystone Mineral Resource Estimate (MRE) was recently declared for the Lone Mountain deposit within the
NLP, with this MRE being delivered less than 12 months from discovery. The business is evaluating a range
of potential commercialisation routes for the NLP.
About Lithium
Lithium is a soft silvery-white metal which is highly reactive and does not occur in nature in its elemental form.
In nature it occurs as compounds within hard rock deposits, salt brines and claystone. Lithium and its chemical
compounds have a wide range of industrial applications resulting in numerous chemical and technical uses.
Lithium has the highest electrochemical potential of all metals, a key property in its role in lithium-ion batteries.
Future Battery Minerals Ltd
info@futurebatteryminerals.com.au
Suite 10, 38 Colin St, West Perth WA 6005
+61 8 6383 7817
ABN 91 148 966 545
futurebatteryminerals.com.au
ASX: FBM
Follow Us
8
JORC Code, 2012 Edition, Table 1
Section 1: Sampling Techniques and Data
CRITERIA
Sampling
techniques
EXPLANATION
● Nature and quality of sampling (eg cut
channels, random chips, or specific
specialised industry standard
measurement tools appropriate to the
minerals under investigation, such as down
hole gamma sondes, or handheld XRF
instruments, etc). These examples should
not be taken as limiting the broad meaning
of sampling.
● Include reference to measures taken to
ensure sample representivity and the
appropriate calibration of any
measurement tools or systems used.
● Aspects of the determination of
mineralisation that are Material to the
Public Report. In cases where ‘industry
standard’ work has been done this would
be relatively simple (eg ‘reverse circulation
drilling was used to obtain 1m samples
from which 3kg was pulverised to produce
a 30g charge for fire assay’). In other
cases more explanation may be required,
such as where there is coarse gold that
has inherent sampling problems. Unusual
commodities or mineralisation types (eg
submarine nodules) may warrant
disclosure of detailed information.
COMMENTARY
Drilling
Future Battery Minerals Limited (FBM):
● Lithium-Caesium-Tantalum (LCT)
mineralisation at the Kangaroo Hills
Lithium Project (KHLP) has been sampled
from the following drilling techniques.
● Reverse circulation (RC) drilling creates
1m samples of pulverised chips,
approximately 3kg’s is collected in
individual calico bags
● Diamond core drilling (DD) reported
sampling is conducted on quarter core
inorder to preserve bulk sample for
metallurgical test work.
● Rock Chip samples are collected from out
crop, sub crop in the field.
● IP Parameters
Contractor: Vortex Geophysics
Receiver: 1-2x GDD 16 channel IP
Receiver
Transmitter: Vortex VIP-30 transmitter
system rated at 1500V, 30A and 15KVA
Configuration: Dipole-Dipole
Line Spacing: 200m
Dipole spacing: 100m
Domain/Cycle: Time domain – 2 seconds
or 0.125Hz
Drilling
techniques
Drill sample
recovery
● Drill type (eg core, reverse circulation,
open-hole hammer, rotary air blast, auger,
Bangka, sonic, etc) and details (eg core
diameter, triple or standard tube, depth of
diamond tails, face- sampling bit or other
type, whether core is oriented and if so, by
what method, etc).
● Method of recording and assessing core
and chip sample recoveries and results
assessed.
● Measures taken to maximise sample
recovery and ensure representative nature
of the samples.
● Whether a relationship exists between
sample recovery and grade and whether
FBM:
•
RC drilling was conducted on reported
results in this announcement
•
HQ Diamond Core drilling results have
previously been reported.
FBM.
•
Sample recovery is noted in the field for
each individual sample. Sample is
collected via a cyclone and cone splitter
attached to the drill rig, which is
considered standard for RC sampling.
Future Battery Minerals Ltd
info@futurebatteryminerals.com.au
Suite 10, 38 Colin St, West Perth WA 6005
+61 8 6383 7817
ABN 91 148 966 545
futurebatteryminerals.com.au
ASX: FBM
Follow Us
9
sample bias may have occurred due to
preferential loss/gain of fine/coarse
material.
•
•
Logging
Sub-sampling
techniques and
sample
preparation
Diamond core recovery is recorded by
both the drilling contractors and
measured by FBM geologists
No relationship between sample recovery
and grade has been yet observed and no
sample bias is believed to have occurred.
● Whether core and chip samples have been
geologically and geotechnically logged to a
level of detail to support appropriate
Mineral Resource estimation, mining
studies and metallurgical studies.
● Whether logging is qualitative or
quantitative in nature. Core (or costean,
channel, etc) photography.
● The total length and percentage of the
relevant intersections logged.
FBM:
•
Drill chips are lithologically logged by
Geologists in the field
•
Logging is qualitative, recording rock type
and mineral abundance
•
Logging of RC chips is conducted on a 1
metre sample size.
•
Core is logged lithologically by Geologists
in the field.
•
Natural changes in mineral abundance
are recorded
● If core, whether cut or sawn and whether
quarter, half or all core taken.
● If non-core, whether riffled, tube sampled,
rotary split, etc and whether sampled wet
or dry.
● For all sample types, the nature, quality
and appropriateness of the sample
preparation technique.
● Quality control procedures adopted for all
sub-sampling stages to maximise
representivity of samples.
● Measures taken to ensure that the
sampling is representative of the in-situ
material collected, including for instance
results for field duplicate/second-half
sampling.
● Whether sample sizes are appropriate to
the grain size of the material being
sampled.
FBM:
● 1m RC percussion, sample is split via a
cyclone and cone splitter attached to the
drill rig to produce a bagged 3kg sample.
● Certified reference material and blank
material are inserted every 20 samples as
per company QA/QC procedure for both
DD & RC.
● Field duplicates collected from the Cyclone
and cone splitter are inserted every 60
samples
● Sample weights per metre range between
1-3kg.
● Diamond core sampling will consist of cut
core with quarter core utilised for
geochemical assay.
Future Battery Minerals Ltd
info@futurebatteryminerals.com.au
Suite 10, 38 Colin St, West Perth WA 6005
+61 8 6383 7817
ABN 91 148 966 545
futurebatteryminerals.com.au
ASX: FBM
Follow Us
10
Quality of assay
data and
laboratory tests
● The nature, quality and appropriateness of
the assaying and laboratory procedures
used and whether the technique is
considered partial or total.
● For geophysical tools, spectrometers,
handheld XRF instruments, etc, the
parameters used in determining the
analysis including instrument make and
model, reading times, calibrations factors
applied and their derivation, etc.
● Nature of quality control procedures
adopted (eg standards, blanks, duplicates,
external laboratory checks) and whether
acceptable levels of accuracy (i.e. lack of
bias) and precision have been established.
FBM:
● ALS Minerals, Lithium samples have been
fused with Na2O2 and digested in
hydrochloric acid, the solution is analysed
by ICP; laboratory package code MEMS81 ICP-AES, ME-MS91. The method is
considered a whole rock analysis.
● A stoichiometric conversion of Li to Li2O is
applied consisting of a factor 2.153.
● Certified Reference Material (CRM’s) and
quartz blank (Blanks) samples are inserted
1:20 for DD & RC and 1:30 for AC as part
of Future Battery’s QA/QC procedure.
Accuracy and performance of CRM’s and
Blanks are considered after results are
received.
● Field duplicates collected from the Cyclone
and cone splitter are inserted every 30
samples
● Rock Chip samples for Lithium
Investigation have been fused with Na2O2
and digested in hydrochloric acid, the
solution is analysed by ICP ALS Minerals
Laboratories ME-MS81 ICP-AES, MEMS91. The method is considered a whole
rock analysis.
X-Ray Diffraction
● Semi Quantitative X-Ray Diffraction was
caried out on rock chip samples by ALS
Laboratories.
● The analysis provides both a qualitative
assessment of the mineralogy and a
quantitative result.
Verification of
sampling and
assaying
Location of data
points
● The verification of significant intersections
by either independent or alternative
company personnel.
● The use of twinned holes.
● Documentation of primary data, data entry
procedures, data verification, data storage
(physical and electronic) protocols.
● Discuss any adjustment to assay data.
FBM:
•
No third-party verification has been
completed to date
•
Drill holes have not been twinned
•
All primary paper data is held on site,
digitised data is held in a managed
database off site.
•
No adjustments to assays have occurred.
● Accuracy and quality of surveys used to
locate drill holes (collar and down-hole
surveys), trenches, mine workings and
other locations used in Mineral Resource
estimation.
● Specification of the grid system used.
● Quality and adequacy of topographic
control.
FBM:
•
Drill collars were surveyed in
GDA94/MGA Zone 51 datum by handheld
GPS +-5m accuracy
•
At completion of programme drill collars
will be surveyed using a Differential GPS
+- 0.1m accuracy.
•
Rock Chip samples are recoded with
handheld GPS.
Future Battery Minerals Ltd
info@futurebatteryminerals.com.au
Suite 10, 38 Colin St, West Perth WA 6005
+61 8 6383 7817
ABN 91 148 966 545
futurebatteryminerals.com.au
ASX: FBM
Follow Us
11
Data spacing and
distribution
Orientation of
data in relation to
geological
structure
● Data spacing for reporting of Exploration
Results.
● Whether the data spacing and distribution
is sufficient to establish the degree of
geological and grade continuity appropriate
for the Mineral Resource and Ore Reserve
estimation procedure(s) and classifications
applied.
● Whether sample compositing has been
applied.
● Whether the orientation of sampling
achieves unbiased sampling of possible
structures and the extent to which this is
known, considering the deposit type.
● If the relationship between the drilling
orientation and the orientation of key
mineralised structures is considered to
have introduced a sampling bias, this
should be assessed and reported if
material.
Sample security
● The measures taken to ensure sample
security.
Audits or reviews
● The results of any audits or reviews of
sampling techniques and data.
FBM:
•
Drill data spacing is sufficient to establish
the degree of geological and grade
continuity appropriate for this stage of
exploration and understanding of
mineralisation
FBM:
•
Drill holes azimuths are commonly
planned perpendicular to stratigraphic
strike where practicable.
•
Drill hole dip is regarded suitable for
subvertical stratigraphy and provides a
near too true width intersection to
minimise orientation bias.
● The geometry of drill holes relative to the
mineralised zones achieves unbiased
sampling of this deposit type.
● No orientation-based sampling bias has
been identified.
FBM:
•
Drill samples are collected in labelled
polyweave bags and closed with tight zip
ties.
•
Samples are transported within 1-2days
of hole completion by field staff directly to
ALS laboratories.
● No independent audit or review has been
undertaken.
Section 2: Reporting of Exploration Results
CRITERIA
Mineral tenement
and land tenure
status
EXPLANATION
● Type, reference name/number, location
and ownership including agreements or
material issues with third parties such as
joint ventures, partnerships, overriding
royalties, native title interests, historical
sites, wilderness or national park and
environmental settings.
● The security of the tenure held at the
time of reporting along with any known
impediments to obtaining a licence to
operate in the area.
COMMENTARY
● The Kangaroo Hill Lithium Project
consists of 8 prospecting leases.
● P15/5740, P15/5741, P15/5742,
P15/5743, P15/5749, P15/5750,
P15/5963, P15/5965, M15/1887 (in
application), M15/1905 (in application),
P15/6681 (in application), P15/6813 (in
application)
● All leases are held by Eastern
Coolgardie Goldfields Pty Ltd (ECG), a
subsidiary of Future Battery Minerals
Ltd
● Tenements P15/5741, P15/5963 and
P15/5965 overlap the Kangaroo Hills
Timber Reserve, a C class multipurpose reserve
● FBM operated under an approved
Conservation Management Plan within
the reserve.
● No known royalties exist on the KHLP
leases.
● There are no material issues with regard
to access.
Future Battery Minerals Ltd
info@futurebatteryminerals.com.au
Suite 10, 38 Colin St, West Perth WA 6005
+61 8 6383 7817
ABN 91 148 966 545
futurebatteryminerals.com.au
ASX: FBM
Follow Us
12
● The tenements are in good standing
and no known impediments exist.
The Miriam Project consists of 5
prospecting leases.
Granted
leases
are
P15/6136,
P15/6137, P156138 and P15/6139.
P15/6135 remains in application
Leases P15/6136-6139 are he
Share your feedback
Discover