Mount Monger Acquisition Expands Kal East Gold Project
Released
Released
Announcement PDF
ASX Announcement
5 February 2026
ASX: OR3
Follow Us
E. info@oreresources.com.au
P. +618 6383 7817
oreresources.com.au
ORE Resources
Suite 10, 38 Colin St, West Perth WA 6005
Mt Monger Acquisition Expands Kal East Gold Project
Ore Resources Ltd (ASX: OR3) (Ore or the Company) is pleased to announce the acquisition of highly prospective
gold tenure in the Mount Monger goldfields of Western Australia.
HIGHLIGHTS
• Acquisition of 29 prospecting licenses in the Mount Monger goldfields of Western Australia, located
approximately 40km southeast of Kalgoorlie.
• Covers 43km2
of highly prospective gold tenure contiguous to long-established and highly profitable
gold mines including Vault Minerals’ Mount Monger Operations (+3.8 Moz current resource1
).
• Excellent proximity to multiple operating gold process plants, including Vault Minerals’ Randalls Mill
(<10km) and Black Cat Syndicate’s Lakewood Mill (40km), and established transport infrastructure.
• Together with the Randalls Gold Project (located approx. 20km to the east), this tenure acquisition
increases Ore’s landholdings in the Eastern Goldfields to 740.5km2
.
• Randalls and new Mount Monger tenure to be consolidated and named the Kal East Gold Project.
• Key prospective Mount Monger targets identified from initial review of historical drilling, including
Scotch Star, Kims, Rummy, Kess and Three Emus, providing multiple walk-up drilling opportunities.
o 9m @ 6.25 g/t Au from 9m (15MMAC0048) (Kims)
o 3m @ 5.93 g/t Au from 30m (16MMAC1215) (Kims)
o 10m @ 5.80 g/t Au from 61m (12SSRC039) (Scotch Star)
o 16m @ 1.15 g/t Au from 47m (12SSRC040) (Scotch Star)
• The Kims prospect lies directly along strike from the Daisy-Milano geological corridor and hosts
numerous gold intercepts from historical shallow aircore (AC) drilling.
• Approximately 80% of the new tenure is currently granted, enabling the immediate commencement
of Ore’s proven, low-cost exploration strategy.
• Target generative works, including compilation of all historic surface geochemistry and geophysics to
commence, identifying areas where previously defined mineralisation remains open.
• First-pass drilling of Kal East priority gold targets expected to commence in H1 2026.
• Ore is well funded and strongly positioned to advance all planned exploration programmes in 2026,
with a robust cash balance of A$10.7 million and zero debt (as at 31 December 2025).
1
Refer to Vault Minerals (ASX: VAU) Annual Report, dated 15 October 2025
oreresources.com.au 2
Ore Resources’ Managing Director and CEO, Nick Rathjen, commented:
“With the successful acquisition of these new licenses in the Mount Monger region, Ore Resources is now one
of the largest landholders in the Eastern Goldfields with a combined 740.5km2
of prospective gold tenure. The
new tenements are strategically located within a prolific gold producing region, contiguous to Vault Minerals’
Mount Monger Operations and in close proximity to established gold processing and transport infrastructure.
“We are incredibly excited to deploy our proven, low-cost exploration strategy across this new tenure. A
detailed review of historical drilling results has identified five prospective gold targets, representing multiple
walk-up drilling opportunities. Most notably, the Kims prospect lies directly along strike from the Daisy-Milano
corridor and gold mine, representing a high priority target for upcoming testing. The collation of all existing
data pertaining to magnetic geophysics and surface geochemistry will commence shortly, followed by first-pass
drilling of prospective gold targets expected later in H1 2026.
“Due to the prospectivity of the Mount Monger tenure and its proximity to Randalls, we have elected to
consolidate both landholdings into the newly defined Kal East Gold Project. Upcoming exploration at Kal East
will complement our planned 30,000m of Phase 4 drilling at the Coolgardie Gold Projects, which remains our
primary focus for 2026.”
New Mount Monger tenure overview
Ore has entered into a binding tenement sale agreement to acquire 29 prospecting licenses (of which 6 remain
as applications) consisting of 43km2
of prospective exploration tenure within the Mount Monger goldfields,
located approximately 40km southeast of Kalgoorlie. The tenure is readily accessible via the sealed and
sheeted Mount Monger Road, with further access provided by a network of established exploration and
station tracks. Gold was first discovered in the region during the Kalgoorlie gold rush of the 1890s, with gold
mining operations commencing in 1895.
The region hosts numerous small-scale open pit operations, typically mined to depths of less than 100m, as
well as larger underground mining operations, including the Daisy-Milano Mine, which hosts a combined
current resource of approximately 1.56Moz across multiple deposits.2
The new tenure is situated along the
highly prospective Daisy-Milano geological corridor, with the Kims Prospect located directly along strike from
the Daisy-Milano Mine.
The region hosts multiple gold processing facilities within economic trucking distance of the acquired tenure,
including Vault Minerals’ (ASX: VAU) Randalls Mill (<10km), Black Cat Syndicate’s (ASX: BC8) Lakewood Mill
(40km), KCGM’s Fimiston Plant (40km), Gold Fields’ St Ives facility (40km), and Horizon Minerals’ (ASX: HRZ)
Black Swan Processing Plant (60km).
2
Refer to Vault Minerals (ASX: VAU) Annual Report, dated 15 October 2025
oreresources.com.au 3
Figure 1: Project Location Map
The Mount Monger tenements are situated along the Bulong Anticline within the Gindalbie Domain of the
Kurnalpi Terrane, part of the Eastern Goldfields Superterrane of the Archaean Yilgarn Craton, Western
Australia. The tenure overlies both the western and eastern limbs of the anticline, which comprises a
greenstone succession dominated by layered mafic sills, overlain by mafic to intermediate volcanic and
volcaniclastic sequences, as well as the granitic core of the anticline.
Gold mineralisation within the district is both stratigraphically and structurally controlled. At the Daisy-Milano
Mine, mineralisation is typically located below the contact between two main stratigraphic units, namely felsic
and mafic lithologies.
oreresources.com.au 4
Ore’s technical team will undertake a detailed geological evaluation of the tenement package, including
modelling of existing drilling and compilation of regional geochemical and geophysical datasets, to define
priority targets for initial drilling, expected to commence in H1 2026.
An initial review of historical drilling has identified multiple prospects and walk-up targets within the Mount
Monger tenure, including Kims, Scotch Star, Rummy, Kess and Three Emus. All five of these prospects host
significant historical drill intercepts. However, the majority of drilling across the tenure comprises shallow AC
and Rotary Air Blast (RAB) drilling, which predominantly tests regolith and the contact to fresh rock.
Figure 2: Project plan view with drill hole max down hole gold
Limited Reverse Circulation (RC) drilling has been completed at the Kims and Scotch Star prospects. The
number of RC drill holes at both prospects has been deemed insufficient to adequately test the full extent of
mineralisation along strike and down-dip.
oreresources.com.au 5
Notably, the Kims Prospect is located along geological strike from the Daisy-Milano Mine, highlighting the
potential for additional high-grade discoveries at this high-priority prospect.
Significant historical drilling intercepts at these five prospects include:
Kims
• 9m @ 6.25 g/t Au from 9m (15MMAC0048)
• 4m @ 1.54 g/t Au from 60m (17LWRC008)
• 5m @ 2.43 g/t Au from 15m (11NMRC411)
• 3m @ 5.93 g/t Au from 30m (16MMAC1215)
• 1m @ 5.82 g/t Au from 12m (11NMRC446)
• 5m @ 1.04 g/t Au from 49m (NMR426)
Scotch Star
• 10m @ 5.80 g/t Au from 61m (12SSRC039)
• 16m @ 1.15 g/t Au from 47m (12SSRC040)
• 2m @ 1.55 g/t Au from 67m (SSRC15)
Rummy
• 5m @ 7.94 g/t Au from 42m (NMR390)
Kess
• 1m @ 1.96 g/t Au from 36m (NMR354)
• 1m @ 1.12 g/t Au from 40m (NMR359)
• 1m @ 1.00 g/t Au from 43m (NMR502)
Three Emu
• 2m @ 1.46 g/t Au from 13m (11MMAC037)
• 1m @ 1.37 g/t Au from 7m (11MMAC027)
Most historical exploration activity was undertaken in the early 2010s, with a small drilling programme
conducted as recently as 2017. Limited systematic and detailed exploration has been completed over the past
decade, presenting an opportunity for modern exploration techniques to unlock further gold resource
potential.
oreresources.com.au 6
Figure 3: Cross-Section – Scotch Star
oreresources.com.au 7
Acquisition terms
The material terms of the new tenure acquisition agreement are as follows:
• Parties: Ore Resource Co Pty Ltd (100% subsidiary of Ore) as purchaser; and Complete Prospecting Pty
Ltd (an Australian private company unrelated to Ore) as vendor.
• Assets: 100% acquisition of the legal and beneficial interest in 29 prospecting licences (including 6
applications), including associated data/rights.
With respect to any tenement that remains a pending application as at settlement, upon grant of the
applicable tenement, Ore grants Complete Prospecting a non-exclusive authorisation to metal detect
and hand-recover surface gold for a period of 12 months (extendable by agreement up to 24 months),
subject to compliance with laws, access/heritage and safety requirements.
• Consideration (paid at settlement):
o A$300,000 cash, and
o Subject to shareholder approval, A$500,000 in Ore shares (at a deemed issue price equal to
the 5-day VWAP immediately prior to issue) and subject to a 6-month voluntary escrow
period.
• Deferred (milestone) consideration:
o A$600,000 in milestone payments, upon successful definition of 50Koz (A$100,000), 200koz
(A$200,000) and 500Koz JORC compliant Mineral Resource Estimates using a cutoff grade of
not less than 1 g/t Au.
Settlement is conditional on receipt of any necessary shareholder, regulatory or third-party consents and/or
approvals, including shareholder approval to issue the consideration shares at the General Meeting to be held
on 23 February 2026.
Next steps
Ore intends to rapidly deploy its proven low-cost exploration strategy across the acquired Mount Monger
tenure, including undertaking the following key workstreams:
• Detailed litho-magnetic geophysical review, including collation of all public magnetic survey data,
aiming to identify key lithological features across the new tenements.
• Collation and review of all surface geochemical data to compare to potential gold targets identified in
the litho-magnetic geophysical review, ground truthing and mapping.
• Advancement of residual 20% of licenses to grant, including the completion of Heritage Protection
Agreements (HPAs) with the relevant Native Title groups.
Planned exploration works at the Kal East Gold Project will complement Ore’s ongoing exploration programs at
the Coolgardie Gold Projects, which remain the Company’s primary exploration focus for 2026.
This announcement has been authorised for release by the Board of Directors of the Company.
oreresources.com.au 8
For further information, visit http://www.oreresources.com.au/ or contact:
Nicholas Rathjen Robin Cox
CEO & Managing Director Technical Director
E: nrathjen@oreresources.com.au E: rcox@oreresources.com.au
https://oreresources.com.au/link/rJnKbr
Competent Persons Statement
The information in this announcement that relates to exploration results is based on and fairly represents information compiled
by Mr Robin Cox BSc (E.Geol), a Competent Person, who is a Member of the Australian Institute of Mining and Metallurgy.
Mr Cox is the Company’s Chief Geologist and has sufficient experience that is relevant to the style of mineralisation and type
of deposit under consideration and to the activity being undertaken to qualify as a Competent Person as defined in the 2012
Edition of the Australasian Code for Reporting of Exploration Results, Mineral Resources and Ore Reserves. Mr Cox consents
to the inclusion in this announcement of the matters based on his information in the form and context in which it appears.
Forward-Looking Statements
This document may include forward-looking statements. Forward-looking statements include, but are not limited to, statements
concerning Ore Resource Limited’s planned exploration programme and other statements that are not historical facts. When
used in this document, the words such as “could,” “plan,” “estimate,” “expect,” “intend,” “may”, “potential”, “should,” and similar
expressions are forward-looking statements. Although Ore Resources Limited believes that its expectations reflected in these
forward-looking statements are reasonable, such statements involve risks and uncertainties, and no assurance can be given
that actual results will be consistent with these forward-looking statements.
Previously Reported Results
The information in this announcement that relates to Exploration Results is extracted from the ASX announcements (Original
Announcements), as referenced, which are available at www.oreresources.com.au. Ore confirms that it is not aware of any
new information or data that materially affects the information included in the Original Announcements and, that all material
assumptions and technical parameters underpinning the estimates in the Original Announcements continue to apply and have
not materially changed. Ore confirms that the form and context in which the Competent Persons’ findings are presented have
not been materially modified from the original announcement.
oreresources.com.au 9
About Ore Resources Ltd (ASX:OR3)
THE BUSINESS: Gold and lithium exploration and development
Ore Resources (ASX: OR3) is an exploration and development company focused on rapidly advancing its 100%
owned Coolgardie and Kal East Gold and Lithium Projects in the Eastern Goldfields of Western Australia.
THE LOCATION: Infrastructure-rich project setting
The Eastern W.A. Goldfields is an
outstanding location in which to explore for,
build, and operate gold and lithium mines. It
is a long-established mining province with all
the accompanying benefits, including all-
year land access, skilled labour, mining
services and infrastructure.
The Projects are positioned within 50km of
the mining hub of Kalgoorlie (via sealed and
access roads), approximately 370km to the
port of Esperance and approximately 550km
to Perth via road and rail. We are proximal to
multiple gold and lithium mining and
processing operations and development
projects of substantial scale.
This available range of potential
commercialisation options, including
standalone development, positions us well
to monetise current and future success.
THE TEAM: Proven value generators
Our carefully assembled team has an extensive track record of exploration success, project stewardship,
development expertise and operating excellence that has repeatedly resulted in the delivery of substantial
shareholder value: Nick Rathjen (MD), Robin Cox (Technical Director), Nev Power (Chairman), Rob Waugh (NED).
THE CAPACITY: Balance sheet strength and runway
We are a business and team that is resolutely focussed on the stewardship of our shareholders’ capital and the
astute application of this capital for maximal return. We are well-funded to undertake our extensive planned
exploration and evaluation work programs throughout 2026 and beyond.
oreresources.com.au 10
JORC Code, 2012 Edition, Table 1
Section 1: Sampling Techniques and Data
CRITERIA EXPLANATION COMMENTARY
Sampling
techniques
• Nature and quality of sampling (eg cut
channels, random chips, or specific
specialised industry standard
measurement tools appropriate to the
minerals under investigation, such as
down hole gamma sondes, or handheld
XRF instruments, etc). These examples
should not be taken as limiting the broad
meaning of sampling.
• Include reference to measures taken to
ensure sample representivity and the
appropriate calibration of any
measurement tools or systems used.
• Aspects of the determination of
mineralisation that are Material to the
Public Report. In cases where ‘industry
standard’ work has been done this would
be relatively simple (eg ‘reverse
circulation drilling was used to obtain 1m
samples from which 3kg was pulverised
to produce a 30g charge for fire assay’).
In other cases more explanation may be
required, such as where there is coarse
gold that has inherent sampling
problems. Unusual commodities or
mineralisation types (eg submarine
nodules) may warrant disclosure of
detailed information.
• Reverse Circulation drilling collects a 1m
bulk sample. Sampling is then
composited into 4m composites for fire
assay purpose. Anomalous intercepts are
then sub assayed to their 1m sample.
• Air Core drilling collects a 1m bulk
sample. Sampling is then composited into
4m composites for fire assay purpose.
Anomalous intercepts are then sub
assayed to their 1m sample.
• Rotary Air Blast Drilling collects a 1m bulk
sample. Sampling is then composited into
4m composites for fire assay purpose.
Drilling
techniques
• Drill type (eg core, reverse circulation,
open-hole hammer, rotary air blast,
auger, Bangka, sonic, etc) and details
(eg core diameter, triple or standard
tube, depth of diamond tails, face-
sampling bit or other type, whether core
is oriented and if so, by what method,
etc).
• Historic results reported include drilling by
Reverse Circulation (RC), Air Core (AC)
and Rotary Air Blast (RAB).
• The drill type has been specified in the
appropriate collar table.
Drill sample
recovery
• Method of recording and assessing core
and chip sample recoveries and results
assessed.
• Measures taken to maximise sample
recovery and ensure representative
nature of the samples.
• Whether a relationship exists between
sample recovery and grade and
whether sample bias may have
occurred due to preferential loss/gain of
fine/coarse material.
• Results reported are historic and OR3
has relied upon public domain data
reported by previous project holders.
• Recovery was measured/commented in
sample logs.
• No sample bias relationship has been
identified.
Logging • Whether core and chip samples have
been geologically and geotechnically
logged to a level of detail to support
appropriate Mineral Resource
• Results reported are historic and OR3
has relied upon public domain data
reported by previous project holders.
oreresources.com.au 11
CRITERIA EXPLANATION COMMENTARY
estimation, mining studies and
metallurgical studies.
• Whether logging is qualitative or
quantitative in nature. Core (or costean,
channel, etc) photography.
• The total length and percentage of the
relevant intersections logged.
• Drill holes have been lithologically logged
by geologists in the field by respective
historic explorers
• Lithological data has been compiled.
Logging is a qualitative nature.
• Primary lithology has been recorded. Not
all drill logs include data such as
oxidation, texture and structure.
Sub-sampling
techniques and
sample
preparation
• If core, whether cut or sawn and
whether quarter, half or all core taken.
• If non-core, whether riffled, tube
sampled, rotary split, etc and whether
sampled wet or dry.
• For all sample types, the nature, quality
and appropriateness of the sample
preparation technique
• Quality control procedures adopted for
all sub-sampling stages to maximise
representivity of samples.
• Measures taken to ensure that the
sampling is representative of the in-situ
material collected, including for instance
results for field duplicate/second-half
sampling.
• Whether sample sizes are appropriate
to the grain size of the material being
sampled.
• Sampling of drill chips included
compositing by spear sample on 4m
composites.
• Single metre samples were riffle split to
obtain an approximate 3kg sample.
Quality of assay
data and
laboratory tests
• The nature, quality and appropriateness
of the assaying and laboratory
procedures used and whether the
technique is considered partial or total.
• For geophysical tools, spectrometers,
handheld XRF instruments, etc, the
parameters used in determining the
analysis including instrument make and
model, reading times, calibrations
factors applied and their derivation, etc.
• Nature of quality control procedures
adopted (eg standards, blanks,
duplicates, external laboratory checks)
and whether acceptable levels of
accuracy (i.e. lack of bias) and precision
have been established.
The Historic data represented in this
announcement was culminated from the
exploration work conducted the following
parties.
• Silverlake Resource, A no. 95757,
99783, 108656, 114883 and 118055,
Fire Assay AAS and Aqua Regia digest
methods at Genalysis Laboratory Perth
lab codes, B_AAS, B_OES, B_ETA,
B_SAAS, B5_SAAS, B5_AAS
• Ramsgate Resources, A no. 45072,
50gm Fire Assay AAS, 50gm Aqua
Regia AAS, Analabs Perth
• Anglogold Australia Ltd, A no. Aqua
Regia with AAS at Genalysis and Fire
Assay with AAS finish Analabs Perth.
• Loyal Lithium Ltd, A no. 145265, Fire
Assay at ALS
Verification of
sampling and
assaying
• The verification of significant
intersections by either independent or
alternative company personnel.
• The use of twinned holes.
• Documentation of primary data, data
entry procedures, data verification, data
storage (physical and electronic)
protocols.
• Discuss any adjustment to assay data.
• No independent verification has been
conducted
• Field data is imported to the OR3
geochemistry database.
• No adjustments are made to assay data
Location of data
points
• Accuracy and quality of surveys used to
locate drill holes (collar and down-hole
surveys), trenches, mine workings and
other locations used in Mineral
Resource estimation.
• Drill Holes were located utilising a hand
held GPS with a accuracy +/-5m and via
local gridding with later transformation of
local grid values.
oreresources.com.au 12
CRITERIA EXPLANATION COMMENTARY
• Specification of the grid system used.
• Quality and adequacy of topographic
control.
• All drill hole collar information has been
transformed to UTM MGA 94 Zone 51
• Geospatial grid information is
represented in UTM MGA 94 Zone 51
Data spacing
and distribution
• Data spacing for reporting of
Exploration Results.
• Whether the data spacing and
distribution is sufficient to establish the
degree of geological and grade
continuity appropriate for the Mineral
Resource and Ore Reserve estimation
procedure(s) and classifications
applied.
• Whether sample compositing has been
applied.
• Hole spacing ranges from 80 - 200m on
drill lines ranging from 80-500m.
• This data spacing and nature of regional
exploration drilling is appropriate for
identifying continuous and non-
continuous geochemical anomalies.
Further exploration will refine larger
anomalies.
Orientation of
data in relation
to geological
structure
• Whether the orientation of sampling
achieves unbiased sampling of possible
structures and the extent to which this is
known, considering the deposit type.
• If the relationship between the drilling
orientation and the orientation of key
mineralised structures is considered to
have introduced a sampling bias, this
should be assessed and reported if
material.
• Drilling has mostly been conducted on
E/W and NE/SW grid lines. Geological
units in the region have a dominantly N-S
to NW-SE strike. As such the NE/SW and
E-W drilling provides relative oblique
interceptions.
a.
Sample security • The measures taken to ensure sample
security.
• Results reported are historic and OR3
has relied upon public domain data
reported by previous project holders.
• OR3 has not located historic data relating
to sample security
Audits or
reviews
• The results of any audits or reviews of
sampling techniques and data.
No independent audit or review has been
undertaken.
Section 2: Reporting of Exploration Results
CRITERIA EXPLANATION COMMENTARY
Mineral tenement
and land tenure
status
• Type, reference name/number, location
and ownership including agreements or
material issues with third parties such
as joint ventures, partnerships,
overriding royalties, native title
interests, historical sites, wilderness or
national park and environmental
settings.
• The security of the tenure held at the
time of reporting along with any known
impediments to obtaining a licence to
operate in the area.
The Mt Monger Project consists of
29 Prospecting leases.
• Granted leases are P25/2829,
2835, 2836, P26/4764, 4779, 4780,
4781, 4782, 4783, 4784, 4785,
4786, 4787, 4788, 4793, 4794,
4795, 4796, 4797, 4818, 4819,
4820.
• Leases in application include,
P25/2825, 2877, 2878, P26/4840,
4841, 4844.
• Tenements which are in application
require a Heritage Protection
Agreement with the relevant Native
Title Party before they can be
progressed to grant. OR3 has
commenced negotiations regarding
a HPA with all relevant NTP’s.
• The vendors Complete Prospecting
Pty Ltd, will have 24month right to
conduct metal detecting for surficial
gold over tenements P25/2825,
oreresources.com.au 13
CRITERIA EXPLANATION COMMENTARY
2877, 2878, P26/4840, 4841, 4844
following the successful grant of
tenure.
• The tenements are in good standing
and no other known impediments
exist.
Exploration done
by other parties
Acknowledgment and appraisal of
exploration by other parties.
The Historic data represented in this
announcement was culminated from the
exploration work conducted the following
parties.
• Silverlake Resource, A no. 95757,
99783, 108656, 114883 and 118055,
Fire Assay AAS and Aqua Regia
digest methods at Genalysis
Laboratory Perth lab codes, B_AAS,
B_OES, B_ETA, B_SAAS, B5_SAAS,
B5_AAS
• Ramsgate Resources, A no. 45072,
50gm Fire Assay AAS, 50gm Aqua
Regia AAS, Analabs Perth
• Anglogold Australia Ltd, A no. Aqua
Regia with AAS at Genalysis and Fire
Assay with AAS finish Analabs Perth.
• Loyal Lithium Ltd, A no. 145265, Fire
Assay at ALS
Geology Deposit type, geological setting and style of
mineralisation.
• The Mt Monger project is prospective
for oxide, lode and structurally hosted
gold mineralisation hosted within
Archean aged greenstone lithologies.
The project is also prospective for
Lithium, Caesium, Tantalum (LCT)
enriched pegmatites which intrudes
older Archean aged greenstone
lithologies.
Drill hole
Information
• A summary of all information material
to the understanding of the
exploration results including a
tabulation of the following information
for all Material drill holes:
• easting and northing of the drill hole
collar
• elevation or RL (Reduced Level –
elevation above sea level in metres)
of the drill hole collar
• dip and azimuth of the hole
• down hole length and interception
depth
• hole length.
• If the exclusion of this information is
justified on the basis that the
information is not Material and this
exclusion does not detract from the
understanding of the report, the
Competent Person should clearly
explain why this is the case.
• Drill Hole collar tables including
location, height and drill direction have
been included. (Table 2).
• Maximum Au assay has been
represented in the maps. This data is
included in the collar table
• Significant intercept assay data has
been tabled. (Table1)
Data aggregation
methods
• In reporting Exploration Results,
weighting averaging techniques,
maximum and/or minimum grade
• Maximum down hole gold assays have
been included in maps. Cutoff ranges
are shown in legends
oreresources.com.au 14
CRITERIA EXPLANATION COMMENTARY
truncations (eg cutting of high grades)
and cut-off grades are usually
Material and should be stated.
• Where aggregate intercepts
incorporate short lengths of high-
grade results and longer lengths of
low-grade results, the procedure used
for such aggregation should be stated
and some typical examples of such
aggregations should be shown in
detail.
• The assumptions used for any
reporting of metal equivalent values
should be clearly stated.
• Significant intercepts are considered
as intercepts >0.1g/t Au and include
up to 2m internal dilution. This is
considered a significant intercept for
first pass drilling technique such as
RAB and AC or deeper RC and
Diamond.
b.
Relationship
between
mineralisation
widths and
intercept
lengths
• These relationships are particularly
important in the reporting of Exploration
Results.
• If the geometry of the mineralisation
with respect to the drill hole angle is
known, its nature should be reported.
• If it is not known and only the down
hole lengths are reported, there should
be a clear statement to this effect (eg
‘down hole length, true width not
known’).
• All results are reported as down hole
length only. Mineralisation is
interpreted as flat/sub horizontal lodes
however geological understanding is
still insufficient and further drilling
planned by OR3 aims to address the
uncertainty.
Diagrams Appropriate maps and sections (with
scales) and tabulations of intercepts should
be included for any significant discovery
being reported These should include, but
not be limited to a plan view of drill hole
collar locations and appropriate sectional
views.
Relevant diagrams have been included
within the announcement.
Balanced
reporting
Where comprehensive reporting of all
Exploration Results is not practicable,
representative reporting of both low and
high grades and/or widths should be
practiced to avoid misleading reporting of
Exploration Results.
• Assay data has been represented for
all holes drilled in the project area.
Other
substantive
exploration data
Other exploration data, if meaningful and
material, should be reported including (but
not limited to): geological observations;
geophysical survey results; geochemical
survey results; bulk samples – size and
method of treatment; metallurgical test
results; bulk density, groundwater,
geotechnical and rock characteristics;
potential deleterious or contaminating
substances.
No other substantive data exists.
Further work • The nature and scale of planned further
work (eg tests for lateral extensions or
depth extensions or large-scale step-
out drilling).
•
Share your feedback
Discover